My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 46 <br />Bid deposit shall serve as evidence of good faith and as a guarantee that if awarded the <br />Contract the Bidder will execute the Contract and provide bonds as required by the Bid. <br />Should the successful Bidder fail to enter into the Contract, furnish a satisfactory <br />performance and payment bond, and furnish evidence of insurance within 14 calendar <br />days after the Award Date, the certified check, cashier’s check or bid bond shall, unless <br />otherwise provided in the Contract Documents, be forfeited as liquidated damages. <br />Bid bonds shall contain the following: <br />1. City-assigned number for the Project; <br />2. Name of the Project; <br />3. The City of Everett named as obligee; <br />4. The amount of the bid bond stated either as a dollar figure or as a percentage <br />that represents five percent of the maximum bid amount that could be <br />awarded; <br />5. Signature of the Bidder’s officer empowered to sign official statements. The <br />signature of the person authorized to submit the Bid should agree with the <br />signature on the bond, and the title of the person must accompany the said <br />signature; <br />6. The signature of the surety’s officer empowered to sign the bond and the <br />power of attorney. <br />Bidder shall use the bond form included in the Bid Documents. <br />1-02.8 Noncollusion Declaration and Lobbying Certification <br />1-02.8(1) Noncollusion Declaration <br />Delete the last paragraph of 1-02.8(1) and supplement by adding the following: <br />The City has determined every Bidder must submit a Non-Collusion Affidavit for <br />every Project. Accordingly, the Bidder shall submit a signed and notarized “Non- <br />Collusion Affidavit”, contained in the Contract Documents, as part of the Proposal <br />package. If the City has reason to believe that collusion exists among Bidders, the <br />City will reject the Bids of the known participants in such collusion and may, at its <br />option, require that all Bidders certify under penalty of perjury, that no collusion has <br />occurred or exists. <br />1-02.9 Delivery of Proposal <br />Delete all of 1-02.9 and substitute the following: <br />Bidder shall submit Bidder’s Proposal in a sealed opaque envelope that clearly and <br />legibly notes the Project Name, the time and date of the bid opening, and the Bidder’s <br />name and address on the outside of the envelope. <br />The City will not open or consider any Proposal or any supplement to a Proposal that is <br />received after the time specified for receipt of Proposals, or received in a location other <br />than that specified for receipt of Proposals. <br />1-02.10 Withdrawing, Revising, or Supplementing Proposal <br />Delete 1-02.10 and substitute with the following: <br />After submitting a physical Proposal to the City, the Bidder may withdraw, revise, or <br />supplement its Proposal if: <br />1. The Bidder submits a written request signed by an authorized person and <br />physically delivers it to the place designated for receipt of Proposals, and <br />2. The City receives the request before the time set for receipt of Bid Proposals, and
The URL can be used to link to this page
Your browser does not support the video tag.