Laserfiche WebLink
2018 WSEC Requirements for Commercial Buildings including Group R2, R3 & R4 over 3 stories & all R1 -- Administered by 02024 NEEA, All rights reserved <br />The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br />Washington State Energy Code, Commercial Provisions. <br />For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br />Indicate occupancy sensing or tuner Switch <br />controls configured to automaticalh,hut of <br />healing systetn when area served is <br />unoccupied <br />C40 I ISno\\ melt ,v,tcm, Indicate automatic controls configured to shut <br />off system when pavement temperature <br />exceeds 50°F and no precipitation is falling. <br />and when outdoor air temperature exceeds <br />40°F <br />('41)_ 11. Frcerc protection <br />,stem control, <br />HVAC EQUIPMENT ENERGY USE METERING <br />Indicate automatic controls to shut off system <br />when outdoor temperature exceeds 40°F. or <br />conditions protect fluid front freezing <br />C409.3.1 IfVAC equipment For new building,,> 50,000 sf and building <br />errcrg\ u,c ulctcrim , additions > 25,0fN) sf. verfiy ever-y use <br />metering of all equipment used to provide <br />,pace heating and cooling, dehumidification <br />and ventilation will be provided per C409: <br />indicate equipment eligible for exception <br />DOCUMENTATION AND SYSTEM SPECIFIC REQUIREMENT TO SUPPORT COMMISSIONING (CX) <br />('408.1 Scope of mechanical <br />For buildings With >_ 240.000 Btu/h total <br />systems <br />output cooling capacity or >_ 300,000 Btu/h <br />commissioning <br />total output heating capacity, indicate that all <br />mechanical systems regardless of individual <br />capacity are required to be commissioned: or <br />prov ide building heating / cooling capacity <br />calculation demonstrating chizibilty_ for <br />exception <br />Indicate that all systems. equipment and <br />controls for Which the WSEC requires control <br />functions and / or configuration to perform <br />specific functions are included in the Cx <br />scope <br />C 408.1.1 Commissioning <br />Indicate in plans and specifications that Cx <br />C408.1.4.1 requirements in <br />per C408 is required for all applicable <br />construction <br />mechanical systems <br />documents <br />Include acnetal summary that includes at <br />minimum: narrative description of actiyites. <br />responsibilities of the Cx learn, schedule of <br />activities including verification of project <br />close out documentation per C103.6, and <br />conflict of interest plan of required) <br />Include in general summary that a Cx project <br />report or Compliance Checklist (Figure <br />C408.1.4.1) shall be completed by the <br />Certified Cx Professional and provided to the <br />owner prior to the final mechanical <br />inspection. <br />Page 24125 <br />