Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025 <br />WO No. – UP3529 SP - 11 <br />Bid Item 24 - FORCE ACCOUNT <br />Measurement and Payment: Force Account (FA) <br />This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br />ACCOUNT; except, as modified below. <br />The Force Account bid item has been included for specific miscellaneous work items listed <br />below and for any additional work directed by the Engineer that is not required by the original <br />Contract and to address changed conditions or unanticipated work. The amount indicated in <br />the Proposal for this bid item is to provide a common bid amount. The actual amount paid <br />under this bid item may vary from no payment to the full amount of the bid item. Work <br />performed under this bid item will be initiated with a work directive issued by the Engineer. <br />In lieu of the preceding prescribed method of determining payment for Force Account work, <br />payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br />Contractor prior to beginning the Force Account work. <br />The following miscellaneous construction work will be paid for by Force Account as specified <br />in 1-09.6 FORCE ACCOUNT. For the purpose of providing a common Proposal for all <br />Bidders, and for that purpose only, the City has estimated an amount and included it in the <br />bid item for Force Account work to become part of the total Bid by the Contractor. <br />(a)The contractor will provide potholing for establishing and confirming utility <br />location and depth of utilities that are not shown on the plans, not incidental to a <br />separate bid-item, or for potholing requested by the Engineer. Potholing of <br />utilities that are shown on the plans shall be considered incidental to the <br />associated work items and no separate payment will be made. Potholing of <br />utilities not shown on the plans, not incidental to a separate bid item or as <br />directed by the Engineer prior to proceeding with the work, will be paid under this <br />section. Includes all costs of labor, equipment, permits and incidentals to <br />excavate, identify and survey the utility and restore if necessary. <br />(b)Cost for additional excavation, hazmat abatement, fittings, and labor to make <br />grade adjustments to the new utilities for unknown underground conflicts and <br />conflicts due to being unmarked or mismarked utilities in the field. Unanticipated <br />underground conflicts is one we typically see, private improvement restoration <br />and other modifications is another, sewer work changes, water pipe installation <br />changes, and above ground conflicts. <br />(b)Restoration of existing special private improvements including, but not limited to, <br />brick or stone walkways, decorative concrete walks or driveways, concrete <br />masonry or stone walls, rockery’s, fences, landscape plantings, including but not <br />limited to, hedges, trees, flowerbeds, irrigation systems, yard lighting, rockeries, <br />retaining walls, or steps. <br />Bid Item 25 - HDPE SANITARY SEWER MAIN, 8-Inch Diam (HDD and/or TRENCHED). <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Per linear foot pipe measurement shall be based on the slope distance from point to point. <br />The point of beginning or ending of measurement in any particular run of pipe shall be the <br />vertical intersection of the centerline of the pipe measured with the centerline of the <br />intersection pipe, or with the beginning or ending of any new linear length of valves or <br />couplings contained within the measured length. At changes in pipe size connected by a <br />reducer, the point of measurement shall be taken as the midpoint of the reducer. <br />The unit contract price for HDPE SANITARY SEWER MAIN, 8-Inch Diam., shall constitute <br />full compensation for all labor, materials, tools and equipment necessary to furnish and install