My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS 47 – Beverly Lake Sewer Replacement Table of Contents - February 7, 2025 <br />WO No. – UP3529 SP - ix <br />8-32.5 Payment ......................................................................................................................................... - 225 - <br />8-40 SUBMERSIBLE PUMP & MOTOR (******) ....................................................................... - 225 - <br />8-40.1 Description ..................................................................................................................................... - 225 - <br />8-40.2 Materials ........................................................................................................................................ - 226 - <br />8-40.3 Construction Requirements ........................................................................................................... - 226 - <br />8-40.4 Measurement ................................................................................................................................. - 227 - <br />8-40.5 Payment ......................................................................................................................................... - 227 - <br />8-42 WET WELL AND BAR SCREEN VAULT (******) ............................................................... - 227 - <br />8-42.1 Description ..................................................................................................................................... - 227 - <br />8-42.2 Materials ........................................................................................................................................ - 227 - <br />8-42.3 Construction Requirements ........................................................................................................... - 227 - <br />DIVISION 9 – MATERIALS ................................................................................................... 229 <br />9-03 AGGREGATES ....................................................................................................................... 229 <br />9-03.6 Vacant ................................................................................................................................................. 229 <br />9-03.6 Aggregates for Asphalt Treated Base (ATB) ...................................................................................... 229 <br />9-03.22 Sand Backfill for Pipe Zone (******) .................................................................................................... 230 <br />9-03.24 Bedding Sand for Interlocking Pavers (******) .................................................................................... 230 <br />9-03.25 Joint Sand for Interlocking Pavers (******) .......................................................................................... 230 <br />9-04 JOINTS AND CRACK SEALING MATERIALS ....................................................................... 230 <br />9-04.12 Watertight Pipe to Manhole Connection Boot (******) ........................................................................ 231 <br />9-04.13 Flexible Coupling (******) ................................................................................................................... 231 <br />9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS ................................................. 231 <br />9-05.4 (2) Mitered Ends .......................................................................................................................................... 231 <br />Delete all paragraphs in 9-05.4(2) and substiture the following: ............................................................................ 231 <br />9-05.12 Polyvinyl Chloride (PVC) Pipe ............................................................................................................ 231 <br />9-05.13 Ductile Iron Sewer Pipe ...................................................................................................................... 231 <br />9-05.15 Metal Castings .................................................................................................................................... 231 <br />9-05.23 High Density Polyethylene (HDPE) Pipe ............................................................................................ 232 <br />9-05.24 Polypropylene Sewer Pipe .................................................................................................................. 232 <br />9-05.32 Insertion Tee (******) .......................................................................................................................... 233 <br />9-05.60 Casing Spacers (******) ....................................................................................................................... 233 <br />9-05.62 Synthetic Rubber Sleeve Seal (******) ................................................................................................ 233 <br />9-05.64 Polypropylene Manhole and Hand Hold Steps (******) ...................................................................... 233 <br />9-05.66 Polypropylene Manhole Ladder (******) ............................................................................................. 233 <br />9-06 STRUCTURAL STEEL AND RELATED MATERIALS ............................................................ 233 <br />9.06-1 Structural Carbon Steel ...................................................................................................................... 233 <br />9-12 MASONARY UNITS ............................................................................................................... 233 <br />9-12.3 Concrete Interlocking Pavers (******) .................................................................................................. 233 <br />9-14 EROSION CONTROL AND ROADSIDE PLANTING ............................................................. 233 <br />9-14.1 Soils .................................................................................................................................................... 233 <br />9-14.2 Seed .................................................................................................................................................... 236 <br />9-14.3 Fertilizer .............................................................................................................................................. 236 <br />9-14.4 Mulch and Amendments ..................................................................................................................... 236
The URL can be used to link to this page
Your browser does not support the video tag.