Laserfiche WebLink
@FAIVICH <br />D E S I G N S T U D I O <br />FIRE WRAP SPEC SHEET <br />U Morgan U Morgan U Morgan U Morgan <br />CAdvanced Materials F/Rf({�gS'TfR C Advanced Materials Affl"S'7ER- C Advanced Materials FIR"ER C Advanced Materials <br />Datasheet Code US: 714-236 <br />© 2014 Thermal Ceramics is a business of Morgan Advanced Materials <br />ICC <br />U C Fs <br />L � <br />Q U <br />OL <br />LISTED <br />�Commonry rearreato test method CA Scton wasp is CDPH standard Method forme Testing <br />and Evaluation of Volatile Omanic Chemical Emissions from Indoor sources Using Environmental <br />Chambers Version 1.1,Felf <br />Grease Duct Enclosure System <br />Air Ventilation Duct Enclosure System <br />Product Data & Installation Guide <br />1. Product Description <br />Thermal Ceramics FireMaster® FastWrap XL is a flexible <br />blanket composed of high temperature fibers classified for <br />applications to 2192°F (1200°C) and fully encapsulated in <br />a durable glass fiber reinforced foil facing for easy handling <br />and installation. Thermal Ceramics FastWrap XL is UL and <br />ULC Listed for Land 2 hour fire resistive enclosure <br />protection, zero clearance for kitchen exhaust ducts, <br />electrical circuit protection, and as a component in UL <br />firestop designs for fire resistance rated floors, ceilings, and <br />walls. The core fibers in FastWrap XL are manufactured <br />using Thermal Ceramics patented Superwool® fiber which is <br />an alkaline -earth silicate wool with low biopersistence and <br />therefore increased safety for installers. FastWrap XL is <br />under UL's Follow -Up Service Program to ensure the <br />consistent quality essential to this life -safety application. <br />Product Features <br />• Thin and Lightweight at 1-1/2" (38mm) thick, <br />6 pcf (96 kg/ri density <br />• Contours easily to complex duct designs <br />• Grease duct installation UL and ULC Listed with butt <br />joints at all seams on both layers <br />• Fully foil encapsulated for fast and clean installation <br />• Contains 2192°F (1200°C) rated fibers <br />• Microbial Resistance validated by UL Environment <br />• Good sound absorption <br />• Compliant to IMC, NFPA 96, UMC, CMC, CNBC <br />2. Applications <br />• 2 hour enclosure and firestop system stem for kitchen <br />exhates duct <br />• Zero clearance to combustibles <br />• 1 2 and 3 hour enclosure and firestop system stem for <br />hazardous exhaust ducts, pressurization ducts, clothes <br />dryer exhaust ducts, trash and linen chutes, and other <br />fire rated HVAC ducts <br />• 1 hour electrical circuit Y <br />inte rit protection <br />9 <br />• Engineered and tested solutions for fire protection of <br />structural steel and storage vessels per ASTM El 19, <br />ISO 834, and UL1709 <br />3. Specifications - Division 23 07 00 (or 15080) <br />CSI Spec and AutoCAD available online, <br />www.arcat.com/sd/clients/thermcer.html. <br />Thermal Ceramics FireMaster FastWrap XL is a flexible <br />high temperature insulation rated to 2192°F (1200°C) <br />that is fully encapsulated in FSP facing. The duct <br />enclosure system shall be listed by UL and /or ULC per <br />ASTM E 2336, CAN/ULC S144 and ISO 6944 for <br />1-, 2- and 3-hour rating and zero clearance to <br />combustibles, and tested per ASTM E84 for a flame/ <br />smoke rating less than 25/50. Insulation shall have a <br />nominal thickness of 1-1/2 inches (38 mm) and density <br />of 6 Ibs/ff3 (96 kg/hrl Insulation shall have a R-Value of <br />7.3 at 75°F. Installation shall be in strict accordance to <br />manufacturers published installation instructions, UL or <br />ULC Listings, and shop drawings. FastDoorTM XL shall <br />be used for duct access where specified Or as required <br />by code. <br />4. Physical Characteristics <br />Units/ <br />Wt./ <br />Product <br />Unit <br />Size <br />Ctn. <br />Ctn. <br />FastWrap XL <br />Roll <br />1-12" x 24" x 25' <br />1 <br />37.51Its. <br />FastWrap XL <br />Roll <br />1-12" x 48" x 25' <br />1 <br />75 lbs. <br />5. Performance Specifications <br />Reference Standard <br />Standard No. <br />Performance <br />Grease Duct Enclosure <br />ASTM E2336 <br />Pass <br />System <br />Section 16.1 - <br />Non -Combustibility <br />ASTM E136 <br />Pass <br />Section 16.2-Fire Resistance <br />ASTM Ell 9 <br />Pass <br />(wall) <br />Section 16.3 - Durability Test <br />ASTM C518 <br />Pass <br />Section 16.4- Internal Fire <br />ASTM E2336 <br />Pass <br />Test <br />Section 16.5 - Fire Engulfment <br />ASTM E814/ <br />(duct) <br />E11.9 <br />Pass <br />ULC Grease Duct Test <br />pass <br />Protocol <br />Standard Methods of Fire <br />Resistance Tests- Grease <br />CAN/ULCPass <br />5144 <br />Duct Assemblies <br />Grease Duct Clearances <br />UL 1978 <br />Pass <br />Air Ventilation Duct Enclosure <br />ISO 6944 <br />Pass <br />Surface Burning <br />ASTM E84 <br />Q5/50 <br />Characteristics <br />Thermal Resistance <br />ASTM C518 <br />7.3 per layer <br />(R-value @ 75*F) <br />Mold Growth <br />ASTM C1338 <br />ULE Validated <br />Low VOCs <br />CA Standard <br />ULE Validated <br />01350 <br />6. Listings/Building Code Reports <br />Listed Uses <br />Agency <br />Listing <br />Layers <br />Grease Duct Enclosure per <br />UL <br />G18 <br />ASTM E2336 and AC101 (2006, <br />2 <br />2009, 2012 IMC, NFPA 96, <br />ICC-ES <br />ESR 2213 <br />UMC, CMC) <br />ULC Grease Duct Test Protocol <br />ULC <br />FRD 4, 7* <br />2 <br />and CAN/ULC S144* <br />Grease Duct Insulation <br />OPL <br />TC/BI 120-01 <br />1 <br />(2003 IMC) <br />Through Penetration FireStop <br />UL <br />ULC <br />System per ASTM E814, <br />See Figure 2 <br />1 or 2 <br />UL 1479 <br />UL <br />HNLJ.V1, <br />1- or 2-hour Ventilation Duct <br />19,29 <br />Enclosure per ISO 6944-1985 <br />1 <br />FRD 3, 5 <br />ULC <br />, <br />6,18 <br />3-hour Ventilation Duct <br />UL <br />HNLJ.V2 <br />2 <br />per er ISO 6944-1985 <br />Electrical Circuit Protective. <br />UL <br />FHIT.S <br />2 <br />System <br />7. Storage <br />g <br />Thermal Ceramics FastWrapXL must be stored in a dry <br />Y <br />warehouse environment on pallets. Pallets should not be <br />stacked. <br />8. Installation <br />Thermal Ceramics FastWrap XL shall be installed by a <br />qualified contractor in accordance with manufacturer's <br />instructions and laboratory design listings. <br />Materials and Equipment <br />• Thermal Ceramics FastWrap XL blanket <br />• Aluminum foil tape <br />• Glass filament reinforced tape (optional) <br />• Carbon steel or stainless steel banding material, <br />minimum 1/2" (1 3mm) wide, minimum 0.015" (0.4mm) <br />thick, with steel banding clips <br />• Hand banding tensioner and crimping tool <br />• Minimum 12 gage (3mm) steel insulation pins; steel <br />speed clips, minimum 1-1/2" (38mm) square or <br />1-1/2" (38mm) diameter, Or equivalent sized cup -head <br />pins; <br />in Capacitor discharge stud gun <br />• Thermal Ceramics FastDoorTM XL <br />• An approved firestop sealant <br />www.morganthermalceramics.com www.morganthermalceramics.com <br />12:2014 Page 1 of 8 12:2014. Page 2 of 8 <br />11 Morgan U Morgan <br />CAdvanced Materials FIR"ffifk C Advanced Materials F/R"M <br />Grease and HVAC Duct Enclosure System <br />1 or 2 Hour Shaft Alternative / Zero Clearance to Combustibles <br />Butt Joint / Butt Joint Typical 3 <br />TWO LAYER INSTALLATION (Grease Duct perASTM E2336 and CAN/ULCS144) <br />Telescope Wrap. Option Butt Joint Option Checkerboard Wrap Option <br />SINGLE LAYER INSTALLATION OPTIONS (2-Hour rated HVAC Duct per UL HNLJ V-19) <br />LEGEND <br />1 <br />Two Layers of XL Insulation forASTM E2336 and CANAILC S144 Grease Duct Enclosures <br />One Layer of XL Insulation for 2-Hour Air Ventilation Duct Enclosures <br />2 <br />Steel banding minimum 1/2" 13 wide by 0.015" 0.4 thick. <br />3 <br />Tight bull joints (no overlap) at perimeter and longitudinal joints, both layers for grease ducts <br />4 <br />Min. 3" 75 overlap on perimeter and between adjacent blankets <br />5 <br />Optional 6" XL collar <br />6 <br />Hangers - size dependent weight of assembly see datasheet Section G <br />7 <br />Trapeze Supports - sizedependent on weight of assembly (see datasheet Section G) <br />8 <br />Steel Rectangular or Round Duct size., gage and construction dependent per Listed Desi n <br />The Integrity of Thermal �eamlrs ductsysems Isllmlted fo me quality N me Installation <br />XL001-to <br />www.morganthermaIceramics.com <br />12:2014 Page 5 of 8 <br />Commercial Kitchen Grease Duct Enclosure System <br />Air Ventilation Duct Enclosure System <br />Through Penetration Firestop Systems <br />XL Insulation continuous through rated wall assembly <br />XL insulation terminated on both sitles of the <br />rated wall assembly <br />XL Insulation continuous through rated Floor/ceiling assembly <br />XL insulation terminated at the top and botto <br />surface of the Floor/ceiling assembly <br />Firestop Designs per ASTM E814/ UL 1479 - Consult UL / ULC Directories for System Details <br />UL Listing <br />F- & T-Ratio <br />1 Floor/Wall <br />2 Penetrant <br />3 Enclosure Per <br />4 Termination <br />5 Firestop Sealant Details <br />C-AJ-7012 <br />2-hour <br />Concrele/CMLI <br />84x24; 26 Ga Duct <br />V19: FRD3; 5, 18 <br />wrap through <br />1n in; STI; Tremco <br />C-AJ-7014 <br />3-hour <br />Cancrete/CMU <br />84x24; 26 Ga Duct <br />V2', <br />wrap through <br />1/2 in; STI; Tremco <br />C-AJ-7019 <br />1 or 2-hour <br />Concrete/CMU <br />84x24; 26 Ga Duct <br />V19; FRD3, 5, 18 <br />terminate at <br />1/4 in; STI; Tremco <br />C-AJ-7021 <br />2-hour <br />Concrete/CMU <br />49x24; 16 Ga Duct <br />G1B; FRD4; 7 <br />terminate at <br />1/4 in; STI; Tremco <br />C-AJ-7095 <br />2-hour <br />Concrete/CMU <br />39x39; 22 Ga Duct <br />V19; FRD3, 5, 18 <br />wrap through <br />1/4 in; STI Hill; Rectorseal; Tremco <br />C-AJ-7098 <br />2-hour <br />Cancrete/CMU <br />49x24; 16 Ga Duct <br />G1B; FRD4; 7 <br />wrap through <br />1/4 in; STI; Hilti; Rectorseal; Tremco <br />F-C-7036 <br />1 or 2-hour <br />Wood/Gyp Floor <br />24x12; 16 Ga Duct <br />G1B; FRD4; 7 <br />wrap through <br />1/4 in; STI; Hill; Rectorseal; Tremco <br />F-C-7055 <br />1-hour <br />VikodiGyp Floor <br />4 Dla; 30 Ga Duct <br />V29; Iii <br />wrap through <br />1/4 In; STI <br />W-J-7086 <br />2-hour <br />Cancrete/CMU Wall <br />100100; 26 Ga Duct <br />V19; FRD3;5; 18 <br />terminate at <br />1/4 in; STI <br />W-L-7121 <br />1 or 2-hour <br />Wall <br />30116 Ga Duct <br />G1B; FRD4; 7 <br />wrapthrough <br />1/4 in; STI; Hilti; Rectorseal; Tremco <br />W-L-7145 <br />1 or 2-hour <br />Wall <br />I 100126Ga Duct <br />I V19; FRD3; 5; 18 <br />1 terminate at <br />5/8 in; STI <br />The integrity of marmal Ceramics dud systems is im11ed,"the quality oithe installation. <br />,tno35 <br />www.morganthermaIceramics.com <br />13 2014 Page of 8 <br />General <br />Cut edges of the blanket shall be taped with aluminum foil <br />tape to prevent exposed edges Of the insulation absorbing <br />grease and moisture in the event of a compromised grease <br />duct joint or condensation. Overlaps and/or tightly butted <br />joints are used to block heat transfer in the event of duct <br />deformation resulting from thermal expansion. Filament <br />tape is suggested to hold the blanket in place until steel <br />banding or pinning is installed to permanently secure the <br />blanket. <br />A. Installation on Grease Duct per ASTM E2336 and <br />CANMLC S144 (Figure 1) <br />System requires two layers of insulation applied directly to <br />the duct with tight butt joints at all seams on both layers. <br />The first layer of insulation is cut to a length sufficient to <br />wraparound the duct and provide a tight butt oint where <br />p 9 1 <br />the blanket ends meet. layer <br />Adjacent blankets on the first la <br />1 Y <br />are butted tightly together with longitudinal seams offset <br />9 Y o9 9 <br />minimum 6" The second ) 150mm . layer of insulation is <br />( <br />installed in the same method as the first layer, with seams <br />between layers offset a minimum of 6" (150mm). Banding <br />and/or pinning per Section D is used to permanently <br />secure the insulation to the duct. <br />B. Installation on HVAC Duct per ISO 6944 (Figure 1) <br />System requires one layer of insulation applied directly to <br />the duct with 3" (75mm) overlaps at all seams. The <br />insulation is cut to a length sufficient to wrap around the <br />duct and provide a 3" (75mm) overlap where the blanket <br />ends meet. Adjacent blankets are installed to provide a <br />minimum overlap of 3" (75mm). Banding and/or pinning per <br />Section D is used to permanently secure the insulation to <br />the duct. <br />C. 2 & 3 Sided Wrap Installation (Figure 4) <br />When space does not allow for a complete wrap applied to <br />the duct on all four sides, the FastWrap XL is approved for 2 <br />Or 3 sided installations with mechanical attachment to a rated <br />concrete or CMU assembly. (See Figure 4 for installation <br />details.) <br />D. Mechanical Attachment Methods <br />1) Banding (Figure 1)- Minimum 1/2" (13mm) wide <br />carbon steel Or stainless steel banding, 0.015" (0.4mm) <br />thick is placed around the entire perimeter of the <br />insulated duct on maximum 10-1/2" (270mm) centers <br />and 1-1/2" (38mm) from each blanket edge or 1-1/2" <br />(38mm) from each collar edge when using the butt joint <br />U Morgan <br />CAdvanced Materials <br />and collar method. The banding is placed around the <br />blanket and tightened to firmly hold the FastWrap XL in <br />place against the duct, but not cause any cutting or <br />damage to the blanket. <br />2) Pinning - Pinning on all sides of the duct may be used <br />as an alternative to banding. For ducts wider than 24" <br />(610mm) pinning is required on the bottom of horizontal <br />runs, or on one side of vertical runs (in addition to steel <br />banding). When applicable, 12 Gage (0.4mm) steel pins <br />are installed on 12" (305mm) centers along: the width of <br />the duct and 10-1/2" (270mm) centers along the length <br />of the duct. Pins that extend beyond the outer blanket <br />layer shall be turned down or the excessive length cut <br />off to prevent sharp edges. Shoot through pins (cup <br />head pins) may be used in conjunction with steel <br />banding to prevent blanket sag. <br />E. Access Doors <br />M <br />1 FastDoor XL (Figure 3 - FastDoor XL is a UL Listed <br />) ( 9 ) , <br />liquid tight duct cover panel supplied complete with a <br />single layer insulation cover per UL Listing HNKT G18. <br />The FastDoor XL is installed per included installation <br />instructions. No field welding is required. <br />2 Field Fabricated Access Doors - Each access door <br />assembly has four threaded rods 1/4 inch (6mm) in <br />diameter and 5" (127mm) in length, with one welded to <br />each corner of the door opening. Hollow steel tubes, <br />4-1/2" (114mm) long are installed outside the access <br />cover plate and over the threaded rods. Four 12 gage <br />(3mm) and 4-1/2" (114mm) long steel insulation pins are <br />welded to the access cover plate to allow for installation <br />of the three layers of FastWrap XL. One layer of <br />FastWrap XL is cut to approximately the same size as <br />the access panel, and impaled over the insulation pins <br />on the panel. A second layer of FastWrap XL is cut so <br />as to Overlap the first layer a minimum of 1-1/2" (38mm). <br />It is essential that the first and second layer fit tightly <br />against the surrounding wrap with no through openings. <br />The third and outside layer should be cut to overlap the <br />second insulation layer by minimum of 1-1/2" (38mm). <br />Minimum 1-1/2" (38mm) round or square insulation clips <br />are installed on the insulation pins to secure the three <br />layers of insulation to the access cover plate. All cut <br />edges of the insulation shall be taped with minimum 3" <br />(75mm) wide aluminum foil tape. Wing nuts and <br />washers are installed on the four threaded rods, and <br />tightened against the hollow steel tubes to seal the <br />www.morganthermalceramics.com <br />4 <br />ASTM E 2336 Compliant Enclosure and Door System <br />FIGURE 3 <br />1 <br />UL listed FastDoor XL accesspanel <br />2 <br />All Thread Rods and wing nuts <br />3 <br />Retainer Clips with threaded nut and wing bolts <br />4 <br />Insulation layers as required by UL or ITS Listings <br />5 <br />FastDoor XL; 1-12 inch thick single layer insulation <br />12:2014 Page 3 of 8 <br />F/R"MR <br />FastDoor XL1 Access Doors Sizes <br />Available Opening Sizes <br />Ordering Code <br />10" x 4" Door Opening <br />*434-6970-033-99X1 <br />10" x 6" Door Opening <br />434-6970-034-99X1 <br />12" x 8" Door Opening <br />434-6970-035-99X1 <br />12" x 12" Door Opening <br />434-6970-036-99X1 <br />16" x 12" Door Opening - <br />434-6970-037-99X1 <br />20" x 20" Door Opening <br />434-6970-038-99X1 <br />*Special Order; Curved and SS Available <br />www.morganthermaIceramics.com <br />12 2014 Page 7:of 8 <br />access cover plate to the duct. <br />F. Through Penetration Firestop System (Figure 2) - <br />When the duct penetrates a fire rated assembly an <br />approved fire stop system must be employed. Figure 2 <br />provides a complete list of UL / ULC firestop design <br />listings which can be found in the Certifications Directory <br />at vwAM.ul.com for US systems and www.ulc.ca for <br />Canadian systems. Prior to installing any firestop system <br />the surfaces of all openings and penetrating items must <br />be clean and dry. The FastWrap XL core blanket (or <br />mineral wool where allowed b the firestop design listing) <br />Y p 9 9) <br />must be compressed into the annular space. The <br />packing material must be recessed a minimum depth <br />from the surface of the concrete or gypsum assembly. <br />The recessed opening must be filled with a minimum <br />thickness of an approved firestop sealant. The packing <br />material type and compression, minimum recess <br />p <br />(typically 1/4" 6mm and approved firestop sealant and <br />(21'p Y ( )) pP p <br />thickness(typically 1/4" (6mml shall be asspecified in an <br />approved UL / ULC firestop design listing. When there <br />pp p 9 9 <br />is not sufficient annular space around the duct to run the <br />FastWrap XL enclosure system continuous through the <br />fire rated assembly, the enclosure may terminate above <br />and belowthefloor/ceilin9 Y assembl or On either side Of <br />a wall assembly as shown in Figure 2. When this method <br />is used, the FastWrap XL must be mechanically attached <br />on either side of the fire rated assembly using one of the <br />attachment methods described in Section D, spaced a <br />maximum of 1-1/2" (38mm) from the fire rated assembly. <br />G. Support Hanger Systems <br />1) Grease ducts: Trapeze support hangers shall be <br />spaced on maximum 60 in. (1500 mm) centers. Hanger <br />rods or straps shall be anchored with steel drop in or <br />wedge expansion type masonry anchors. No additional <br />protection is required for hangers and supports meeting <br />the requirements of the Table below. <br />Hanger Cross <br />Maximum <br />Trapeze Support (or <br />Section <br />Perimeter, in (mm) <br />equivalent Yield Strength), <br />n ford <br />38 in (10 com) <br />threaded rod <br />148 (3759) <br />2 (51) x 2 (51) x 1.8 (3) in angle <br />2) HVAC ducts: Trapeze support hangers shall be spaced <br />on maximum 60 in. (1500 mm) centers. Hanger rods or <br />straps shall be anchored with steel drop in or wedge <br />expansion type masonry anchors. No additional <br />U Morgan <br />CAdvanced Materials <br />F/R"M <br />protection is required for hangers and supports meeting <br />the requirements of the Table below. <br />Max.M Perimeter, <br />Trapeze Support (or <br />Hanger Cross Section <br />in (ford) <br />equivalent Yield Strength), <br />n (mm) <br />1 in x 16 gage strap <br />100 (2540) <br />(25 com x 1.5 gage strap) <br />Ain (6 man) threaded rod <br />50 (1270) <br />1 H (38) X 134 (38} x 3a 6 (5) <br />angle <br />38 in (10 mural threaded <br />150(3810) <br />1&(38) x 1Ye(38) x 316(5) <br />rod <br />angle <br />12 in (12.7 com) threaded <br />218 (5540) <br />2 (51) x 2 (51) x 14 (6) angle <br />no, <br />9. Maintenance and Repair <br />No maintenance is required when installed in accordance <br />with Thermal Ceramics (TC) C installation instructions. If <br />damage is limited to the foil facing, aluminum foil tape can <br />9 9, p <br />be used to repair the foil facing. If an area Of blanket is <br />p 9 <br />found to be damaged the following procedure must be in- <br />corporated. If the damaged area is larger than 8" (203mm) <br />x 8" (203mm) the entire wrap section must be removed and <br />replaced according to TC installation <br />p 9 <br />instructions. If the damaged area is small less than 8" <br />(203mm) x 8" (203mm)), the damaged area must be cut <br />away and replaced with a new section 1" (25mm) larger in <br />length and width than the cut out, such that the new section <br />can be compressed tightly into the cut out area. All cut <br />edges of the new section must be taped and sealed with <br />aluminum foil tape. The new section must be held in place <br />with either pinning or banding per TC installation i <br />restructions. <br />10. Limitations <br />Thermal Ceramics FireMaster FastWrap XL shall be <br />installed in accordance with these installation <br />instructions and appropriate laboratory design listings. The <br />integrity of FastWrap XL systems is limited to the quality of <br />the installation. <br />* For personal protective equipment recommendations, please see SDS. <br />Thermal Ceramics, FireMaster, and FastWrap are trademarks of <br />Morgan Advanced Materials. FireMaster products are manufactured by <br />Thermal Ceramics and are distributed by aulhorized distributors. <br />www.morganthermalceramics.com <br />FireMaster® FastWrap° X N <br />12:2014 Page:4 of 8 <br />F/RF gM <br />Commercial Kitchen Grease Duct Enclosure System <br />Air Ventilation Duct Enclosure System <br />1 Or 2 Or 3 Hour Shaft Alternative / Zero Clearance to Combustibles <br />2 and 3 Sided Wrap Detail forAttaching to Walls and/or Ceilings <br />XL005-4 <br />Note: Ducts must be independently supported per code <br />LEGEND <br />1 <br />Rated Concrete floor/ceiling,. or wall - with rating equal or greater than enclosure rating <br />2 <br />Two layers: of XL Insulation for Grease Dud Enclosures (install per UL G18)) <br />One layer of XL Insulation for Air Ventilation Dud Enclosures (install per UL V19) <br />Two layers of XL Insulation for 3-hrAir Ventilation Duct Enclosure (install per UL V2) <br />3 <br />Concrete fastener system <br />4 <br />3/16" (5) thick x 2" (50) -3" (75) wide bar stock. perforated 12" (305) o.c. <br />5 <br />8" (203) maximum Air Gap <br />6 <br />Dud <br />7 <br />Steel banding min. 112" (13) wide by 0.015" (0,4) thick. <br />8 <br />Banding clip <br />The integrity of Morgan Thermal Ceramics duct systems is limited to the quality of meinstallation- <br />www.morganthermaIceramics.com <br />12:2014. Page 8 of 8 <br />903121 STAVE SW <br />SEATTLE, WA 98106 <br />TEL. 206.322.4323 <br />FAX. 206.322.9177 <br />E-MAIL:INFO@CATCHSTUDIO.COM <br />WWW.CATCHSTUDIO.COM <br />PROJECT TITLE: <br />MOCHINUT <br />EVERETT <br />8417 EVERGREEN WAY <br />EVERETT, WA 98208 <br />SHEET TITLE: <br />SPECSHEET <br />PERMIT: <br />DATE: <br />CATCH DESIGN STUDIO <br />DRAWN: NOS NARIN <br />SCALE: AS NOTED <br />NATIVE FILE: <br />DATE: 01/05/2024 <br />SHEET# <br />MK7 <br />