My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 106 <br />b. Increase the number of working hours per shift, shifts per working day, <br />working days per week, or the amount of Equipment, or any combination of <br />the foregoing. <br />c. Reschedule activities. <br />If requested by the City’s Representative, the Contractor shall prepare a proposed <br />schedule revision demonstrating a plan to make up the lag in progress and insure <br />completion of the Work within the Contract Time. All actions taken to return the Project <br />to the accepted schedule are at the Contractor's expense. <br />The Contractor shall pay all costs incurred by the City that result from the Contractor's <br />action to return the Project to its accepted schedule, including, but not limited to, <br />additional, overtime, or third party inspection, design and construction management <br />service costs. Contractor agrees that City shall deduct such charges from payments <br />due the Contractor. It is further understood and agreed that none of the services <br />performed by the City’s Representative in monitoring, reviewing and reporting Project <br />status and progress shall relieve the Contractor of responsibility for planning and <br />managing construction Work in conformance with the construction schedule. <br /> <br />1-08.4(2) Special Construction Constraints <br />(******) <br />Refer to 1-08.0(2) for work hours. <br />Refer to 1-07.23(1) for construction under traffic and 1.07.23(1)A for general traffic <br />requirements. <br />Phase construction and provide rolling two-week look-ahead schedules in such a <br />manner that: <br /> <br />7404 Evergreen Way – Construction on this site should occur on weekends or in the <br />evenings if possible (Noise Variance required). Otherwise access to the frontage <br />parking the south driveway and southwest parking area shall be always maintained with <br />traffic control. Planned impacts to this property must be planned and shared with the <br />City at each weekly Progress Meeting. Impact planning should include Task Description; <br />Pedestrian & Parking Impacts; Traffic Control Plans; and Schedule of Activities <br />801 75th St SE Beverly Village Apartments – Construction at Beverly Village shall be <br />accessed through the NE corner of the Shoreside Apartment parking lot. Planned <br />impacts to this property must be documented and shared with the City at each weekly <br />Progress Meeting. Impact Planning should include Task Description; Pedestrian & <br />Parking Impacts; Traffic Control Plans; and Schedule of Activities. Contractor shall <br />secure and safeguard work on the Beverly Village site at the end of each work day. <br /> <br />747 75th St SE Lakeside Apartments – Construction at Lakeside shall be accessed <br />through the SE and SW entrances to the Lakeside complex. Pedestrian and traffic and <br />parking access should be always allowed unless previous notice has been provided to <br />the City and property owner’s representative three-days in advance. Impacts to this <br />property must be planned and shared with the City at each weekly Progress Meeting. <br />Impact Planning should include Task Description; Pedestrian & Parking Impacts; Traffic <br />Control Plans; and Schedule of Activities. The contractor shall secure and safeguard <br />work on the Lakeside site at the end of each work day. <br />
The URL can be used to link to this page
Your browser does not support the video tag.