My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7800 EVERGREEN WAY HYUNDAI Drainage Report 2025-04-28
>
Address Records
>
EVERGREEN WAY
>
7800
>
HYUNDAI
>
Drainage Report
>
7800 EVERGREEN WAY HYUNDAI Drainage Report 2025-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 2:44:55 PM
Creation date
4/28/2025 2:43:07 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7800
Tenant Name
HYUNDAI
Address Document Type
Drainage Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 3. Proposed Conditions <br /> The proposed project will remodel and replace the existing 7,600-square-foot showroom with an approximately <br /> 12,000-square-foot, two-story showroom and offices facing Evergreen Way. The project will include perimeter <br /> landscape improvements and restriping across the site and regrading the eastern third of the lot. Existing utility <br /> connections will be maintained and reused for the remodeled showroom and outbuilding. Site improvements <br /> include new curb, landscaping, illumination, signage and trees onsite and new street trees in the planter strip <br /> adjacent to Evergreen Way. Existing driveways off Evergreen Way will be maintained for site access. <br /> The NW basin currently running off onto the neighboring property to the north will be captured and treated as <br /> part of this remodel. Stormwater from the NW Basin will be collected and conveyed to an infiltration system in <br /> the northeast corner of the site. New roof drainage will be captured within a detention system in the central <br /> parking lot adjacent to Evergreen Way. <br /> As described below, water quality and flow control requirements for the disturbed areas will be achieved using <br /> an area swap. See Figure 3-1 for Proposed Basins Map and Appendix A for the Proposed Conditions. <br /> '; '. . , . ) , 1 1 -TE115 ...„:: •.: ' ' <br /> FIFFIT <br /> ` I ' IIi <br /> -1,. Central B..sin %, ,' • /// <br /> ' ' <br /> ,, /0 . S",,/ <br /> ... \� ,i����, <br /> i <br /> - <br /> Figure 3-1: Proposed Basins <br /> APPLICABLE MINIMUM REQUIREMENTS <br /> Applicable minimum requirements from the Everett Municipal Code (EMC), Section 14.28, depend on project <br /> type and size. Based on the flow charts and thresholds in EMC and DOE Manual, the project will trigger <br /> Minimum Requirement#1-9. <br /> MINIMUM REQUIREMENT 1 : PREPERATION OF STORMWATER SITE PLANS <br /> Detailed grading and storm drainage plans depicting locations and sizes of stormwater elements will be <br /> prepared for this development. These drawings will be included with the commercial construction permit <br /> submittal. Refer to Appendix A for Proposed Conditions. <br /> LMJ Hyundai—Showroom Remodel <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.