Laserfiche WebLink
2018 WSEC Requirements for Commercial Buildings including Group R2, R3 & R4 over 3 stories & all R1 -- Administered by 02024 NEEA, All rights reserved <br />The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br />Washington State Energy Code, Commercial Provisions. <br />For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br />('403.1.2.' Functional <br />pedonttance testing <br />criteria <br />Identify in Plans and specifications the <br />intended operation of all equipment and <br />controls durin<_* all modes of operation. <br />including interfacing between new and <br />existing -to -remain ssstents <br />C'_MS_'.' Aii s stem and Indicate in plans that air and fluid flow rates <br />hvdronic system shall be tested and balanced within the <br />balancing tolerances defined in the specifications: <br />indicate svatems shall be balanced in a manner <br />to first minimize throttling losses. then <br />adjusted to meet design floe- conditions <br />C-408.2.2.1 Air halancing Indicate devices that provide the capahilih to <br />devices balance all supply air outlets. zone terminal, <br />and air handline equipment requiring scstent <br />balancing <br />C408.'_ '? HNdronic system Indicate devices that provide the capability to <br />balancing devices isolate. balance and measure flou across all <br />hydronic equipment requiring system <br />balancing including heating and cooling coils <br />and pumps: or exception applied <br />PROJECT CLOSE OUT DOCUMENTATION <br />C103.6 Documentation and <br />Indicate in plans that project close out <br />project close out <br />documentation and training of building <br />submittal <br />operations personnel is required for all <br />requirements <br />mechanical components, equipment and <br />systems governed by this code; indicate close <br />out documentation shall include: record <br />documents, O&M manuals, applicable WSEC <br />mechanical equipment compliance reports and <br />calculations <br />Page 25125 <br />