Laserfiche WebLink
2/^_.8/24,9:45 PM waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3B0PWx0Z19zY29wZV9uZXdfaW5OZXJpb311NONwZF9pbm10aWFsX3RIbmFudCZOZnY9bHRnX3Njb3B1... <br /> LIGHTING COMPLIANCE SUMMARY i,n : .v( +z r /,,w�, II i1 <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI Admin ered by:©2024 NEEA,All rights reserved <br /> Project Title o TI-2018 WSEC For BuildingDe rtment Use-, r�� 0 2 2024 <br /> j p� Date: Feb 29,2024 <br /> Project Address 5900 36th Ave West <br /> Project&Applicant Everett,WA 98203 Information Applicant Name John Llacuna CITY OF EVERETT <br /> E R E RITT <br /> Applicant Phone 425-646-1818 Permit Services <br /> Applicant Email johnl@SynThesisPLLC.com <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Commercial General Building Use Type Warehouse,Distribution Building Cond.Floor Area 82,635 <br /> New Building or Project Cond.Floor Area 82,635 <br /> Alteration <br /> General Project Types Tenant Spaces—First Build Out Addition Interior Lighting Floors Above Grade I <br /> Lighting Scope Lighting Scope Compliance Method Compliance Method 1-General <br /> "'Lighting Project <br /> Description Interior lighting of new office and warehouse <br /> Lighting Compliance Interior/Exterior LPA Calculation Compliance <br /> Project Type (Interior includes both interior Luminaire Replacement Scope Compliance Method Adjustment Verification <br /> Scope &parking) <br /> and Method Tenant Spaces—First Build Out Interior Lighting Building area Reduced lighting power density option-10% COMPLIES <br /> Project Title Arjo TI-2018 WSEC Date Feb 29,2024 <br /> Lighting Power Calculation TENANT SPACES—FIRST BUILD OUT-INTERIOR LIGHTING Compliance Verification COMPLIES <br /> Compliance Method Building area LPA Calculation Adjustment LPA x 0.9 <br /> Interior Lighting Power Allowance-Building Area <br /> Building Areas Gross Interior Area(SF) LPA(Watts/SF) Total Watts Allowed Total Proposed Watts Compliance Status by <br /> (SF x LPA x 0.9) By Building Area Building Area <br /> Office 6,980 0.64 4,020 3,900 COMPLIES <br /> Warehouse 32,362 0.40 11,651 9,792 COMPLIES <br /> Proposed Lighting Power Density <br /> ill <br /> Watts per Total Watts <br /> Quantity of Fixtures,CLDs or Total Linear Watts per Linear Proposed <br /> Fixture Type/Application Fixture ID Building Area New or Existing-to-Remain Luminaires(#F) Fixture,Cl or Feet(LF) Foot(WpLF) (#F x WpF)or <br /> Luminaire(WpF)45 <br /> 18 <br /> 192 <br /> (LF x WpLF) <br /> Individual Fixtures <br /> Troffer 2x4 LED Recessed Troffer Office New 72 3,240 <br /> Recessed down Recessed 6"LED Office New 27 486 <br /> Suspended High Bay LED Warehouse New 51 9,792 <br /> Wall-mounted LED Strip Light Office New 6 18 108 <br /> Other fixture type l x4 surface mounted Office New 3 22 66 <br /> Project Title; Arjo TI-2018 WSEC Date Feb 29,2024 <br /> Proposed Fixtures Details TENANT SPACES—FIRST BUILD OUT-INTERIOR LIGHTING <br /> Fixture Type/Application Fixture ID Location in Documents Lamp Type Building Area New or Existing-to-Remain <br /> Individual Fixtures <br /> Troffer 2x4 LED Recessed Troffer A6.1 LED Office New <br /> https://www.waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3B0PWx0Z19zY29wZV9uZXdfaW50ZXJ pb31INONwZF9pbm10aW FsX3RIbmFudCZOZnY9bH RnX3Njb3BIX251d 19... 1/2 <br />