My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6814 with exhibits
>
Resolutions
>
Resolution 6814 with exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 11:45:16 AM
Creation date
6/13/2016 11:43:42 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
Resolution 6814 with exhibits
Date
1/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 12, 9 of 10 <br /> Transportation:Mitigation Measures Designed into the Proposal and other SEPA Checklist Port of Everett PDO DA,Land <br /> Potential Mitigation Measures All site Section B.14.h. or responsible division, Shoreline <br /> redevelopment construction party doing the permits. <br /> • City of Everett traffic mitigation ordinance fee payments for each project activities and long-term work/project <br /> element and/or operating land and shoreline use p g During any <br /> • Use of a coordinated set of mitigation measures based on the proposal's operations related to the the constructed <br /> form of compact,transit and pedestrian oriented,mixed use site p construction activity <br /> redevelopment with opportunities to live,work,obtain essential services Proposal proposal during long-term <br /> and recreate on a single site elements operation of the <br /> • Installation of traffic signal at 13th Street and West Marine View Drive proposal. <br /> • Lane improvements on Alverson Boulevard at West Marine View Drive Building permits. <br /> intersection <br /> • Provision of a parking management plan for all site uses to maximize <br /> efficient use of all of the proposal's parking facilities <br /> • Elimination of up to 18 existing driveways on West Marine View Drive <br /> • Elimination of remaining industrial use generated heavy vehicle traffic on <br /> weekdays <br /> • Provision of on-site transit access and layover ability <br /> • Provision of on-site enhanced pedestrian and bicycle circulation system <br /> • Provision of a transportation management program(TMP)for project <br /> employees <br /> • City of Everett zoning,building code and utility design and connection <br /> requirements <br /> • Provision of well designed internal street system to facilitate efficient <br /> emergency services access to all parts of site <br /> • Provision of new,fully looped water distribution and fire hydrant system to <br /> provide adequate fire flow <br /> • City of Everett zoning and building codes and payment of applicable <br /> school impact mitigation and utility connection fees <br /> • City of Everett zoning,building code and utility design and connection <br /> requirements <br /> • Payment of substantial new state and local property,leasehold,business <br /> and occupation and sales taxes during construction and operation of the <br /> project <br />
The URL can be used to link to this page
Your browser does not support the video tag.