My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/04/30 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/04/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 3:20:27 PM
Creation date
4/30/2025 3:19:18 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/30/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
~ 8-12 weeks*see attached <br />CUST23-38 $ 153,000.00 <br />$ 4,799.00 <br />$ 76,500.00 <br />7,290 Square Feet $ 26.50 $ 193,185.00 <br />6,168 Square Feet $ 8.15 $ 50,269.20 <br />$ 24,960.00 <br />229 cubic yards $ 22,774.05 <br />$ (31,529.24) <br /> Sub Total $ 493,958.02 <br /> Freight $ 12,510.33 <br /> Tax 9.9%$ 50,140.37 <br /> Sub Total $ 556,608.71 <br /> Bond $ 16,698.26 <br />Tax on Bond $ 1,653.13 <br /> Total $ 574,960.10 <br />Based on Materials Required <br />Adam Basich 206.932.6366April 10, 2025 <br />Playground Equipment Package CUST23-38 Composite and Freestanding <br />Playground Equipment per attached Equipment List. Manufactured by <br />Landscape Structures in Delano, MN' <br />PLAY EQUIPMENT <br />ForeverLawn Playground Grass Ultra 2" PlayPadPro Envirofill Infill per product <br />specifications. Composite edge nailer. All associated and required items (seaming <br />tape, etc.) includes installing, cutting, seaming and edging. <br />Installation of Playground Equipment Package CUST23-38 Composite and <br />Freestanding Playground Swing Equipment by Locally Based certified and <br />factory trained installation crew <br />INSTALLATION <br />SAFETY SURFACING <br />Supply & Install Compacted Crushed Rock Base Surface 7-1/2" depth as sub-base <br />for unitary surfacing <br />SITEWORK/DEMOLITION <br />Demolition and Disposal of all existing Play Equipment- 6 Post Swing Set, 3 Footer <br />Spring Balance Beam, Structure (32 Posts at $425 per + 32 footers at $355) <br />Demolition and Disposal of existing EWF approx 12" Depth, 229 cubic yards of <br />material at 99.45 per y³ <br />Playground Freestanding Swing Package including Single Post Direct Bury 52" <br />#177344, Single Post Additional Bay 52" #177345, x4 #174018 Belt Seats, x 1 Full <br />Bucket Seat for Toddler Swing #175038, and Toddler Swing Beam #177337 <br />Date Lead Time Terms <br />PlayCreation, Inc. attention: John <br />Larson 2104 SW 152nd Street, ste 1 Burien, WA 98166 JohnL@PlayCreation.c <br />206.932.6366 <br />Landscape Structures, Inc. <br />attention: Misty Link 601 - 7th <br />Street South Delano, MN <br />55328-0198 <br />mistylink@playlsi.com <br />763.972.5591 <br />Send for processing to:Issue Purchase Order To: <br />APPROVAL <br />_______________________________________________ <br />signature <br />_______________________________________________ <br />date PO# <br />Lowell Park Playground <br />Quote / Worksheet #2409-12463-03-02 <br />To:City of Everett Parks & Facilities <br />802 E Mukilteo BlvdEverett, WA 98203 <br />Lolly Huggins| Capital Projects Coordinator LHuggins@everettwa.gov | 425.626.3605 <br />Project Location: <br />Lowell Park <br />4605 S. 3rd St. <br />Everett, WA 98203 <br />Concept <br />C.2 <br />Purchasing Contract Discount <br />KCDA Contract #22-315 <br />Quoted By <br />To Place Order : Sign Approval Line + Color Approval Sheet, then <br />• <br />•Pricing valid for 90 day•Quote based on current pricing
The URL can be used to link to this page
Your browser does not support the video tag.