My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 68 <br />establish the completion date and certify the Work as complete. The following shall <br />occur before the completion date can be established: <br />The Final Contract Voucher Certification shall be signed by the Contractor verifying <br />agreement to the final contract price. <br />The physical work on the Project shall be complete. <br />The Contractor shall furnish all documentation required by the Contract and <br />required by law, necessary to allow the City to certify the Contract as complete. <br />A certificate of completion for the Work, signed by the City, will constitute acceptance of <br />the Work. The issuance of this certificate of completion will not constitute acceptance of <br />unauthorized or defective Work, Equipment, or materials. <br />The Contractor agrees that neither completion nor final acceptance shall relieve the <br />Contractor of the responsibility to indemnify, defend, and protect the City against any <br />claim or loss resulting from the failure of the Contractor, or the Subcontractors or lower <br />tier subcontractors, to pay all laborers, mechanics, Subcontractors, material persons, or <br />any other person who provides labor, supplies, or provisions for carrying out the Work <br />or for any payments required for unemployment compensation under Title 50 RCW or <br />for industrial insurance and medical aid required under Title 51 RCW. <br />Failure of the Contractor to perform all of the Contractor's obligations under the Contract <br />shall not bar the City from unilaterally certifying the Contract complete so the Engineer <br />may calculate a final contract price as provided in 1-09.9 PAYMENTS . <br />1-05.13 Superintendents, Labor and Equipment of Contractor <br />Delete 1-05.13. <br />1-05.14 Cooperation With Other Contractors <br />Delete all of 1-05.14 and substitute the following: <br />Nothing in the Contract shall be interpreted as granting to the Contractor exclusive <br />occupancy of the Project area. The Contractor shall ascertain to its own satisfaction the <br />scope of the Project and the nature of any other contracts that have been or may be <br />awarded by the City in the construction of the Project, or to the end that the Contractor <br />may perform this Contract in the light of such other contracts, if any. <br />The Contractor shall not cause unnecessary hindrance or Delay to others working on <br />this or other projects. If the performance of a contract for the Project is likely to be <br />interfered with by the simultaneous performance of some other contract or contracts, the <br />Engineer will decide which Contractor shall cease Work temporarily and which <br />Contractor shall continue, or whether the Work under the contracts can be coordinated <br />so that the contractors may proceed simultaneously. On all questions concerning <br />conflicting interest of contractors performing related Work, the decision of the Engineer <br />shall be binding upon all contractors concerned and the City, the Engineer, the City's <br />Representative, and their consultants shall not be responsible for any damages suffered <br />or extra costs incurred by the Contractor resulting directly or indirectly from the Award or <br />performance or attempted performance of any other contract or contracts on the Project <br />or caused by a decision or omission of the Engineer respecting the order of precedence <br />in the performance of the contracts. <br />If, through acts of neglect on the part of the Contractor, any others suffer loss or damage <br />on the Work, the Contractor agrees to resolve such loss or damage fairly and <br />expeditiously. If such other shall assert any claim against the City, the Engineer, the <br />City's Representative, or their consultants on account of any damage alleged to have <br />been so sustained, the City shall notify the Contractor, who shall hold harmless, <br />indemnify, and defend the City, Engineer, the City's Representative, and their
The URL can be used to link to this page
Your browser does not support the video tag.