My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 45 <br />be furnished at the unit bid prices. Bidder shall complete spaces on the proposal form <br />that call for, and are not limited to, unit prices; extensions; summations; the total bid <br />amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment <br />of addenda; bidder’s name, address, bidder’s email address, telephone number, and <br />signature; bidder’s UDBE/DBE/M/WBE commitment, if applicable; a State of <br />Washington Contractor’s Registration Number; and a Business License Number, if <br />applicable. Bids shall be completed by typing or shall be printed in ink by hand, <br />preferably in black ink. The required certifications are included as part of the Proposal <br />Form. <br />Bidder shall submit Bidder’s Proposal on the Proposal Form provided in the Contract <br />Documents. <br />The City reserves the right to arrange the proposal forms with alternates and additives, <br />if such be to the advantage of the City. Bidder shall bid on all alternates and additives <br />set forth in the Proposal Form unless otherwise specified. <br />1-02.6 Preparation of Proposal <br />Delete “unless it approves in writing” from the second sentence of the first paragraph of 1- <br />02.6. <br />Revise the fourth paragraph of 1-02.6, beginning with “The Bidder shall submit with the Bid <br />a completed Disadvantaged Business Enterprise (DBE) Utilization Certification”, to read as <br />follows: <br />Contractor agrees that the Contractor shall actively solicit the employment of minority <br />group members. Contractor further agrees that the Contractor shall actively solicit Bids <br />for the subcontracting of goods or services from qualified minority businesses. <br />Contractor shall furnish evidence of the Contractor's compliance with these <br />requirements of minority employment and solicitation. Contractor further agrees to <br />consider the grant of subcontracts to said minority bidders on the basis of substantially <br />equal proposals in the light most favorable to said minority businesses. The Contractor <br />shall be required to submit evidence of compliance with this section as part of the Bid <br />by submitting the RCW 35.22.650 Certification. <br />Delete the sixth paragraph of 1-02.6, which begins with “The Bidder shall submit with <br />their Bid a completed Contractor Certification Wage Law Compliance form (WSDOT <br />Form 272-009).” <br /> <br />Supplement 1-02.6 by adding the following: <br />In the event that the product of a unit price and an estimated quantity does not equal the <br />extended amount quoted, the unit price shall govern, and the correct product of the unit <br />price and the estimated quantity shall be deemed to be the amount bid. If the sum of <br />two or more items in a bidding schedule does not equal the total amounts quoted, the <br />individual item amounts shall govern and the correct total shall be deemed to be the <br />amount bid. Do not qualify Proposal, since this will automatically be cause for rejection <br />of the Proposal. <br />Bidders are warned against making erasures or alterations of any kind to the Proposal <br />Form, and proposals that contain omissions, erasures, or irregularities of any kind may <br />be rejected. No oral, electronic, fax, telegraphic, or telephonic proposals or <br />modifications will be considered. <br />1-02.7 Bid Deposit <br />Supplement 1-02.7 by adding the following:
The URL can be used to link to this page
Your browser does not support the video tag.