Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025 <br />WO No. – UP3529 SP - 7 <br /> <br />curb and gutter and sidewalk includes, but is not limited to, the saw-cutting necessary for the <br />final joint between existing concrete sidewalk or curb and permanent concrete repair. <br />Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br />item as there will be no separate payment for cleanup. <br /> <br />Measurement and payment for the SAWCUT CONCRETE CURB, GUTTER AND <br />SIDEWALK shall be per Linear Foot (LF), complete. <br /> <br />Bid Item 14 - PUMP STATION BELOW GRADE <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid item for the pump station below grade shall be full compensation for all <br />labor, material, incidentals, tools, and equipment necessary to satisfactorily complete the <br />work as defined in the Standard Specifications, Standard Drawings, these Specifications, <br />and as shown on the Contract Plans. <br /> <br />The installation of the pump station structure below grade shall include, but is not limited to, <br />the following: excavation, structural fill, hauling, forming, foundation, fabrication, erection, <br />concrete, structural steel supports, “wye” vault with H-20, hatches, bar screen vault with H- <br />20 hatches, bar screen assembly, wet well and access with H-20 hatches, concrete base <br />slab, grout, fill, and other miscellaneous and appurtenant work. <br /> <br />Measurement and payment for the pump station structure below grade shall be as a lump- <br />sum item, complete. <br /> <br />Bid Item 15 - PUMP STATION STRUCTURE ABOVE GRADE <br />Measurement and Payment: Lump Sum <br />The unit contract price for the pump station structure above grade by lump sum and shall be <br />full compensation for all labor, material, incidentals, tools, and equipment necessary to <br />satisfactorily complete the work as defined in the Standard Specifications, Standard <br />Drawings, these Specifications, and as shown on the Contract Plans. <br /> <br />The installation of the pump station structure above grade shall include, but is not limited to, <br />the following: electrical shelter, electrical rack, framing, fabrication, erection, concrete , steel <br />brackets, anchor bolts, reinforcement, steel roof, framing, flashing, roof sheeting, grating, <br />shelter framing and supports, coatings, standby generator foundation/pad, transformer pad, <br />site low voltage and electrical conduits and other miscellaneous and appurtenant work. <br /> <br />Measurement and payment for the pump station structure above grade shall be as a lump- <br />sum item, complete. <br />. <br />Bid Item 16 - SUBMERSIBLE PUMP ASSEMBLIES <br />Measurement and Payment: Per Unit Price (EA) <br />The unit contract price for the pump assemblies by (EA) and shall be full compensation for <br />all labor, material, incidentals, tools, and equipment necessary to satisfactorily complete the