Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 123 <br />2. A deductive Change Order. <br />3. Persistent failure of the Contractor to perform the Work in accordance with <br />the Contract Documents, including failure to maintain the progress of the <br />Work in accordance with the construction schedule. Persistent failure to <br />maintain the progress of the Work shall mean that for a period of two <br />consecutive months following a written notice from the City’s Representative <br />or City, the Contractor fails to correct a behind-schedule condition at a rate <br />that would reasonably indicate that it will finish the Project on schedule. <br />4. Disregard of authority of the City or City’s Representative or the laws of any <br />public body having jurisdiction. <br />5. Liquidated damages. <br />6. Misrepresentation of the quality of materials or Equipment installed or amount <br />of Work performed. <br />7. Discovery that a previous pay estimate erred with respect to the amount of <br />Work performed or Equipment or materials installed, irrespective of the City’s <br />Representative’s recommendation at the time of the progress pay estimate. <br />The City may refuse to make payment of the full amount recommended by the City’s <br />Representative because of Contract Claims made against the City on account of <br />Contractor's performance or furnishing the Work or because of liens filed in connection <br />with the Work or other set offs entitling City to reduce the amount recommended. In <br />such case, the City shall give Contractor prompt written notice with copy to the City’s <br />Representative stating the reasons for each action. <br />1-09.9(4) Final Payment Procedure <br />Upon receipt of Contractor’s written Notice that the Work is ready for final inspection and <br />acceptance and upon receipt of a Final Contract Voucher Certification, the City’s <br />Representative will inspect the Work. If the City’s Representative finds the Work <br />acceptable under the Contract Documents and the Contract fully performed and if the <br />Contractor has signed a Final Contract Voucher Certification, the City’s Representative <br />will issue a final Certificate for Payment. The Certificate for Payment will state that to the <br />best of the City’s Representative's knowledge, information and belief, the Work appears <br />to have been completed in accordance with terms and conditions of the Contract <br />Documents and that the entire balance found to be due the Contractor and noted in the <br />final Certificate is due and payable. <br />Final payment shall not become due until the Contractor submits to the City’s <br />Representative the following; <br />1. an affidavit that payrolls, bills for materials and equipment, and other <br />indebtedness connected with the Work for which the City or the City's <br />property might be responsible or encumbered, less amounts withheld by City, <br />have been paid or otherwise satisfied, <br />2. a certificate evidencing that insurance required by the Contract Documents to <br />remain in force after final payment is currently in effect and will not be <br />canceled or allowed to expire until at least 30 calendar days' prior written <br />Notice has been given to the City, <br />3. a written statement that the Contractor knows of no substantial reason that <br />the insurance will not be renewable to cover the period required by the <br />Contract Documents, <br />4. consent of Surety, if any, to final payment, <br />5. request to Sublet Work Agreements for all Subcontractors,