Laserfiche WebLink
1 2 3 4 <br /> GENERAL SHEET NOTES <br /> LUMINAIRE SCHEDULE I 1. "OO DENOTES FEEDER REFERENCE.REFER TO SHEET E-2 FOR FEEDERICIRCUIT <br /> SCHEDULE. G P D G Q O U P <br /> SYMBOL QUANTITY SERIES WATTS COLOR TEMPERATURE DISTRIBUTION VOLTAGE MOUNTING FINISH ACCESSORIES ii �P 2. CONTRACTOR SHALL REFER TO CIVIL SHEETS FOR EXISTING LANDSCAPING TO Professional Corporation <br /> II i�i REMAIN AND PROPOSED LANDSCAPING. 520 south Main Street Suite 2531 <br /> STD.ARM Ak GH4 11 <br /> 1 SLi LED 75 40K T3 120-277V gLPSSS 4" BRONZE SENSOR(SN),PHOTOCELL(PC) iI 3. CONTRACTOR SHALL HAND DIG AROUND ALL EXISTING UTILITIES. 330.572.21M Fax330.572.2101 <br /> II <br /> CATALOG NUMBER:LINMORE-LL-SLI-MD-75W-40K-T3-UNV-BRN-SA-SN-PC <br /> 20'POLE,MATCH EXISTING COLOR AS REQUIRED r•;•;•;•;•;•;•;•/ 4. CONDUIT ELBOWS SHALL BE SIZED PER NEC.CONTRACTOR SHALL VERIFY <br /> MANUFACTURER ALLOWABLE FILL AND MINIMUM CONDUCTOR BENDING RADIUS.SEE <br /> �••`•`•••••`•`••{ ii FEEDER SCHEDULE FOR CONDUIT&CONDUCTOR SPECIFICATIONS. <br /> �•.•...;.;...{ — — — _ 5. ALL CONDUITS ACCESSIBLE TO THE PUBLIC OR WHICH CAN BE DAMAGED SHALL BE <br /> RIGID GALVANIZED STEEL. <br /> I I <br /> 6. PROPERTY LINE AND RIGHT-OF-WAY BOUNDARIES ARE SHOWN FOR REFERENCE <br /> C ONLY.REFER TO SURVEY BY OTHERS FOR EXACT LOCATION. <br /> I I Ip 7. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITH <br /> THE APPROPRIATE UTILITY ENGINEER TO ENSURE ACCURACY OF INSTALLATION. <br /> 8. ALL PROPOSED CONDUITS MUST MEET MINIMUM DEPTH REQUIREMENTS AS nu oeea chef <br /> l OUTLINED IN TRENCH DETAILS,AS WELL AS MAINTAIN A MINIMUM OF 18"CLEAR OF a—ALTo A.ow <br /> �•`•••`•'•`•••`•`{ ALL EXISTING OBSTRUCTIONS INCLUDING(BUT NOT LIMITED TO)STORM PIPES, Iswl ce�aaoo <br /> •'{ SANITARY PIPES,WATER LINES AND OTHER UNDERGROUND UTILITIES. <br /> h•;•;•;•;•;•;•;.1 <br /> I I I 9. FOR TRAFFIC CONTROL PROCEDURES(IF APPLICABLE),SEE TRAFFIC CONTROL <br /> {'•'''''`•`{ _ II NOTES ON SHEET GN-1. <br /> •,•,,,,,,,{ 10. ALL PARKING LOT LIGHTING SHALL BE EXISTING TO REMAIN UNLESS OTHERWISE <br /> _ NOTED.IF EXISTING LIGHTING REQUIRES MODIFICATIONS OR TEMPORARY REMOVAL <br /> .':':'.'.'. DURING CONSTRUCTION THE CONTRACTOR SHALL INFORM TELSA AND LANDLORD <br /> {,•,•,•,•,•,•,•I REPRESENTATIVE PRIOR TO REMOVAL. <br /> (.:.;.....:.::.:l <br /> ......:J I i 11. NEW PRIMARY ELECTRICAL TIE IN IS LESS THAN 10 FEET IN LENGTH AND WILL BE <br /> PROPOSED CONDUITS _ INSTALLED FROM AN OPEN PIT;NO BORING OR TRENCHING TO BE USED. <br /> r•;•;•;•;•;•;•;•{ 2 ROUTED FROM EACH CABINET ii ii Z w w <br /> �•;•;•;•;•;•;•;•] O E_3 TO CENTER CABINET FOR li II O 3 <br /> SHARED DC BUS CONNECTION H w w m N <br /> {....•.......•../ II A d w w o o z z <br /> '{ (6)PROPOSED CONDUITS FROM U W w o 0 <br /> (2)PROPOSED - U o ug Igi w w <br /> {'''•''''•l g CHARGEPOINT PROPOSED CENTER CABINET PROPOSED SWITCHGEAR TO LU m m w m z z <br /> DUAL-PORT LEVEL 2 FOR STAR CONNECTED DC PROPOSED CHARGING CABINETS O O z z m w <br /> (.;.'.'.'.'.'.;.� CHARGING POSTS(TYP.) BUS BETWEEN ALL CABINETS (2 PER CHARGING CABINET)ALONG 2 2 5 o w o o w w <br /> WITH(3)CONDUITS FOR E_3 OO w w m Tn <br /> ..� ' _—__--_ =—COMMUNICATION CABLES FROM r�ii vi c�7 z > > <br /> PROPOSED 1"CONDUITS <br /> r•;•`•`•`•`•`•`•{ j\\/ MASTER CONTROLLER TO EACH <br /> CHARGING CABINET <br /> FROM CHARGEPOINT SUB T p <br /> {.'.'.•.• E-3 PANEL TO CHARGEPOINT 0 <br /> {,•,•,•,•,•,•,•,•{ a LEVEL 2 CHARGERS d p PROPOSED 37.5KVA STEP-DOWN ~ <br /> • ____ __�____ —TRANSFORMER W/INTEGRATED > o 0 0 <br /> 200A SUB-PANEL MOUNTED ON ¢ m o 0 <br /> 2 �W CONCRETE PAD N <br /> .'. ______________ — <br /> '� (1)PROPOSED CONDUIT .4 p <br /> B {•'• PROPOSED CONDUIT FOR AREA LIGHT. 3 I (FROM SWITCHGEAR TO 2 7 ,S�',tF,oF W�W4G <br /> {.' .'10. E-3 SEE SCHEDULE ON THIS SHEET. i - 37.5KVA STEP-DOWN <br /> l•;•; 2 jl TRANSFORMER) <br /> ,•{ .-� PROPOSED SWITCHGEAR <br /> �" ASSEMBLY W/INTEGRATED MASTER <br /> WM <br /> M dh ¢/T 7 CONTROLLER-DEAD BACK 5jy.�a5�{'.'.'.'.'.•.'.'� 2B W I ��70DIAL� <br /> 2A it` 09/08/22 <br /> PROPOSEDUNDERGROUND EXPIRES02/03/2024 <br /> SERVICE LATERAL CONDUITS 1 <br /> (12)PROPOSED TESLA W FROM PROPOSED O <br /> 2C _ 3 3 CHARGING POST TRANSFORMER TO PROPOSED E-3 } <br /> ..I I E-3 CONDUITS(1 PER POST) j a SWITCHGEAR PER POWER Q <br /> •' I COMPANY REQUIREMENTS <br /> (3)PROPOSED > Z <br /> %�//�., •• ••••.� TESLACHARGING J 00 Q <br /> {7•:::::::.:::::� 2D _ C-4 CABINETS(TYP.) J z CD J J <br /> PROPOSED DUAL FIXTURE 1C �-- _ __- PROPOSED UTILITY TRANSFORMER cQc O 00 Q <br /> AREA LIGHT ON CONCRETE I WITH TAPS,480V1277V,30,4W G m <br /> ` C5 FOUNDATION. I SECONDARY ON CONCRETE PAD W/ < <br /> 5'-4"z 9'4"x 4'-0"UTILITY VAULT. F-- 3: 0/ z <br /> REFER TO <br /> I SUPPLEMENTAL Lu <br /> PROPOSED UNDERGROUND PRIMARY PAD DETAIL TONSTALLA ON !, w <br /> c . G; { CONDUITS&CONDUCTORS.COORDINATE J W J ~ U <br /> WITH UTILITY FOR CONDUIT SIZE,QUANTITY, 11 LLI w <br /> o { w y 38' _ COMPLETE ROUTING AND PROVIDE ALL PROPOSED UNDERGROUND > w (if J <br /> LABOR AND MATERIALS AS REQUIRED.REFER '° PRIMARY TIE IN BY UTILITY. L j [-- W D <br /> 1A TO FINAL UTILITY DESIGN. /N J � —> w V <br /> LU <br /> /s <br /> Lu <br /> X J j__3C z PROPOSED 4'-8"z 7'-0"x 4'-0"UTILITY L(") <br /> VAULT,REFER TO UTILITY DESIGN Q <br /> FOR FINAL LOCATION&DETAILS <br /> o {;•;'`'`•`•`'`•`•{w 3D i�$ (12)PROPOSED TESLA s3/ /° / ISSUED FOR: <br /> {:,;•;' •'7 _______. ,,;CHARGING POSTS(TYP.) PERMIT XXX <br /> ii' ___—___�_1 II / / <br /> EXISTING 10'UNDERGROUND <br /> 3 `: •\ w I I ss DISTRIBUTION OF RIGHT OF BID XXX <br /> A WAY EASEMENT <br /> XXX <br /> XXX <br /> INSTALL MANAGER GESIGNER <br /> II\,',•,',',',•,',•�= EXISTING IO'SANITARY SEWER <br /> it I) EASEMENT �\�` / „%' /p+� COURN YER JDP <br /> a ii . .a£4''1 /cnai /� JOB NO. <br /> -\.•. s/_ d 2020141.35 <br /> ry N Ili / '�'� \.•, �\ /t/ \ J Gps& <br /> _E ®E E- 1 <br /> w <br /> n <br /> ON FULL SIZE SCALE'.1"=10' <br />