My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS 47 – Beverly Lake Sewer Replacement Project Division P PROPOSAL January 30, 2025 <br />Work Order UT 3529 SP – 2 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit price and <br />the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. All entries must be <br />typed or entered in ink.BID SCHEDULE <br />BIDDER:___________________________ <br /> <br /> <br />ITEM <br />NO. <br />ITEM DESCRIPTION UNIT QUANTIT <br />Y <br />UNIT <br />PRICE <br />TOTAL <br />AMOUNT <br />1 MOBILIZATION LS 1 N/A $______.___ <br />2 SURVEYING LS 1 N/A $______.___ <br />3 SPCC PLAN / TEMPORARY EROSION AND <br />SEDIMENTATION CONTROL <br />LS 1 N/A $______.___ <br />4 TRENCH AND EXCAVATION SAFETY SYSTEM LS 1 N/A $______.___ <br />5 TEMPORARY PUMPING / BYPASS LS 1 N/A $______.___ <br />6 DEMOLITION - CURB, ASPHALT, FENCING, <br />SEWER ABANDONMENT, PAVEMENT, <br />CONCRETE, MH, CB, FENCING, LANDSCAPING, <br />ELECTRICAL, VEGETATION <br />LS 1 N/A $______.___ <br />7 TRAFFIC CONTROL LABOR HR 400 $______.___ <br />8 MAINTENANCE AND PROTECTION OF TRAFFIC <br />CONTROL <br />LS 1 N/A $______.___ <br />9 STREET CLEANING AND SITE CLEANUP HR 50 $______.___ <br />10 STRUCTURAL FILL TN 750 $______.___ <br />11 CRUSHED SURFACING BASE COURSE TN 790 $______.___ <br />12 SAWCUT PAVEMENT FULL DEPTH LF 590 $______.___ <br />13 SAWCUT CONCRETE CURB, GUTTER AND <br />SIDEWALK <br />LF 20 $______.___ <br />14 LIFT STATION STRUCTURE BELOW GRADE - <br />CONCRETE BASE SLAB, REINFORCEMENT, <br />HATCHES, GROUT FILL, VAULTS ETC <br />LS 1 N/A $______.___ <br />CITY OF EVERETT SCHEDULE A <br />LIFT STATION NO. 47 - BEVERLY LAKE SEWER REPLACEMENT PROJECT
The URL can be used to link to this page
Your browser does not support the video tag.