My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 69 <br />consultants, and each of their directors, officers, employees, and agents against any <br />such claim, including all attorney's fees and any other costs incurred by the indemnified <br />parties relative to any such claim. <br />The Contractor shall coordinate its work with other contractors and utility companies that <br />may have facilities in the Project area and cooperate with them. The Contractor shall <br />also coordinate its activities with the City; and no water mains, individual water services, <br />street, or private driveways may be closed off without a minimum of five working days <br />notice to the City and the private property owner. Should the property owner or the City <br />have adequate reason, as determined by the Engineer, to avoid access or water service <br />shutoff at the scheduled time, the Contractor shall reschedule its work to meet the new <br />condition. <br />Final grading to subgrade and subgrade preparation in those areas disturbed by the <br />utilities companies shall be the responsibility of the Contractor and included in the street <br />construction and no additional compensation will be paid. <br />The Contractor shall cooperate with the utility companies and their subcontractors and <br />so conduct its operations that the necessary construction of their facilities can be <br />accomplished to the mutual satisfaction of the City of Everett and the utility companies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.