My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47-Beverly Lake Sewer Replacement Division 2 – EARTHWORK February 7, 2025 <br />WO No. – UP3529 SP – 144 <br />Make arrangements for disposal of surplus and other materials. All costs for <br />disposal of surplus and other materials shall be included with the respective <br />Bid items of the Contract with no direct compensation being made. <br />Dispose of Asbestos-cement pipe in accordance with the requirements of the <br />State of Washington Department of Ecology and the Snohomish County Solid <br />Waste Division. <br />2-03.4 Measurement <br />Delete all paragraphs under 2-03.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B - Bid Items Descriptions and provided in Section 1-09 <br />MEASUREMENT AND PAYMENT of the Standard Specifications. <br />2-03.5 Payment <br />Delete all paragraphs under 2-03.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />There will be no direct compensation made for haul on material moved within or from <br />the Project site and the Contractor shall include the cost of hauling in his various unit <br />contract prices. <br />There will be no direct compensation made for “Proof Rolling” as required in this <br />section for excavated portions of the roadway and the Contractor shall include costs in <br />his various unit Contract prices. <br />Payment for over excavation below subgrade and disposal of over excavated materials <br />as required in this section shall be included in the Bid item for Foundation Material. <br />Imported material required in this section shall be paid for by the unit Bid price for that <br />material. Payment for placement and compaction of import material shall be included <br />in the unit price per ton of import material. <br />2-04 HAUL <br />2-04.1 Description <br />Delete the first paragraph of 2-04.1 and substitute the following: <br />This Work shall consist of transporting excavated material from its original site to its <br />final place on the Project or to a Contractor arranged waste site. <br />2-04.3 Vacant <br />Revise 2-04.3 to read as follows: <br />2-04.3 Construction Requirements <br />Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br />driveways, trails, sidewalks or parking lots not being improved in the Contract. <br />2-04.4 Measurement <br />Revise 2-04.4 to read as follows: <br />Haul work will not be measured. <br />2-04.5 Payment <br />Revise 2-04.5 to read as follows: <br />All costs for the Work described in Section 2-04 shall be included with excavation work <br />with no direct compensation made.
The URL can be used to link to this page
Your browser does not support the video tag.