My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br />LS 47 – Beverly Lake Sewer Replacement Project Division P PROPOSAL January 30, 2025 <br />Work Order UT 3529 SP – 3 <br />15 LIFT STATION ABOVE GRADE - ELECTRICAL <br />SHELTER, ELECTRICAL RACK, WATER SERVICE, <br />CONCRETE ETC <br />LS 1 N/A $______.___ <br />16 SUBMERSIBLE PUMP ASSEMBLIES - PUMPS, <br />FRAME, DISCHARGE ASSEMBLY, SENSORS, DI <br />PIPE TO 6" FM ETC <br />EA 2 $________._ <br />__ <br />17 ELECTRICAL, VFD PANEL INSTALL LS 1 N/A $______.___ <br />18 ELECTRICAL - CONTROLS AND <br />INSTRUMENTATION, PULSAR LEVEL SENSOR, <br />ETC <br />LS 1 N/A $______.___ <br />19 PLC CONTROL CABINET INSTALL AND <br />TERMINATIONS <br /> <br />20 ELECTRICAL MISCELLANEOUS - SITE POWER, <br />HOUSE POWER, LIGHTING, ELECTRICAL RACK <br />AND SHELTER ETC <br />LS 1 N/A $______.___ <br />21 STANDBY GENERATOR - TRANSFER SWITCH, <br />LOAD BANK, DOCKING STATION ETC <br />LS 1 N/A $______.___ <br />22 TRENCH EXCAVATION INCLUDING HAUL CY 427 N/A $______.___ <br />23 TEMP ACCESS PATH AND REMOVAL TN 150 $______.___ <br />24 FORCE ACCOUNT FA 1 N/A $__95,500.00 <br />25 HDPE SANITARY SEWER MAIN, 8-Inch Diam. <br />(Horizontal Directional Drill [HDD] - and/or <br />Trenched) <br />LF 590 $______.___ <br />26 HDPE SANITARY SIDE SEWER AND FORCE MAIN, <br />6-Inch Diam. (HDD) <br />LF 645 $______.___ <br />27 HDPE SANITARY SEWER MAIN (TRENCHED), 8- <br />Inch Diam. <br />LF 50 $______.___ <br />28 PVC SANITARY SIDE SEWER LATERAL, 6-Inch <br />Diam. <br />LF 150 $______.___ <br />29 MANHOLE TYPE 3, 48" EA 6 $______.___ <br />30 MANHOLE TYPE 3, 48" (MORE THAN 7' DEEP) LF 24 $______.___ <br />31 HDPE FORCE MAIN, 6-Inch Dia. - Trenched LF 50 $______.___ <br />32 WATER SERVICE, 1-INCH ENCASED IN 4” HDPE <br />(HDD) <br />LF 1100 $______.___ <br />33 WATER SERVICE CONNECTION, 1-INCH EA 1 $______.___ <br />34 UG POWER FROM LS TO JCT BOX .(2-2" Conduit <br />HDD) <br />LF 475 $______.___
The URL can be used to link to this page
Your browser does not support the video tag.