Laserfiche WebLink
FMP PHASE 5 <br />Surveying <br />VEHICLE STORAGE/TRAINING FACILITY <br />LDCIPlanning <br />Engineering <br />Engineer's Estimate: 100% Design <br />Tel: (425) 806-1869 <br />Project Name: <br />Description: <br />FMP Phase 5 <br />100% Estimate <br />Project No.: <br />Date: <br />Calc. By: <br />C21-180 <br />2/1/2022 <br />RKF <br />ITEM NO. <br />I ITEM DESCRIPTION <br />SPEC REF. <br />I EST. CITY. <br />I UNITS <br />I UNIT PRICE <br />JAMOUNT <br />STRUCTURES <br />46 <br />Move Modular Building <br />SP <br />2 <br />EA <br />$ 13,000.00 <br />$ 26,000.00 <br />47 <br />Modular Building Conc. Pad/Foundation <br />SP 5-05 <br />82 <br />CY <br />$ 350.00 <br />$ 28,855.56 <br />48 <br />Modular Unit Tenent Improvements <br />SP <br />1 <br />LS <br />$ 40,000.00 <br />$ 40,000.00 <br />49 <br />Data/Fire Alarm Connection <br />SP 8-20 <br />2 <br />EA <br />$ 3,000.00 <br />$ 6,000.00 <br />50 <br />Cast -In -Place Retaining Wall <br />6-11 <br />640 <br />1 SF <br />1 $ 70.00 <br />1 $ 44,794.00 <br />TRAFFIC <br />51 <br />Type E-1 Cement Concrete Curb <br />SP 8-04 <br />1,551 <br />LF <br />$ 27.00 <br />$ 41,877.00 <br />52 <br />Type A-1 Cement Concrete Curb and Gutter <br />SP 8-04 <br />55 <br />LF <br />$ 30.00 <br />$ 1,650.00 <br />53 <br />Cement Concrete Integral Curb <br />SP 8-04 <br />330 <br />LF <br />$ 65.00 <br />$ 21,450.00 <br />54 <br />Cement Concrete Curb - 10 In. High x 18 In. Wide <br />SP 8-04 <br />60 <br />LF <br />$ 45.00 <br />$ 2,700.00 <br />55 <br />Integral Cement Conc. Curb Transition - 6 In. to 10 In. <br />SP 8-04 <br />10 <br />LF <br />$ 45.00 <br />$ 450.00 <br />56 <br />Yellow Curb Bump Rail <br />SP 8-04 <br />60 <br />LF <br />$ 60.00 <br />$ 3,600.00 <br />57 <br />Painted Double Yellow Centerline <br />8-22 <br />245 <br />LF <br />$ 5.00 <br />$ 1,225.00 <br />58 <br />Single Dashed Yellow Centerline <br />8-22 <br />252 <br />LF <br />$ 4.50 <br />$ 1,134.00 <br />59 <br />4" Wide Painted White Parking Stall Line <br />8-22 <br />5,721 <br />LF <br />$ 4.00 <br />$ 22,884.00 <br />60 <br />Painted Crosshatch Marking <br />8-22 <br />2,187 <br />LF <br />$ 4.00 <br />$ 8,748.00 <br />61 <br />Plastic Stop Line <br />8-22 <br />61 <br />SF <br />$ 16.00 <br />$ 982.00 <br />62 <br />Yellow Curb Paint <br />8-22 <br />70 <br />LF <br />$ 25.00 <br />$ 1,750.00 <br />63 <br />Plastic Access Parking Space Symbol <br />8-22 <br />1 <br />EA <br />$ 600.00 <br />$ 600.00 <br />64 <br />ADA/Access Parking Sign <br />8-21 <br />1 <br />EA <br />$ 175.00 <br />$ 175.00 <br />65 <br />Stop Sign <br />8-21 <br />2 <br />EA <br />$ 200.00 <br />$ 400.00 <br />66 <br />Monument Sign <br />SP 8-21 <br />1 <br />EA <br />$ 6,000.00 <br />$ 6,000.00 <br />67 <br />Isite Signage Package <br />SP 8-21 <br />1 1 <br />1 LS <br />$ 8,500.00 <br />$ 8,500.00 <br />OTHER ITEMS <br />68 <br />Cement Conc. Curb Ramp Type Single Direction <br />8-14 <br />2 <br />EA <br />$ 3,500.00 <br />$ 7,000.00 <br />69 <br />Cement Concrete Steps <br />SP 8-14 <br />28 <br />SF <br />$ 120.00 <br />$ 3,360.00 <br />70 <br />Cement Concrete Ramp <br />SP 8-14 <br />185 <br />SF <br />$ 65.00 <br />$ 12,025.00 <br />71 <br />Pedestrain Guard <br />SP 8-14 <br />105 <br />LF <br />$ 125.00 <br />$ 13,125.00 <br />72 <br />Chain Link Fence Type 4 (4 ft) <br />8-12 <br />243 <br />LF <br />$ 32.00 <br />$ 7,776.00 <br />73 <br />Steel Security Fence (8 ft) <br />SP 8-12 <br />1,772 <br />LF <br />$ 220.00 <br />$ 389,840.00 <br />74 <br />27 ft Steel Driveway Gate <br />SP 8-12 <br />1 <br />EA <br />$ 20,000.00 <br />$ 20,000.00 <br />75 <br />Automatic Gate Operator <br />SP 8-12 <br />1 <br />EA <br />$ 20,000.00 <br />$ 20,000.00 <br />76 <br />Steel Person Gate - Automated <br />SP 8-12 <br />1 <br />EA <br />$ 3,000.00 <br />$ 3,000.00 <br />77 <br />Illumination System Complete <br />SP 8-20 <br />1 <br />LS <br />$ 80,000.00 <br />$ 80,000.00 <br />78 <br />Security System, Complete <br />SP 8-20 <br />1 <br />LS <br />$ 70,000.00 <br />$ 70,000.00 <br />79 <br />Code Blue Emergency Beacon <br />SP 8-20 <br />1 <br />EA <br />$ 10,000.00 <br />$ 10,000.00 <br />80 <br />Topsoil Class A (3") <br />8-02 <br />161 <br />CY <br />$ 165.00 <br />$ 26,527.00 <br />81 <br />Landscaping <br />SP 8-02 <br />1 <br />LS <br />$ 10,018.06 <br />$ 10,018.00 <br />82 <br />Type It Landscape Buffer Enhancements <br />SP 8-02 <br />1,015 <br />LF <br />$ 26.78 <br />$ 27,180.00 <br />83 <br />Temporary Ecology Block Wall <br />6-13 <br />180 <br />SF <br />$ 40.00 <br />$ 7,200.00 <br />84 <br />JSnohomish Basin Wetland Bank <br />1-07 <br />1 <br />1 LS <br />$ 24,000.00 <br />$ 24,000.00 <br />SUBTOTAL <br />$ 3,754,323.61 <br />SALES TAX (9.8%) <br />$ 367,923.71 <br />BID PACKAGE TOTAL <br />$ 4,1.22,247.33 <br />CONSTRUCTION CONTINGENCY (10%) <br />$ 412,225.00 <br />PROJECT TOTAL <br />$ 4,534,472.33 <br />Notes <br />All information on this estimate has been updated such that it is relevant to the 2021 WSDOT Standard Specifications. <br />Page 2 of 2 <br />