Laserfiche WebLink
Exhibit 12, 10 of 10 <br /> Public Services and Utilities:Mitigation Measures Designed into the All site redevelopment SEPA Checklist Port of Everett PDO DA,Land <br /> Proposal and other Potential Mitigation Measures construction activities and Section B.15.b. or responsible division, Shoreline <br /> • Provision of well designed internal street system to facilitate efficient long-term land and party doing the permits. <br /> emergency services access to all parts of site shoreline use operations work/project <br /> • Provision of new,fully looped water distribution and fire hydrant system to related to the proposal and/or operating During any <br /> provide adequate fire flow the constructed <br /> construction activity <br /> • Removal or substantial renovation of all remaining older,non-current code proposal and during long- <br /> compliant buildings and major structures on the site elements <br /> term operation of <br /> • City of Everett zoning and building codes and payment of applicable the proposal. <br /> school impact mitigation and utility connection fees <br /> Building permits. <br /> • City of Everett zoning,building code and utility design and connection <br /> requirements <br /> • Payment of substantial new state and local property,leasehold,business <br /> and occupation and sales taxes during construction and operation of the <br /> project <br />