My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025 <br />WO No. – UP3529 SP - 4 <br />and other information necessary for production of the Record Drawing (As-Constructed) <br />documents meeting the requirements defined in RECORD DRAWINGS of these Special <br />Provisions. <br />Partial payments will be made for the lump sum contract price for “Surveying” as follows: <br />(a)When 10% of the total original contract amount is earned from other bid items, <br />50% of the amount bid for surveying will be paid. <br />(b)When redlines are received for preparing RECORD DRAWINGS, including all <br />information described above, 100% of the amount bid for surveying will be paid. <br />Bid Item 3 - SPCC Plan / TESC <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for the Spill Prevention, Control and Countermeasures (SPCC) Plan <br />includes, but is not limited to, all costs associated with complying with the requirements of <br />Section 1-07.15(1) of the Standard Specification. <br />Bid Item 4 - Trench Excavation Safety Systems <br />Measurement and Payment: Lump Sum (LS) <br />The bid item includes the costs directly allocated to the safety system for trenches and all <br />other excavations including, but not limited to, shoring, benching, bracing, excavation, <br />sheeting, and trench box. This Work shall be accomplished in accordance with Divisions 1, <br />2, 7, and 8 of the Standard Specifications and these Special Provisions. Payment per lump <br />sum includes all equipment, materials, labor, installation, and removal, and all other work <br />required to meet the trench excavation and safety system requirements. <br />Bid Item 5 - Temporary Bypass Pumping <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid item for Temporary Bypass Pumping shall be full compensation for <br />materials, work, labor and equipment necessary to furnish, install, and maintain temporary <br />facilities necessary to maintain the continual sewer flow and to prevent wastewater discharge <br />to the environment throughout the duration of constructing new or rehabilitating existing <br />sanitary sewer or combined sewer mains, or both, within the Project. A “Cutover/Bypass <br />Plan” must be submitted within 15-days of Notice To Proceed for review and approval. The <br />LS price shall be full compensation to complete the Work in accordance with the Plans, COE <br />Standard Drawings, and Section 7-21 of these Special Provisions <br />Measurement and payment for temporary bypass pumping shall be as a lump-sum item, <br />complete. <br />Bid Item 6 - Demolition <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid item includes full compensation for providing <br />All costs associated with abandoning and/or removing and disposing of existing manholes, <br />sewer, asphalt, catch basins, pavement, concrete, curbs, fencing, landscape features, <br />unused electrical conductors, and vegetation as shown on the plans shall be included in the <br />unit price for this bid item. <br />Measurement and payment for Demolition shall be as a lump-sum item, complete.
The URL can be used to link to this page
Your browser does not support the video tag.