My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025 <br />WO No. – UP3529 SP - 6 <br />Bid Item 11 - CRUSHED SURFACING BASE COURSE <br />Measurement and Payment: Unit Price per Ton (TN) <br />Measurement for crushed surfacing base course will be by the ton as recorded on certified weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions defined in the Work, descriptions for other bid items, shown on the Plans, details or COE Standard Drawings or as otherwise approved by the Engineer. In addition to surfacing, this product will be paid by the ton for sewer and storm pipe bedding. Crushed Surfacing Base Course material placed exceeding “neatline” quantities without advance authorization by the Inspector will not be paid for. The unit price per ton shall be full compensation for all labor, compaction, material, tools, and equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed surfacing base course for the Work as required, from a Contractor supplied source in accordance with the Standard Specifications and these Special Provisions. The unit price for crushed surfacing base course also includes all costs for controlling moisture content and all costs for dewatering. Also included in this bid item shall be the cost of all equipment required to remove existing soils to attain proper elevations, compaction of native subgrade soils, as well as to uniformly spread and compact the crushed surfacing material. The unit price for this bid item includes all costs for removing, loading and disposing of displaced unsuitable material, including haul. Include in this bid item the cost of sprinkling during dry periods prior to placement of the crushed surfacing and while spreading and compacting the material. <br />Payment for crushed surfacing base course will be by the ton of material placed and <br />approved by the Inspector. <br />Bid Item 12 - SAWCUT PAVEMENT FULL DEPTH <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br />The unit price per lineal foot for the final saw-cutting of asphalt, concrete, steel rail, wood tie, <br />roadway debris material, or any combination of materials thereof, regardless of depth or <br />location of materials, shall be full compensation for all labor, material, tools, and equipment <br />necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of these <br />Special Provisions and as shown on the Plans. The unit price per lineal foot for saw-cutting <br />includes, but is not limited to, the saw-cutting necessary for the final joint between existing <br />improvements and permanent HMA pavement. <br />Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br />item as there will be no separate payment for cleanup. Any necessary re-cutting due to <br />damage during excavation will not be remeasured for payment. <br />Bid Item 13 - SAW-CUTTING CONCRETE CURB & GUTTER & SIDEWALK <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br />The unit price per lineal foot for the final saw-cutting of concrete curb and gutter and sidewalk, <br />shall be full compensation for all labor, material, tools, and equipment necessary to <br />satisfactorily complete the Work as specified in Section 2-02.3(3) of these Special Provisions <br />and as shown on the Plans. The unit price per lineal foot for the final saw-cutting of concrete
The URL can be used to link to this page
Your browser does not support the video tag.