Laserfiche WebLink
r � <br /> 2015 Washington St Energy Code Compliance Forms for Commercial, rid R3 over 3 stories and all R1 <br /> Mechanical Summary MECH-SUM <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 <br /> Project Information Project Title. Concentra Everett Date 1/1/2015 <br /> Applicant Information Provide contact information for individual who can respond to For Building Dept Use <br /> inquines about compliance form information provided. <br /> Company Name Little Diversified Architectural Consulting <br /> Company Address 615 S College St Suite 1600,Charlotte,NC 28202 <br /> Applicant Name Jim Milligan <br /> Applicant Phone. 704-561-3457 <br /> Project Description ❑New Building ❑Building Addition E Tenant Improvement ❑System Retrofit ❑No System Changes <br /> Briefly describe mechanical systems in Existing building with new floor plan Existing DX split systems to remain.Air distribution to be replace according <br /> the text box provided to new layout Existing Economizer function at air handlers to remain New bathroom exhaust fans and <br /> ❑Total Bldg Performance(TBP) ductwork <br /> This path includes all mandatory <br /> provisions per C401.2 Option 2 <br /> MECH-SUM,MECH-CHK,and C407 <br /> Energy Analysis forms required <br /> ❑ Load calculation summary ❑ MECH-LOAD-CALC Form <br /> Design Load Calculations Provide design load calculations for all mechanical systems and equipment serving the building heating,cooling or <br /> ventilating needs If a load calculation summary is provided with the permit documents that includes all applicable <br /> compliance information then the MECH-LOAD-CALC form is not required <br /> ❑ Mechanical Plans ❑ MECH-EQ Forms(TBD) <br /> Mechanical Schedules Indicate location of equipment compliance information.If provided on plans then MECH-EQ forms are not required, <br /> however,include on plans all applicable compliance information listed in MECH-EQ tables <br /> ❑ DOAS is required per C403 6 effective July 1,2017(office,retail,education,library and fire station occupancies) <br /> All occupied,conditioned areas shall be served by a DOAS that delivers required ventilation air in a manner that does <br /> not require space conditioning fan operation Space conditioning fans cycled off when no heating or cooling is required <br /> Dedicated Outdoor Air ❑ Ventilation provided via natural ventilation per 2015 IMC inlieu of DOAS(C403 6,Exception 1) <br /> System Requirements and ❑ Ventilation and space conditioning provided by a HEVAV system per C403 7 inlieu of DOAS(C403 6,Exception <br /> 2) <br /> High Efficiency VAV ❑ DOAS included in project,although not required(occupancy not office,retail,education,library or fire station) <br /> Alternate ❑ DOAS related allowances included in project <br /> ❑ Prescriptive vertical fenestration maximum area allowance increased to 40%per C402 4 1 4 with 100%of <br /> conditioned floor area in building served by DOAS <br /> ❑ Exception to air economizer per C403 3 Exception 1,include MECH-ECONO form <br /> ❑ Project includes HVAC air distribution systems that provide heating and/or cooling <br /> If yes,provide a MECH-FANSYS-SUM form <br /> Fan Power ❑ For one or more systems,the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp <br /> If yes,provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold <br /> Refer to Section C403 2 11 and MECH-FANSYS-DOC for requirements and exceptions <br /> ❑ Hydronic chilled water ❑ Water-loop heat pump ❑ No hydronic systems <br /> HVAC Hydronic Systems <br /> ❑ Hydronic heating water ❑ Geothermal <br /> ❑ C406 2 More efficient HVAC equipment and fan systems <br /> Requires 90%of heating and cooling capacity to be equipment listed in tables C403.2 3(1)-(9)or air-to-water heat <br /> pumps and heat recovery chillers All equipment listed in tables C403.2.3(1)-(7)must be 15%more efficient than <br /> C406 Additional minimum requirements All stand alone supply,retum,and exhaust fans over lhp must have FEQ a 71 and must be <br /> selected within 10%of maximum total or static pressure <br /> Efficiency Options- ❑ C406 6 Dedicated outdoor air system(DOAS) <br /> Mechanical Requires 90%of conditioned floor area to be served by a DOAS per C403 6 that delivers required ventilation air in a <br /> manner that does not require space conditioning fan operation <br /> ❑ C406 7 Reduced energy in service water heating <br /> Requires 90%of floor area be in occupancy types listed in C406 7 1 and that 60%of annual hot water energy use be <br /> provided by heat pump,waste heat recovery or solar water-heating systems <br />