Laserfiche WebLink
Mr. Yin Lu <br />October 13, 2023 <br />Page 2 <br />b. The truss construction and calculations should bear the seal and signature of the engineer <br />performing the design. <br />i. Note included in supplemental sheet SO], deferred submittals sectionv <br />c. The truss design should be reviewed for conformance with the approved construction <br />drawings and referenced building codes, and approved for construction by the designer - <br />of -record for the approved drawings, prior to fabrication and erection. <br />i. Note included in supplemental sheet SO], deferred submittals section <br />S. It appears that the exterior walls will require bracing where the wall framing is not continuous <br />from the foundation to the roof sheathing. Details for the bracing should be submitted for review. <br />a. Bracing detail added. <br />Please feel free to contact me if you would like to discuss any of these items in more detail or if you <br />have any questions. You can reach me by phone at (206) 914-9536, or by email at <br />LakeviewSE@outlook.com. <br />Sincerely, <br />f_ <br />Jon Conner, PE, SE <br />Lakeview Structural Engineering <br />I OlI /23 5:20 PM <br />