Laserfiche WebLink
FMP PHASE 5 <br />Surveying <br />VEHICLE STORAGE/TRAINING FACILITY <br />Engineering <br />LDICIPlanning <br />Engineer's Estimate: 100% Design <br />Tel: (425) 806-1869 <br />Project Name: <br />Description: <br />FMP Phase 5 <br />100% Estimate <br />Project No.: <br />Date: <br />Calc. By: <br />C21-180 <br />2/1/2022 <br />RKF <br />ITEM NO, ITEM DESCRIPTION <br />SPEC REF. I EST. QTY. I UNITS <br />I UNIT PRICE AMOUNT <br />FMP PHASE 5 VEHICLE _ T NiNG FAC14TY, <br />PREPARATION <br />1 <br />Minor Change <br />1-04.4 (1) <br />1 <br />FA <br />$ 5,000.00 <br />$ 5,000.00 <br />2 <br />Construction Surveying <br />1-05.4 <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />3 <br />SPCC Plan <br />1-07.15 <br />1 <br />LS <br />$ 1,000.00 <br />$ 1,000.00 <br />4 <br />Mobilization <br />1-09.7 <br />1 <br />LS <br />$ 275,787.00 <br />$ 275,787.00 <br />5 <br />Project Temporary Traffic Control <br />1-10 <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />6 <br />Potholing <br />SP <br />10 <br />EA <br />$ 500.00 <br />$ 5,000.00 <br />7 <br />Erosion Control and Water Pollution Prevention <br />8-01 <br />1 <br />LS <br />$ 12,000.00 <br />$ 12,000.00 <br />8 <br />Silt Fence <br />8-01 <br />2,447 <br />LF <br />$ 4.50 <br />$ 11,011.50 <br />9 <br />Inlet Protection <br />8-01 <br />15 <br />EA <br />$ 110.00 <br />$ 1,650.00 <br />10 <br />Clearing and Grubbing <br />2-01 <br />3 <br />AC <br />$ 9,500.00 <br />$ 31,445.00 <br />11 <br />Saw Cutting <br />SP 2-02.3 <br />208 <br />LF <br />$ 3.00 <br />$ 624.00 <br />12 <br />Removing Asphalt Conc. Pavement <br />SP 2-02.3 <br />50 <br />SY <br />$ 20.00 <br />$ 998.89 <br />13 <br />Removing Cement Conc. Curb and Gutter <br />SP 2-02.3 <br />202 <br />LF <br />$ 5.00 <br />$ 1,010.00 <br />14 <br />Removing Cement Conc. Sidewalk <br />SP 2-02.3 <br />112 <br />SY <br />$ 10.00 <br />$ 1,122.22 <br />15 <br />Removing Fence <br />SP 2-02.5 <br />1,284 <br />LF <br />$ 6.50 <br />$ 8,346.00 <br />16 <br />Stripping Incl. Haul (2 ft.) <br />SP 2-06 <br />10,701 <br />CY <br />$ 15.00 <br />$ 160,511.11 <br />UTILITIES <br />17 <br />Schedule A Storm Sewer Pipe 12 in. Diam. <br />7-04 <br />1,410 <br />LF <br />$ 38.00 <br />$ 53,580.00 <br />18 <br />Catch Basin Type 1 <br />7-05 <br />7 <br />EA <br />$ 2,100.00 <br />$ 14,700.00 <br />19 <br />Catch Basin Type 2 <br />7-05 <br />5 <br />EA <br />$ 2,800.00 <br />$ 14,000.00 <br />20 <br />Catch Basin Type 2 - 54" Dia. <br />7-05 <br />1 <br />EA <br />$ 3,500.00 <br />$ 3,500.00 <br />21 <br />BioPod Biofiltration System <br />SP 7-05 <br />1 <br />EA <br />$ 29,000.00 <br />$ 29,000.00 <br />22 <br />Oil Water Separator 4' x 6' <br />SP 7-05 <br />1 <br />EA <br />$ 11,000.00 <br />$ 11,000.00 <br />23 <br />Storm Sewer Pipe 6 in. Diam. <br />7-04 <br />75 <br />LF <br />$ 40.00 <br />$ 3,000.00 <br />24 <br />Structure Excavation Class Blncl. Haul <br />2-09 <br />288 <br />CY <br />$ 35.00 <br />$ 10,094.00 <br />25 <br />Detention Vault <br />SP 7-05 <br />1 <br />LS <br />$ 422,912.00 <br />$ 422,912.00 <br />26 <br />Structure Excavation Class A Incl. Haul <br />2-09 <br />1,820 <br />CY <br />$ 30.00 <br />$ 54,600.00 <br />27 <br />Connect to Existing Sanitary Sewer Main <br />7-17 <br />1 <br />EA <br />$ 1,500.00 <br />$ 1,500.00 <br />28 <br />PVC Sanitary Sewer Pipe 6 In. Diam. <br />7-17 <br />252 <br />LF <br />$ 42.00 <br />$ 10,584.00 <br />29 <br />Sewer Cleanout <br />7-18 <br />3 <br />EA <br />$ 920.00 <br />$ 2,760.00 <br />30 <br />Ductile Iron Pipe for Water Main 8 In. Diam. <br />7-09 <br />751 <br />LF <br />$ 75.00 <br />$ 56,325.00 <br />31 <br />Ductile Iron Pipe for Water Main 6 In. Diam. <br />7-09 <br />276 <br />LF <br />$ 60.00 <br />$ 16,560.00 <br />32 <br />Gate Valve 8 In. <br />7-09 <br />2 <br />EA <br />$ 1,650.00 <br />$ 3,300.00 <br />33 <br />Hydrant Assembly <br />7-09 <br />3 <br />EA <br />$ 5,200.00 <br />$ 15,600.00 <br />34 <br />Water Main Fittings <br />7-09 <br />1 <br />LS <br />$ 1,500.00 <br />$ 1,500.00 <br />35 <br />Connect to Existing Water Main <br />7-09 <br />2 <br />EA <br />$ 1,000.00 <br />$ 2,000.00 <br />36 <br />1" Water Meter <br />7-09 <br />2 <br />EA <br />$ 1,240.00 <br />$ 2,480.00 <br />37 <br />Double Check Valve <br />7-09 <br />1 <br />EA <br />$ 2,500.00 <br />$ 2,500.00 <br />SURFACING <br />38 <br />Select Borrow Incl. Haul <br />2-03.3 <br />5,244 <br />CY <br />$ 32.00 <br />$ 167,815.11 <br />39 <br />Common Borrow Incl. Haul <br />2-03.3 <br />3,086 <br />CY <br />$ 25.00 <br />$ 77,155.56 <br />40 <br />Crushed Surface Base Course <br />4-04 <br />4,287 <br />TN <br />$ 45.00 <br />$ 192,925.71 <br />41 <br />Crushed Surfacing Top Course <br />4-04 <br />888 <br />TN <br />$ 48.00 <br />$ 42,632.22 <br />42 <br />HMA CL. 3/4" PG 581-1-22 <br />5-04 <br />3,445 <br />TN <br />$ 155.00 <br />$ 533,922.97 <br />43 <br />Cement Concrete Pavement <br />5-05 <br />1,235 <br />CY <br />$ 350.00 <br />$ 432,098.77 <br />44 <br />Cement Conc. Sidewalk <br />8-14 <br />489 <br />SY <br />$ 75.00 <br />$ 36,650.00 <br />45 <br />Cement Conc. Driveway Ramp Type 1 <br />SP 8-06 <br />29 1 <br />SY <br />$ 115.00 1 <br />$ 3,297.00 <br />Page 1 of 2 <br />