Laserfiche WebLink
Exhibit 12, 2 of 10 <br /> Air Quality:Mitigation Measures Designed into the Proposal and Other All site redevelopment SEPA Checklist Port of Everett During any <br /> Potential Mitigation Measures construction activities and section B.2.c. or responsible construction activity <br /> long-term operations party doing the and during long- <br /> • Comply with PSCAA recommendations for managing construction dust related to the proposal work/project term operation of <br /> and US EPA and PSCAA regulations for handling potential airborne and/or operating the proposal. <br /> hazardous substances <br /> • the constructed Building permits. <br /> Pave construction access roads <br /> proposal <br /> • Use emission reducing equipment/practices for construction elements <br /> • Use car pooling or other trip reduction strategies for construction workers <br /> • Route and schedule construction trucks to reduce delays to traffic <br /> • Provide on-site transit access,enhanced pedestrian and bicycle circulation <br /> system and transportation management program(TMP)for project <br /> employees to reduce single occupant vehicle trips within and to the site <br /> • Use Port BMPs for control of dust,painting,sand blasting,and <br /> fuels/solvents in the new boatyard <br /> • Limit boatyard spray painting to licensed operators <br /> • Use of proposal's compact transit and pedestrian oriented,mixed use site <br /> design to promote non-personal vehicle forms of transportation to reduce <br /> greenhouse gas(GHG)and other air emissions <br /> • Low impact,sustainable design of the proposal to meet the equivalent of <br /> one of the recognized levels of LEED certification to reduce energy <br /> consumption and resulting GHG and other air emissions <br /> • Use of a menu of coordinated transportation and non-transportation <br /> mitigation strategies to reduce air and GHG emissions <br /> • Set higher elevations of first floors of all significant buildings in the <br /> proposal and other related design measures that provide additional <br /> protection from future increases in 100-year flood elevations that could <br /> impact the site <br />