My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS 47 – Beverly Lake Sewer Replacement Table of Contents - February 7, 2025 <br />WO No. – UP3529 SP - x <br />9-14.6 Plant Materials .................................................................................................................................... 236 <br />9-23 CONCRETE CURING MATERIALS AND ADMIXTURES ...................................................... 237 <br />9-23.2 Liquid Membrane-Forming Concrete Curing Compounds .................................................................. 237 <br />9-23.6 Chemical Admixtures for Concrete ..................................................................................................... 237 <br />9-29 ILLUMINATION, SIGNAL, ELECTRICAL ............................................................................... 237 <br />9-29.2 Junction Boxes, Cable Vaults, and Pull Boxes ................................................................................... 237 <br />9-29.3 Fiber Optic Cable, Electrical Conductors, and Cable ......................................................................... 237 <br />9-29.18 Vehicle Detector ................................................................................................................................. 238 <br />9-30 WATER DISTRIBUTION MATERIALS .................................................................................... 238 <br />9-30.1 Pipe ..................................................................................................................................................... 238 <br />9-30.2 Fittings ................................................................................................................................................ 239 <br />9-30.3 Valves ................................................................................................................................................. 240 <br />9-30.5 Hydrants .............................................................................................................................................. 241 <br />9-30.6 Water Service Connections (2-inches and Smaller) ........................................................................... 241 <br />9-40 SUBMERSIBLE IRRIGATION WELL...................................................................................... 242 <br />9-40.1 Submersible Pump ............................................................................................................................. 242 <br />9-40.2 Submersible Electric Motor ................................................................................................................. 243 <br />9-40.3 Pump Motor Controls .......................................................................................................................... 243 <br />9-40.4 Pump Well Column Pipe ..................................................................................................................... 243 <br />9-40.5 Measuring Conduit Pipe ..................................................................................................................... 243 <br />9-40.6 Wellhead Vault .................................................................................................................................... 243 <br />APPENDIX A – GEOTECH REPORT - BORING LOGS ......................................................... A1 <br />APPENDIX B – COE STANDARD DRAWINGS ..................................................................... B1 <br />APPENDIX C – CHANGE ORDER FORMS ........................................................................... C1 <br />APPENDIX D – PUGET SOUND CLEAN AIR AGENCY – EXCERPTS OF AIR QUALITY <br />RULES .................................................................................................................................... D1 <br />APPENDIX E – NOISE ORDINANCE ..................................................................................... E1 <br />APPENDIX F – SNOPUD PREQUALIFIED AND STD PLANS .............................................. F1 <br />APPENDIX G – TEMP CONSTRUCTION EASEMENT EXHIBIT............................................. G1 <br />APPENDIX H – PREVAILING WAGE RATES & BENEFIT CODE KEY................................... H1
The URL can be used to link to this page
Your browser does not support the video tag.