1 2 3 4
<br /> GENERAL SHEET NOTES
<br /> LUMINAIRE SCHEDULE I 1. "OO DENOTES FEEDER REFERENCE.REFER TO SHEET E-2 FOR FEEDERICIRCUIT
<br /> SCHEDULE. G P D G Q O U P
<br /> SYMBOL QUANTITY SERIES WATTS COLOR TEMPERATURE DISTRIBUTION VOLTAGE MOUNTING FINISH ACCESSORIES ii �P 2. CONTRACTOR SHALL REFER TO CIVIL SHEETS FOR EXISTING LANDSCAPING TO Professional Corporation
<br /> II i�i REMAIN AND PROPOSED LANDSCAPING. 520 south Main Street Suite 2531
<br /> STD.ARM Ak GH4 11
<br /> 1 SLi LED 75 40K T3 120-277V gLPSSS 4" BRONZE SENSOR(SN),PHOTOCELL(PC) iI 3. CONTRACTOR SHALL HAND DIG AROUND ALL EXISTING UTILITIES. 330.572.21M Fax330.572.2101
<br /> II
<br /> CATALOG NUMBER:LINMORE-LL-SLI-MD-75W-40K-T3-UNV-BRN-SA-SN-PC
<br /> 20'POLE,MATCH EXISTING COLOR AS REQUIRED r•;•;•;•;•;•;•;•/ 4. CONDUIT ELBOWS SHALL BE SIZED PER NEC.CONTRACTOR SHALL VERIFY
<br /> MANUFACTURER ALLOWABLE FILL AND MINIMUM CONDUCTOR BENDING RADIUS.SEE
<br /> �••`•`•••••`•`••{ ii FEEDER SCHEDULE FOR CONDUIT&CONDUCTOR SPECIFICATIONS.
<br /> �•.•...;.;...{ — — — _ 5. ALL CONDUITS ACCESSIBLE TO THE PUBLIC OR WHICH CAN BE DAMAGED SHALL BE
<br /> RIGID GALVANIZED STEEL.
<br /> I I
<br /> 6. PROPERTY LINE AND RIGHT-OF-WAY BOUNDARIES ARE SHOWN FOR REFERENCE
<br /> C ONLY.REFER TO SURVEY BY OTHERS FOR EXACT LOCATION.
<br /> I I Ip 7. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITH
<br /> THE APPROPRIATE UTILITY ENGINEER TO ENSURE ACCURACY OF INSTALLATION.
<br /> 8. ALL PROPOSED CONDUITS MUST MEET MINIMUM DEPTH REQUIREMENTS AS nu oeea chef
<br /> l OUTLINED IN TRENCH DETAILS,AS WELL AS MAINTAIN A MINIMUM OF 18"CLEAR OF a—ALTo A.ow
<br /> �•`•••`•'•`•••`•`{ ALL EXISTING OBSTRUCTIONS INCLUDING(BUT NOT LIMITED TO)STORM PIPES, Iswl ce�aaoo
<br /> •'{ SANITARY PIPES,WATER LINES AND OTHER UNDERGROUND UTILITIES.
<br /> h•;•;•;•;•;•;•;.1
<br /> I I I 9. FOR TRAFFIC CONTROL PROCEDURES(IF APPLICABLE),SEE TRAFFIC CONTROL
<br /> {'•'''''`•`{ _ II NOTES ON SHEET GN-1.
<br /> •,•,,,,,,,{ 10. ALL PARKING LOT LIGHTING SHALL BE EXISTING TO REMAIN UNLESS OTHERWISE
<br /> _ NOTED.IF EXISTING LIGHTING REQUIRES MODIFICATIONS OR TEMPORARY REMOVAL
<br /> .':':'.'.'. DURING CONSTRUCTION THE CONTRACTOR SHALL INFORM TELSA AND LANDLORD
<br /> {,•,•,•,•,•,•,•I REPRESENTATIVE PRIOR TO REMOVAL.
<br /> (.:.;.....:.::.:l
<br /> ......:J I i 11. NEW PRIMARY ELECTRICAL TIE IN IS LESS THAN 10 FEET IN LENGTH AND WILL BE
<br /> PROPOSED CONDUITS _ INSTALLED FROM AN OPEN PIT;NO BORING OR TRENCHING TO BE USED.
<br /> r•;•;•;•;•;•;•;•{ 2 ROUTED FROM EACH CABINET ii ii Z w w
<br /> �•;•;•;•;•;•;•;•] O E_3 TO CENTER CABINET FOR li II O 3
<br /> SHARED DC BUS CONNECTION H w w m N
<br /> {....•.......•../ II A d w w o o z z
<br /> '{ (6)PROPOSED CONDUITS FROM U W w o 0
<br /> (2)PROPOSED - U o ug Igi w w
<br /> {'''•''''•l g CHARGEPOINT PROPOSED CENTER CABINET PROPOSED SWITCHGEAR TO LU m m w m z z
<br /> DUAL-PORT LEVEL 2 FOR STAR CONNECTED DC PROPOSED CHARGING CABINETS O O z z m w
<br /> (.;.'.'.'.'.'.;.� CHARGING POSTS(TYP.) BUS BETWEEN ALL CABINETS (2 PER CHARGING CABINET)ALONG 2 2 5 o w o o w w
<br /> WITH(3)CONDUITS FOR E_3 OO w w m Tn
<br /> ..� ' _—__--_ =—COMMUNICATION CABLES FROM r�ii vi c�7 z > >
<br /> PROPOSED 1"CONDUITS
<br /> r•;•`•`•`•`•`•`•{ j\\/ MASTER CONTROLLER TO EACH
<br /> CHARGING CABINET
<br /> FROM CHARGEPOINT SUB T p
<br /> {.'.'.•.• E-3 PANEL TO CHARGEPOINT 0
<br /> {,•,•,•,•,•,•,•,•{ a LEVEL 2 CHARGERS d p PROPOSED 37.5KVA STEP-DOWN ~
<br /> • ____ __�____ —TRANSFORMER W/INTEGRATED > o 0 0
<br /> 200A SUB-PANEL MOUNTED ON ¢ m o 0
<br /> 2 �W CONCRETE PAD N
<br /> .'. ______________ —
<br /> '� (1)PROPOSED CONDUIT .4 p
<br /> B {•'• PROPOSED CONDUIT FOR AREA LIGHT. 3 I (FROM SWITCHGEAR TO 2 7 ,S�',tF,oF W�W4G
<br /> {.' .'10. E-3 SEE SCHEDULE ON THIS SHEET. i - 37.5KVA STEP-DOWN
<br /> l•;•; 2 jl TRANSFORMER)
<br /> ,•{ .-� PROPOSED SWITCHGEAR
<br /> �" ASSEMBLY W/INTEGRATED MASTER
<br /> WM
<br /> M dh ¢/T 7 CONTROLLER-DEAD BACK 5jy.�a5�{'.'.'.'.'.•.'.'� 2B W I ��70DIAL�
<br /> 2A it` 09/08/22
<br /> PROPOSEDUNDERGROUND EXPIRES02/03/2024
<br /> SERVICE LATERAL CONDUITS 1
<br /> (12)PROPOSED TESLA W FROM PROPOSED O
<br /> 2C _ 3 3 CHARGING POST TRANSFORMER TO PROPOSED E-3 }
<br /> ..I I E-3 CONDUITS(1 PER POST) j a SWITCHGEAR PER POWER Q
<br /> •' I COMPANY REQUIREMENTS
<br /> (3)PROPOSED > Z
<br /> %�//�., •• ••••.� TESLACHARGING J 00 Q
<br /> {7•:::::::.:::::� 2D _ C-4 CABINETS(TYP.) J z CD J J
<br /> PROPOSED DUAL FIXTURE 1C �-- _ __- PROPOSED UTILITY TRANSFORMER cQc O 00 Q
<br /> AREA LIGHT ON CONCRETE I WITH TAPS,480V1277V,30,4W G m
<br /> ` C5 FOUNDATION. I SECONDARY ON CONCRETE PAD W/ <
<br /> 5'-4"z 9'4"x 4'-0"UTILITY VAULT. F-- 3: 0/ z
<br /> REFER TO
<br /> I SUPPLEMENTAL Lu
<br /> PROPOSED UNDERGROUND PRIMARY PAD DETAIL TONSTALLA ON !, w
<br /> c . G; { CONDUITS&CONDUCTORS.COORDINATE J W J ~ U
<br /> WITH UTILITY FOR CONDUIT SIZE,QUANTITY, 11 LLI w
<br /> o { w y 38' _ COMPLETE ROUTING AND PROVIDE ALL PROPOSED UNDERGROUND > w (if J
<br /> LABOR AND MATERIALS AS REQUIRED.REFER '° PRIMARY TIE IN BY UTILITY. L j [-- W D
<br /> 1A TO FINAL UTILITY DESIGN. /N J � —> w V
<br /> LU
<br /> /s
<br /> Lu
<br /> X J j__3C z PROPOSED 4'-8"z 7'-0"x 4'-0"UTILITY L(")
<br /> VAULT,REFER TO UTILITY DESIGN Q
<br /> FOR FINAL LOCATION&DETAILS
<br /> o {;•;'`'`•`•`'`•`•{w 3D i�$ (12)PROPOSED TESLA s3/ /° / ISSUED FOR:
<br /> {:,;•;' •'7 _______. ,,;CHARGING POSTS(TYP.) PERMIT XXX
<br /> ii' ___—___�_1 II / /
<br /> EXISTING 10'UNDERGROUND
<br /> 3 `: •\ w I I ss DISTRIBUTION OF RIGHT OF BID XXX
<br /> A WAY EASEMENT
<br /> XXX
<br /> XXX
<br /> INSTALL MANAGER GESIGNER
<br /> II\,',•,',',',•,',•�= EXISTING IO'SANITARY SEWER
<br /> it I) EASEMENT �\�` / „%' /p+� COURN YER JDP
<br /> a ii . .a£4''1 /cnai /� JOB NO.
<br /> -\.•. s/_ d 2020141.35
<br /> ry N Ili / '�'� \.•, �\ /t/ \ J Gps&
<br /> _E ®E E- 1
<br /> w
<br /> n
<br /> ON FULL SIZE SCALE'.1"=10'
<br />
|