My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 61 <br />and the Engineer has given written approval of each such variation by a specific written <br />notation thereof incorporated in or accompanying the returned Working Drawing; nor will <br />review by Engineer relieve Contractor from responsibility for errors or omissions in the <br />Working Drawings or from responsibility for having complied with the provisions of this <br />section. <br />The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br />The following listed sections of the Standard Specifications and Special Provisions <br />require Working Drawings that may or may not be applicable to this specific project. This <br />list is supplied as an aid to the Contractor and is by no means complete. Submittal <br />requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. <br />DIVISION 2 EARTHWORK <br />2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br />DIVISION 6 STRUCTURES <br />6-01 General Requirements <br />6-01.9 Working Drawings <br />6-02 Concrete Structures <br />6-02.3(13) Expansion Joints-Shop Drawings <br />6-02.3(16) Plans for Falsework and Forms-Shop Drawings <br />6-02.3(26)A Shop Drawings <br />6-03 Steel Structures <br />6-03.3(7) Shop Plans <br />6-03.3(25) Welding and Repair Welding-Shop Drawings <br /> <br />DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br />SEWERS, WATER MAINS, AND CONDUITS <br />7-02 Culverts <br />7-02.2 Materials-Catalog Cuts or Standard Plans <br /> <br />7-04 Storm Sewers <br />7-04.2 Materials-Catalog Cuts or Standard Plans <br />7-05 Manholes, Inlets, Catch Basins, and Drywells <br />7-05.2 Materials-Catalog Cuts or Standard Plans <br /> <br />7-15 Service Connections <br />7-15.2 Materials-Catalog Cuts or Standard Plans <br />7-17 Sanitary Sewers <br />7-17.2 Materials-Catalog Cuts or Standard Plans <br />DIVISION 8 MISCELLANEOUS CONSTRUCTION <br /> <br />8-12 Chain Link Fence and Wire Fence <br />8-12.2 Materials-Catalog Cuts or Standard Plans <br />8-13 Monument Cases <br />8-13.2 Materials-Standard Plans <br />
The URL can be used to link to this page
Your browser does not support the video tag.