My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 37 <br />DIVISION 1 – GENERAL REQUIREMENTS <br />Supplement Division 1 by adding the following: <br />General Description and Location of Project <br />(******) <br />Work being performed includes furnishing all labor, materials and equipment necessary to <br />construct approximately 480 linear feet of water service and approximately 700 linear feet of <br />sanitary sewer main, 560 linear feet of sewer force main, 6-48” Sewer Manholes, Lump sum <br />Lift Station Below-Grade, Lump sum Lift Station Above-Grade, 415 ton of HMA, 950 feet of <br />electrical conduit, 3 each Electrical Junction Boxes and other such appurtenances and <br />performing all Work as required by the Contract, in accordance with the Contract Plans and <br />Contract Provisions. <br />The Project is in Everett, Washington, and is generally located at 747 75th Street; 801 75th <br />Street; 701 75th Street and 7404 Evergreen Way. <br />Design Engineer <br />(******) <br />Questions and inquiries about these Contract Documents should be directed in writing to the <br />attention of Daniel Enrico, P.E., City Project Manager, Denrico@everettwa.gov <br />Standard Specifications <br /> <br />All Work under this Contract shall be performed in accordance with the following <br />Specifications except as may be exempted or modified by other sections of these Contract <br />Documents. These Specifications are incorporated by reference, made a part of this Contract <br />and shall control and guide all activities within this Project whether referred to directly, <br />paragraph by paragraph. <br />WSDOT/APWA “2025 Standard Specifications for Road, Bridge and Municipal <br />Construction”, hereinafter referred to as the “Standard Specifications.” <br />The Standard Specifications, as modified or supplemented by these Special Provisions, all <br />of which are made a part of the Contract Documents, shall govern all of the Work. The <br />following latest edition of other specifications and standard plans shall apply to the extent to <br />which they are called out in the Contract Documents: <br />1. City of Everett “Design and Construction Standards and Specifications”, latest <br />edition as found on the Web at “http://everettwa.gov/DocumentCenter/View/243”. <br />2. “Standard Plans for Road and Bridge Construction”, as prepared by WSDOT. <br />3. “Manual on Uniform Traffic Control Devices (MUTCD).” <br />4. APWA Standards. <br />5. AWWA Standards. <br />6. National Electrical Code (NEC) 2023 edition. <br /> <br />Each Provision of these Special Provisions either supplements, modifies, or replaces the <br />comparable Standard Specification, or is a new Provision. The deletion, amendment, <br />alteration, or addition to any subsection or portion of the Standard Specifications is meant to <br />pertain only to that particular portion of the section, and in no way should it be interpreted <br />that the balance of the section does not apply. <br />Sections and subsections in the Special Provisions labeled under the headers with (******) <br />indicate City of Everett Provisions.
The URL can be used to link to this page
Your browser does not support the video tag.