2015 Washington State Enerr ode Compliance Forms for Commercial,R2 and R3 over ones and all R1 -Page 7 of 7
<br /> Mechanical Permit Plans Cl1dcklist MECH-CHK
<br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017
<br /> Project Title: Concentra Everett Date 1/1/2015
<br /> The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the
<br /> Washington State Energy Code,Commercial Provisions
<br /> Applicable Code Section Code Provision Information Required-Must be in permit documents Location in Building Department
<br /> (yes,no,na) Documents Notes
<br /> C403 7, Application of single duct Indicate VAV terminal types on plans,verify fan-powered terminal units only serve perimeter
<br /> Item 11 and fan-powered terminal zones with envelope loads,verify all other zones are served by single duct terminal units
<br /> units N/A
<br /> C403 7, Fan-powered terminal unit Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint
<br /> tem 12 primary air reset of all fan-powered terminal units to the minimum required to maintain ventilation during
<br /> Ioccupied heating or deadband,based upon the VAV air handling unit OSA ventilation fraction N/A
<br /> For spaces>150 sf with occupant density>_25 people/1000 sf,indicate space is served by a
<br /> C403 7, High occupancy space dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint,also
<br /> Item 13 controls indicate occupancy sensor control that automatically reduces minimum ventilation to zero and
<br /> sets back room heating and cooling setpoints by>_5"F N/A
<br /> For server,electronic equipment,telecom or similar spaces with cooling loads>5 W/sf,
<br /> C403 7, Dedicated HVAC systems indicate spaces are served by independent HVAC systems that are separate from HPVAV
<br /> Item 14 systems serving rest of building,indicate dedicated HVAC systems have air economizer
<br /> controls or energy recovery per C403 3 Exception 9 N/A
<br /> Indicate whether systems are served by a high efficiency heating water plant,or a high
<br /> efficiency chilled water plant N/A
<br /> If complying via high efficiency heating water plant Indicate all VAV terminals have hydronic
<br /> heating coils served by heating water system with either gas-fired boiler(s)with thermal
<br /> C403 7, Central plant efficiency efficiency z 90%,air-to-water heat pumps,or heat recovery chillers N/A
<br /> Item 15 If complying via high efficiency chilled water plant Indicate all VAV air handlers have cooling
<br /> coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least
<br /> 25%per Table C403 2 3(7)(note water-cooled IPLV is max,all others are min),indicate
<br /> smallest chiller or compressor in plant is<_20%of total plant capacity,or provide thermal
<br /> storage sized for s 20%of total plant capacity N/A
<br /> C403 7, Fault detection and Indicate DDC system includes a fault detection and diagnostics(FDD)system configured to
<br /> Item 16 diagnostics monitor operation and provide fault reporting of required parameters for all VAV air handlers N/A
<br /> and VAV air terminal units in the HPVAV system
<br /> HVAC Equipment Energy Use Metering
<br /> HVAC equipment energy For new buildings>50,000 sf and building additions>25,000 sf,verify energy use metering of
<br /> C409 3 1 use metering all equipment used to provide space heating and cooling,dehumidification and ventilation will N/A
<br /> be provided per C409,indicate equipment eligible for exception
<br /> Documentation and System Specific Requirement To Support Commissioning
<br /> Indicate that all mechanical systems,equipment,and controls for which the WSEC requires
<br /> control functions and /or configuration to perform specific functions are required to be
<br /> commissioned, N/A
<br /> Scope of mechanical
<br /> C408 2 For buildings with z 240,000 Btu/h total output cooling capacity or z 300,000 Btu/h total output
<br /> systems commissioning
<br /> heating capacity,indicate that all mechanical systems regardless of individual capacity are
<br /> required to be commissioned,or provide building heating/cooling capacity calculation
<br /> demonstrating eligibility for exception N/A
<br /> Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical
<br /> systems, N/A
<br /> C403 2 10 Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408 1 2
<br /> C408 1 1 Commissioning including narrative description of activities,responsibilities of the Cx team,schedule of
<br /> C408 1.2 requirements in construction activities including verification of project close out documentation per C103 6,and conflict of
<br /> C408 1 4 2 documents interest plan Of required), N/A
<br /> C103 6 Include in general summary that a Cx project report or Compliance Checklist(Figure
<br /> C408 1 4 2)shall be completed by the Certified Cx Professional and provided to the owner
<br /> prior to the final mechanical inspection N/A
<br /> Air system and hydromc Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances
<br /> C408 2 2 system balancing defined in the specifications,indicate systems shall be balanced in a manner to first minimize
<br /> throttling losses,then adjusted to meet design flow conditions N/A
<br /> C408 2 2 1 Air system balancing Indicate devices that provide the capability to balance all supply air outlets,zone terminals and
<br /> devices air handling equipment requiring system balancing M111
<br /> C408 2 2 2 Hydronic system balancing Indicate devices that provide the capability to isolate,balance and measure flow across all
<br /> devices hydronic equipment requiring system balancing including heating and cooling coils and pumps N/A
<br /> C408 2 3 Functional performance Identify in plans and specifications the intended operation of all equipment and controls during
<br /> testing criteria all modes of operation,including interfacing between new and existing-to-remain systems N/A
<br /> Project Close Out Documentation
<br /> Documentation and project Indicate in plans that project close out documentation and training of building operations
<br /> C103 6 close out submittal personnel is required for all mechanical components,equipment and systems governed by
<br /> this code,indicate close out documentation shall include record documents,O&M manuals, Specificatio
<br /> requirements applicable WSEC compliance forms and calculations
<br /> ns
<br />
|