Laserfiche WebLink
Exhibit 12, 1 of 10 <br /> WATERFRONT PLACE CENTRAL <br /> SEPA MITIGATION <br /> Where found in <br /> Element of the Environment Action Mitigation is SEPA Resp. Party Implementation <br /> And Mitigation Measure tied to Documents Time Frame <br /> Earth Resources:Mitigation Measures Designed into the Proposal and Other Construction of any SEPA Checklist Port of Everett During any <br /> Potential Mitigation Measures structural improvements or section B.1.h. or responsible construction <br /> any construction that can party doing the activity. <br /> • Development of comprehensive temporary erosion and control plan move soil. work/project Shoreline Permits, <br /> (TESCP)for master planned redevelopment of the site in compliance with and/or operating Building Permits, <br /> City of Everett and Ecology requirements the constructed <br /> Port BMPs to control erosion and sedimentation,potentially including but Public Works <br /> • proposal Permits,Federal and <br /> not limited to clearing limits,cover measures,perimeter protections,traffic elements <br /> area stabilization,sediment ponds,portable filter system,surface water Dept. of Ecology <br /> collection,and dust control Permits <br /> • Installation of a coordinated set of ground improvements on all required <br /> portions of the redeveloped site prior to construction of infrastructure and <br /> new buildings to minimize potential damage from a major seismic event <br /> • Inclusion of structural design components in all new buildings,consistent <br /> with City of Everett building code requirements,to minimize damage from <br /> a major seismic event <br />