CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 60 <br />Assistants and inspectors may advise the Contractor of any faulty work or materials or <br />infringements of the terms of the Contract; however, failure of the City’s Representative or <br />the assistants or inspectors to advise the Contractor does not constitute acceptance or <br />approval. <br />1-05.3 Working Drawings <br />Revise the second paragraph to read as follows: <br />1. Type 1 – Submitted for City information. Submittal must be received by the City a <br />minimum of 7 working days before Work represented by the submittal begins. <br />2. Type 2 – Submitted for City review and comment. Unless otherwise stated in the <br />Contract, the Engineer will require up to 15 working days from the date the Working <br />Drawing is received until it is returned to the Contractor. The Contractor shall not proceed <br />with the Work represented by the Working Drawing until comments from the Engineer <br />have been addressed. <br />3. Type 2E – Same as a Type 2 Working Drawing with Engineering as described below. <br />4. Type 3 – Submitted for City review and approval. Unless otherwise stated in the <br />Contract, the Engineer will require up to 20 working days from the date the Working <br />Drawing is received until it is returned to the Contractor. The Contractor shall obtain the <br />Engineer’s written approval before proceeding with the Work represented by the <br />Working Drawing. <br />5. Type 3E – Same as a Type 3 Working Drawing with Engineering as described below. <br />Supplement 1-05.3 as follows: <br />The Contract Documents include Plans that show such details as are reasonably <br />necessary to give a comprehensive understanding of the Work. The Contractor shall <br />submit alterations affecting the requirements and information in the Plans in writing to <br />the Engineer for approval prior to performing such Work. <br />The Engineer may supplement the Plans with additional drawings and explanations, <br />consistent with the purpose and intent of the original Plans, to detail and illustrate the <br />Work. The Contractor shall perform the Work according to these supplemental drawings <br />and explanations. <br />In addition to supplemental drawings furnished by the Engineer, the Contract Documents <br />may also be supplemented by Type 1, Type 2 or 2E, and Type 3 or 3E Working Drawings <br />prepared by the Contractor, material supplier, or manufacturer, when necessary or as <br />required by the Contract Documents to detail and illustrate portions of the Work. All <br />types of Working Drawings shall be reviewed by the Engineer before work pursuant to <br />those Working Drawings is performed. Type 3 and 3E Working Drawings may include, <br />and not be limited to, shop details, erection plans, masonry lay-out diagrams, reinforcing <br />steel and bending diagrams, post tensioning plans, shoring, cribbing, cofferdam, or <br />falsework plans, formwork plans, or hydraulic items. Type 2 and 2E Working Drawings <br />may include, and not be limited to, Catalog cuts or standard plans for commonly used <br />manufactured items. <br />The Contractor shall be fully responsible for the accuracy of dimensions and details on <br />Working Drawings, and for complete conformity with the Contract Documents, even if <br />the Working Drawings have been approved by the Engineer, or if the Contractor and the <br />Engineer agree on dimensions and details. The City does not accept Working Drawings <br />as accurate or adequate, and does not take responsibility for, or warrant that Working <br />Drawings will meet Contract requirements. <br />Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br />for variation from the requirements of the Contract Documents unless Contractor has in <br />writing called the Engineer's attention to each such variation at the time of submission,