My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 129 <br /> <br />________________________________, _____________________ <br /> (name) (title) <br />of <br />______________________________________________________ <br /> (company) <br />hereby certifies that the Contract Claim for an adjustment of the <br />Contract Sum and/or Contract Time, if any, made herein for Work on <br />this Contract is a true and complete statement of the factual basis of <br />the Contract Claim and all actual costs incurred and time sought, and <br />is fully documented and supported under the Contract between the <br />parties. <br />Date ______________/s/ __________________________________ <br />Subscribed and sworn before me this ____________ day of _______ <br />Notary Public <br />My Commission Expires: __________________________________ <br />1-09.11(2)C False Or Omitted Information <br />The Contractor waives each Contract Claim for which it presents material <br />information that it knows, or in the exercise of reasonable care should know, is false, <br />or omits or fails to disclose material information relating to such Contract Claim. In <br />such case, Contractor shall reimburse the City for any and all fees and expenses <br />incurred in investigating any such Contract Claim. <br />1-09.11(3) Time Limitation and Jurisdiction <br />(******) <br />The parties intend that all claims and Disputes be dealt with promptly and expeditiously <br />when they arise. The parties intend that all claims and Disputes be resolved quickly and <br />expeditiously and desire to avoid claims and Disputes that relate back to events or Work <br />occurring months before. The parties desire to avoid litigation and the costs and expense <br />of claims and Disputes at the end of the Project. <br />Any Contract Claim for adjustment of Contract Sum or Contract Time, or any Dispute or <br />Contract Claim of any kind whatsoever, shall be submitted, if at all, to the City or City’s <br />Representative no later than 30 calendar days after Notice was first required to be given <br />by the Contractor as provided in 1-04.5 NOTICE BY THE CONTRACTOR. Failure to <br />submit a Contract Claim within the 30 calendar days of the date Notice was required <br />pursuant to 1-04.5 NOTICE BY THE CONTRACTOR constitutes a complete waiver of <br />and bar to the Contract Claim, and Contractor is estopped from later asserting a Contract <br />Claim or seeking any relief or remedy relating to the Dispute for which it failed to submit <br />a Claim. <br />Contractor may not sue, cross-claim, claim, or bring any action of any kind whatsoever <br />against the City on any Contract Claim or Dispute after the expiration of 180 calendar <br />days from Physical Completion. <br /> <br /> <br />Supplement Section 1-09 by adding the following:
The URL can be used to link to this page
Your browser does not support the video tag.