Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025 <br />WO No. – UP3529 SP - 14 <br /> <br /> <br />Bid Item 27 - HDPE SANITARY SEWER (TRENCHED), 8-inch <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Per linear foot pipe measurement shall be based on the slope distance from point to point. <br />The point of beginning or ending of measurement in any particular run of pipe shall be the <br />vertical intersection of the centerline of the pipe measured with the centerline of the <br />intersection pipe, or with the beginning or ending of any new linear length of valves or <br />couplings contained within the measured length. At changes in pipe size connected by a <br />reducer, the point of measurement shall be taken as the midpoint of the reducer. <br />The unit contract price for PVC SANITARY SEWER MAIN, 8-Inch Diam., shall constitute full <br />compensation for all labor, materials, tools and equipment necessary to furnish and install <br />the pipe, restrained joints (where shown on the Plans or as required by the Standard <br />Specifications and Special Provisions), and all fittings, including tees, crosses, reducers, <br />couplings, material transitions and sleeves required for complete installation along the run of <br />each pipe size, as shown on the Plans and specified herein, and additionally, shall include, <br />but not be limited to, the following: <br />(a) Removal of structures or obstructions not specifically covered under other Bid <br />Items. This shall include, but not be limited to, removal and disposal of the <br />existing asphalt or concrete pavement, sidewalk, curb, thrust blocks, <br />miscellaneous landscaping, and sod as indicated on the Plans. <br />(b) All required potholing to verify locations of water service crossings and existing <br />utilities. The costs for potholing and excavation required to determine exact <br />depths and locations of other utilities shall be included with this Work with no <br />direct compensation made. <br />(c) Utility or light pole holding in conformance with the requirements of the applicable <br />utility including, if necessary, arranging for the utility to hold poles and paying the <br />associated fees. <br />(d) Where trench excavation is proposed, dewatering, installation of pipe, furnishing, <br />placing, and compacting sand backfill for pipe bedding, furnishing, placing and <br />compacting suitable native material for trench backfill and placing and <br />compacting imported backfill material. No extra payment shall be made for <br />removing, loading, hauling, and disposing of displaced and unsuitable material. <br />(e) Maintenance, restoration and/or relocation, if required, of existing culverts, storm <br />drainage pipe, other utilities and structures affected by construction that are to <br />remain. <br />(f) Ethafoam pads or sand backfill between sewer and other pipes. <br />(g) Maintenance of existing sewer and provisions for interim service. <br />(h) Extra depth, including excavation, backfill and compaction required to clear <br />known buried utilities or other known obstacles. <br /> <br />Bid Item 28 - PVC SIDE SEWER LATERAL, 6-inch <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Per linear foot pipe measurement shall be based on the slope distance from point to point. <br />The point of beginning or ending of measurement in any particular run of pipe shall be the <br />vertical intersection of the centerline of the pipe measured with the centerline of the <br />intersection pipe, or with the beginning or ending of any new linear length of valves or <br />couplings contained within the measured length. At changes in pipe size connected by a <br />reducer, the point of measurement shall be taken as the midpoint of the reducer.