My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 38 <br />1-01 DEFINITIONS AND TERMS <br />1-01.3 Definitions <br />Delete the three paragraphs under the heading Completion Dates, and substitute the <br />following: <br />Substantial Completion Date: The day the Engineer determines the City has full and <br />unrestricted use and benefit of the facilities, both from the operational and safety <br />standpoint, any remaining traffic disruptions will be rare and brief, and only minor <br />incidental work, replacement of temporary substitute facilities, plant establishment <br />periods, or correction or repair remains for the Physical Completion of the total Contract. <br />Physical Completion Date: The day all of the Work is physically completed on the <br />project. All documentation required by the Contract and required by law does not <br />necessarily need to be furnished by the Contractor by this date. <br />Completion Date: Date on which Project is ready for Final Acceptance. All physical <br />work, including Punch List, is complete and Contractor has completed and fulfilled all <br />contractual obligations except any maintenance of landscaping. Contractual obligations <br />that must be fulfilled prior to achievement of the Completion Date include, and are not <br />limited to; the Contractor’s furnishing all documentation, including correct, complete and <br />accurate as-built or record drawings and operation and maintenance manuals and <br />transfer of warranties. <br />(This definition replaces the definition in WSDOT 1-01.3 for Completion Dates.) <br />Revise the following definitions to read as follows: <br />Award: The decision by Everett City Council to award a contract and authorize the <br />Mayor to sign the Contract. No contract is formed until the Mayor signs the contract. <br />(This definition replaces the definition in WSDOT 1-01.3 for Bid Documents.) <br />Bid Documents: The component parts of the proposed Contract which may include, <br />but are not limited to, the Proposal Form, the proposed Contract Provisions, the <br />proposed Contract Plans, and Addenda. (This definition replaces the definition in <br />WSDOT 1-01.3 for Bid Documents.) <br />Contract: Written agreement signed between the City and Contractor and includes <br />Division C – CONTRACT, Division P - PROPOSAL, Division B – BID ITEM <br />DESCRIPTIONS, Special Provisions, Contract Plans, Standard Specifications and <br />amendments, Standard Plans in effect as of the date Bids are opened, Addenda, <br />supplemental agreements, change orders, certifications and affidavits required by this <br />Contract and by law, and Federal requirements that apply to this Contract and Project. <br />(This definition replaces the definition in WSDOT 1-01.3 for Contract.) <br />Contract Bond(s): The separate performance bond and payment bond, as set forth in <br />and required by the Contract Documents. (This definition supplements the definition in <br />WSDOT 1-01.3 for Contract Bond.) <br />Engineer: The City’s representative who administers the construction program for the <br />City. Provisions in the Contract Documents that state the Engineer “shall” or “will” shall <br />be deemed to mean that the Engineer shall or will take such action if requested in writing <br />by the Contractor. (This definition replaces the definition in WSDOT 1-01.3 for <br />Engineer.) <br />Specifications: Includes 2021 WSDOT/APWA Standard Specifications and latest <br />Amendments, and all other specifications (including these Special Provisions) for the <br />prescribed Work in this Contract. (This definition replaces the definition in WSDOT 1- <br />01.3 for Specifications.)
The URL can be used to link to this page
Your browser does not support the video tag.