My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 61 <br />and the Engineer has given written approval of each such variation by a specific written <br />notation thereof incorporated in or accompanying the returned Working Drawing; nor will <br />review by Engineer relieve Contractor from responsibility for errors or omissions in the <br />Working Drawings or from responsibility for having complied with the provisions of this <br />section. <br />The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br />The following listed sections of the Standard Specifications and Special Provisions <br />require Working Drawings that may or may not be applicable to this specific project. This <br />list is supplied as an aid to the Contractor and is by no means complete. Submittal <br />requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. <br />DIVISION 2 EARTHWORK <br />2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br />DIVISION 6 STRUCTURES <br />6-01 General Requirements <br />6-01.9 Working Drawings <br />6-02 Concrete Structures <br />6-02.3(13) Expansion Joints-Shop Drawings <br />6-02.3(16) Plans for Falsework and Forms-Shop Drawings <br />6-02.3(26)A Shop Drawings <br />6-03 Steel Structures <br />6-03.3(7) Shop Plans <br />6-03.3(25) Welding and Repair Welding-Shop Drawings <br /> <br />DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br />SEWERS, WATER MAINS, AND CONDUITS <br />7-02 Culverts <br />7-02.2 Materials-Catalog Cuts or Standard Plans <br /> <br />7-04 Storm Sewers <br />7-04.2 Materials-Catalog Cuts or Standard Plans <br />7-05 Manholes, Inlets, Catch Basins, and Drywells <br />7-05.2 Materials-Catalog Cuts or Standard Plans <br /> <br />7-15 Service Connections <br />7-15.2 Materials-Catalog Cuts or Standard Plans <br />7-17 Sanitary Sewers <br />7-17.2 Materials-Catalog Cuts or Standard Plans <br />DIVISION 8 MISCELLANEOUS CONSTRUCTION <br /> <br />8-12 Chain Link Fence and Wire Fence <br />8-12.2 Materials-Catalog Cuts or Standard Plans <br />8-13 Monument Cases <br />8-13.2 Materials-Standard Plans <br />
The URL can be used to link to this page
Your browser does not support the video tag.