CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47-Beverly Lake Sewer Replacement Division 2 – EARTHWORK February 7, 2025 <br />WO No. – UP3529 SP – 143 <br />Standard Drawing No. 302, unless otherwise noted on the Plans. Grading for <br />pavement patching shall conform to COE Standard Drawing No. 326, unless otherwise <br />noted on the Plans. <br />2-03.2 Vacant <br />Revise 2-03.2 as follows: <br />2.03.2 Materials <br />Materials shall meet the requirements of the following: <br />Foundation Material Class A or B 9-03.17 Standard Specifications <br />Gravel Borrow 9-03.14(1) Standard Specifications <br />2-03.3 Construction Requirements <br />Supplement 2-03.3 by adding the following: <br />Blasting is not allowed within the City limits of Everett. <br />Use suitable excavated material for roadway embankments. Dispose of surplus <br />excavated material or unsuitable material in accordance with 2-03.3(7). <br />Engineer will not approve payment for unauthorized excavation or embankment, or <br />both, beyond the limits indicated on the Plans. Return areas of unauthorized <br />excavation or embankment, or both, to their original conditions or better at the <br />Contractor’s expense. <br />Fine grading in fill or backfill areas shall begin within the top six inches of subgrade. <br />Final grading shall produce a uniform surface within established tolerances and without <br />abrupt changes in grade. <br />Construction requirements for pavement patching authorized by Engineer outside of <br />Project limits shall be in accordance with the Section 5-04 and City Standard Drawing <br />No. 326 for existing asphalt concrete over prepared grade. <br />Provide temporary drainage to keep the subgrade free from standing water. <br />Ensure the top six inches of subgrade is free from rocks or cemented lumps larger <br />than 2-1/2 inches in greatest dimension. <br />Excavate for curbs and gutters by accurately cutting to the cross-sections, grades, and <br />elevations shown. Take care not to excavate below the specified grades. Maintain all <br />excavations free from accumulation of detrimental quantities of leaves, brush, sticks, <br />trash, and other debris. <br />2-03.3(2) Rock Cuts <br />Delete entire section.” <br />2-03.3(3) Excavation Below Subgrade <br />Supplement 2-03.3(3) by adding the following: <br />Proof Rolling: Proof roll subgrade under the roadway with a fully loaded tandem <br />truck following trench backfilling and grading to subgrade to identify soft or loose <br />areas in the subgrade. In areas where the subgrade does not stand up to the <br />proof roll, over excavate the subgrade and replace with imported Foundation <br />Material Class A or B or Gravel Borrow, as determined by the Engineer, to bring <br />the subgrade up to the proper compaction and grade. Compact backfill material in <br />accordance with 2-03.3(3). <br />2-03.3(7) Disposal of Surplus Material <br />2-03.3(7)C Contractor-Provided Disposal Site <br />Delete the first paragraph of 2-03.3(7)C and substitute the following: