My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 48 <br />j. The Bidder fails to submit or properly complete, on the form provided by the <br />City, the Non-Collusion Affidavit, as required in 1-02.8(1). <br />2. A Proposal may be considered irregular and may be rejected if: <br />a. The Proposal does not include a unit price for every Bid item; <br />b. Any of the unit prices are excessively unbalanced (either above or below the <br />amount of a reasonable Bid) to the potential detriment of the City, as <br />determined by the City; <br />c. Receipt of Addenda is not acknowledged; <br />d. A member of a joint venture or partnership and the joint venture or partnership <br />submit Proposals for the same project (in such an instance, both Proposals <br />may be rejected); or <br />e. Proposal form entries are not made in ink. <br />1-02.14 Disqualification of Bidders <br />Revise 1-02.14 to read as follows: <br />A Bidder will be deemed not responsible if the Bidder does not meet the mandatory <br />bidder responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1-02.1(1). <br />The City will verify that the Bidder meets the mandatory bidder responsibility criteria in <br />RCW 39.04.350(1). To assess bidder responsibility, the City reserves the right to request <br />documentation as needed from the Bidder and third parties concerning the Bidder’s <br />compliance with the mandatory bidder responsibility criteria. <br />If the City determines the Bidder does not meet the mandatory bidder responsibility <br />criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the City shall <br />notify the Bidder in writing, with the reasons for its determination. If the Bidder disagrees <br />with this determination, it may appeal the determination within two business days of the <br />City’s determination by presenting its appeal and any additional information to the City. <br />The City will consider the appeal and any additional information before issuing its final <br />determination. If the final determination affirms that the Bidder is not responsible, the <br />City will not execute a contract with any other Bidder until at least two business days <br />after the Bidder determined to be not responsible has received the City’s final <br />determination. <br />If the Contract Documents contain supplemental responsibility criteria, then a Bidder will <br />be deemed not responsible if the Bidder does not meet those criteria: <br /> <br />1-02.15 Pre-Award Information <br />Revise 1-02.15 to read as follows: <br />Before awarding any contract, the City may require one or more of these items or actions <br />of the apparent lowest responsible Bidder: <br />1. A complete statement of the origin, composition, and manufacture of any or <br />all materials to be used, <br />2. Samples of these materials for quality and fitness tests, <br />3. A progress schedule, in a form the City requires, showing the order of and <br />time required for the various phases of the Work, <br />4. A breakdown of costs assigned to any bid item, <br />5. Attendance at a conference with the Engineer or representatives of the <br />Engineer,