Laserfiche WebLink
The (E) 2x6 ceiling joists need to be sistered between the exterior walls and the interior bearing wall at <br />the center. The (E) main floor beam above the basement will need to be sistered using LSL rim board. <br />can provide some stamped sketches showing the rafters over the knee wall and ceiling joists sistered <br />and then the strengthened beam. The sketches would be on site with the approved plans for the <br />building inspector to review. <br />Thanks in advance for your consideration. <br />Jesse Binford, PE, Principal <br />BCINVESTIGATIVE <br />ENGINEERS, LLC <br />RESPONSIVE • ACCURATE • T II O R O U G H <br />3605 C Street NE, Auburn, WA. 98002 <br />253-670-9513 (c) 253-833-5557 (o) <br />