Laserfiche WebLink
SOUNDVIEW TECHNOLOGY CENTER <br />EVERETT, WA <br />TABLE OF CONTENTS <br />SECTION <br />PAGE <br />PROJECTOVERVIEW.................................................................................................................................. 1 <br />PROPOSEDIMPROVEMENTS........................................................................................................................ 1 <br />DESIGNCRITERIA......................................................................................................................................... 1 <br />PROJECTLOCATION..................................................................................................................................... 2 <br />MINIMUMREQUIREMENTS.................................................................................................................3 <br />EXISTINGCONDITIONS........................................................................................................................... 8 <br />DEVELOPED CONDITIONS...................................................................................................................... 8 <br />OFFSITE ANALYSIS REPORT................................................................................................................... 9 <br />PERMANENT STORMWATER CONTROL PLAN...........................................................................19 <br />EXISTINGSITE HYDROLOGY.......................................................................................................................19 <br />DEVELOPEDSITE HYDROLOGY..................................................................................................................19 <br />HYDROLOGICMODELING..........................................................................................................................20 <br />FLOWCONTROL SYSTEM...........................................................................................................................20 <br />WATERQUALITY SYSTEM..........................................................................................................................25 <br />CONVEYANCE SYSTEM ANALYSIS AND DESIGN.......................................................................................26 <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN..................................27 <br />SPECIAL REPORTS AND STUDIES......................................................................................................37 <br />OTHERPERMITS........................................................................................................................................37 <br />APPENDIX A <br />SITE EXHIBITS <br />APPENDIX B <br />MAINTENANCE AND OPERATION MANUAL <br />APPENDIX C <br />GEOTECHNICAL ENGINEERING INVESTIGATION REPORTS <br />APPENDIX D <br />DETAILED WWHM REPORTS <br />APPENDIX E <br />WATER QUALITY <br />APPENDIX F <br />CONVEYANCE CALCULATIONS <br />MAY 23, 2017 STORMWATER DRAINAGE REPORT <br />