Laserfiche WebLink
Intake $ Approval Sheet (FOR PERMIT STAFF ONL1q PERMIT # �� 3Oq — e00- <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Make this a "W" Permit ❑ SRC Requir d (Pre-Insp) <br />Bldg/TI/Addn/Rem Size <br />W <br />Garage/Accessory Struct. Size <br />— <br />Number of Stories <br />Basement <br />ONo ❑Yes , Fin / Unfin <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />Cert. of Occpuancy Required? <br />❑No MYes []Shell Only <br />Code Year <br />❑2021 ❑2018 ❑2015 <br />ICA <br />Fire Sprinklers: ❑Update Existing El New System 1QNot Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: []Update Existing [I New System Mot Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes El No <br />Add'I RCW 64.55 docs required prior to final? ❑Yes IgNo <br />VALUATION CALCULATION: Total $ OeO <br />Additional Notes: <br />Approved By: Date: <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />El Fire Sprinklers El Fire Alarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />❑ Review / Inspection Scope - ADD FIRE FEE <br />Approved By: Date: <br />ELECTRICAL/PLUMBING <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: o Date: b 7i <br />Intake Comments: <br />Zone <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />V -C <br />Proposed No. of Dwelling Units: <br />-f- i <br />Total No. of Dwelling Units: <br />101 <br />Planning/Landscape Inspection Required before Final? ❑Yes XNo <br />"In Lieu" Fee: Type: Amount $ <br />School Impact Fee: Total $ I Se. 64. :S-p <br />Calculated: 4 0 Credit: <br />Everett School Dist ❑Mukilteo School Dist <br />Park Impact Fees for permits applied for after 1/112022: <br />Park Impact Fee Totalet due after credit for existing uses) <br />Fee Schedule Used For Calculation (Year): Zo2-3 <br />Additional Notes: <br />Approved By: ,= -Ap,.,4�Date: (0 2 L <br />PUBLIC WORKS <br />Intake OK by: Date: <br />Intake Comments: PIN Review & Worksheet Needed if.- <br />i❑Sys Dev Eval <br />❑Water ❑Sewer ❑Storm <br />❑Traffic Mitigation Eval <br />Thite Work/Drainage (shown/triggered) <br />[]Address Letter <br />l <br />❑Backflow Prevention for high hazard: <br />(dental, medical, animals, mortuary, <br />:hospital, supportive housing) <br />i <br />i <br />❑ This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is fully digital <br />❑ Is located in this folder <br />❑ Is in a Separate Green Folder (join with this folder for permit issuance) <br />❑ Will be Issued separately (separate Green Folder, PW issued ahead of Bldg) <br />LLA Public Works has no scope on this permit --- PW Not Required <br />Additional Notes: <br />Completed B Date: <br />