My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS 47 – Beverly Lake Sewer Replacement Project Division P PROPOSAL January 30, 2025 <br />Work Order UT 3529 SP – 2 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit price and <br />the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. All entries must be <br />typed or entered in ink.BID SCHEDULE <br />BIDDER:___________________________ <br /> <br /> <br />ITEM <br />NO. <br />ITEM DESCRIPTION UNIT QUANTIT <br />Y <br />UNIT <br />PRICE <br />TOTAL <br />AMOUNT <br />1 MOBILIZATION LS 1 N/A $______.___ <br />2 SURVEYING LS 1 N/A $______.___ <br />3 SPCC PLAN / TEMPORARY EROSION AND <br />SEDIMENTATION CONTROL <br />LS 1 N/A $______.___ <br />4 TRENCH AND EXCAVATION SAFETY SYSTEM LS 1 N/A $______.___ <br />5 TEMPORARY PUMPING / BYPASS LS 1 N/A $______.___ <br />6 DEMOLITION - CURB, ASPHALT, FENCING, <br />SEWER ABANDONMENT, PAVEMENT, <br />CONCRETE, MH, CB, FENCING, LANDSCAPING, <br />ELECTRICAL, VEGETATION <br />LS 1 N/A $______.___ <br />7 TRAFFIC CONTROL LABOR HR 400 $______.___ <br />8 MAINTENANCE AND PROTECTION OF TRAFFIC <br />CONTROL <br />LS 1 N/A $______.___ <br />9 STREET CLEANING AND SITE CLEANUP HR 50 $______.___ <br />10 STRUCTURAL FILL TN 750 $______.___ <br />11 CRUSHED SURFACING BASE COURSE TN 790 $______.___ <br />12 SAWCUT PAVEMENT FULL DEPTH LF 590 $______.___ <br />13 SAWCUT CONCRETE CURB, GUTTER AND <br />SIDEWALK <br />LF 20 $______.___ <br />14 LIFT STATION STRUCTURE BELOW GRADE - <br />CONCRETE BASE SLAB, REINFORCEMENT, <br />HATCHES, GROUT FILL, VAULTS ETC <br />LS 1 N/A $______.___ <br />CITY OF EVERETT SCHEDULE A <br />LIFT STATION NO. 47 - BEVERLY LAKE SEWER REPLACEMENT PROJECT
The URL can be used to link to this page
Your browser does not support the video tag.