My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 N BROADWAY STARBUCKS 2025-07-30
>
Address Records
>
N BROADWAY
>
1010
>
STARBUCKS
>
1010 N BROADWAY STARBUCKS 2025-07-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 4:16:23 PM
Creation date
4/23/2025 1:25:31 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1010
Tenant Name
STARBUCKS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2018 WSEC Requirements for Commercial Buildings including Group R2 R3 & R4 over 3 stories & all R1 -- Administered by @2023 NEEA, All rights reserved <br />The following information is necessary to check a permit application for compliance with the lighting systems, motors and electrical system requirements in the <br />Washington State Energy Code, Commercial Provisions. <br />For questions about this reportcontact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br />C408.1.2 <br />Commissioning <br />Include general summary of Cx plan per <br />C408.1.2.1 <br />requirements in <br />C408.1.2 including: 1) Narrative description <br />C408.1.4 <br />construction <br />of activities; 2) Responsibilities of [lie Cx <br />C103.6.3 <br />documents <br />team; 3) Schedule of activities including <br />verification of project close out <br />documentation per C103.6; 4) Conflict of <br />interest plan (if required) <br />C408.1.2 <br />Conunissioning <br />Include in general surrunary that a Cx project <br />! <br />C408.1.4 <br />requirements in <br />report and Compliance Checklist (Figure <br />C103.6.3 <br />construction <br />C408.1.4.1) shall be completed by the <br />documents <br />Certified Cx Professional and provided to the <br />owner prior to the final electrical inspection <br />YES <br />C408.4.1 <br />Functional <br />Identify in plans and specifications the <br />E Sheets <br />performance testing <br />intended operation of all equipment and <br />criteria <br />controls during all modes of operation, <br />including interfacing between new and <br />existing -to -remain systems <br />PROJECT CLOSE OUT DOCUMENTATION <br />YES <br />C103.6.3 <br />Project close out <br />Indicate in plans that project close out <br />E Sheets <br />documentation <br />documentation is required including WSEC <br />requirements <br />lighting compliance reports that document all <br />interior and exterior lighting area and / or <br />surface types, lighting power allowances and <br />installed densities <br />If "no" is selected for any question, provide explanation. <br />I <br />! <br />Page 10/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.