My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 49 <br />6. Obtain, and furnish a copy of, a business license to do business in the City of <br />Everett. <br />7. A copy of State of Washington Contractor’s Registration, or <br />8. Any other information or action taken that is deemed necessary to ensure that <br />the Bidder is the lowest responsible bidder. <br />1-03 AWARD AND EXECUTION OF CONTRACT <br />1-03.1 Consideration of Bids <br />Revise the first paragraph to read: <br />After opening and reading Proposals, the City will check them for correctness of <br />extensions of the prices per unit and the total price. If a discrepancy exists between the <br />price per unit and the extended amount of any bid item, the price per unit will control. If <br />a minimum bid amount has been established for any item and the Bidder’s unit or lump <br />sum price is less than the minimum specified amount, the City will unilaterally revise the <br />unit or lump sum price to the minimum specified amount and recalculate the extension. <br />The total of extensions, corrected where necessary, including sales taxes where <br />applicable and such additives and/or alternates as selected by the City, will be used by <br />the City for Award purposes and to fix the awarded Contract Sum and the amount of the <br />Contract Bond(s). <br />Revise the third and fourth paragraphs of 1-03.1 to read as follows: <br />Within 5 days after the opening of Proposals (or such longer time as the City may grant <br />in writing), a Bidder who wishes to claim error shall submit a notarized affidavit signed <br />by the Bidder, accompanied by original work sheets used in the preparation of the <br />Proposal, requesting relief from the responsibilities of Award. <br />The affidavit shall describe the specific error(s) and certify that the work sheets are the <br />originals used in the preparation of the Proposal. The Engineer will review the certified <br />work sheets to determine the validity of the claimed error and make recommendation to <br />the City. If the City concurs in the claim of error, the Bidder will be relieved of <br />responsibility, and the bid deposit of the Bidder will be returned. Thereafter, at the <br />discretion of the City, all Bids may be rejected or Award made to next lowest and <br />responsive Bidder. <br />Supplement 1-03.1 by adding the following: <br />1-03.1(2) Preference for Resident Contractors <br />(******) <br />In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br />from a state that provides a percentage bidding preference and does not have an office <br />located in Washington, then a comparable percentage disadvantage will be applied to <br />the Bid of that nonresident contractor. <br />1-03.2 Award of Contract <br />Revise 1-03.2 to read as follows: <br />Within 45 days after the opening of Bids, the City will act either to accept the Bid from <br />the lowest responsive, responsible Bidder, or to reject all Bids. The City reserves the <br />right to request extensions of such Bid acceptance period. If the lowest responsible <br />Bidder and the City cannot agree on an extension by the 45 day deadline, the City <br />reserves the right to award the Contract to the next lowest responsible Bidder or reject <br />all Bids. <br />The acceptance of a Bid will be evidenced by a written Notice of Award of Contract <br />delivered in person or by certified mail to the Bidder whose Bid is accepted, together
The URL can be used to link to this page
Your browser does not support the video tag.