Laserfiche WebLink
Exhibit A to Ordinance No. <br /> Central Waterfront Redevelopment Plan <br /> Kimberly-Clark is in the process of demolishing and removing most buildings and above grade <br /> structures from the site. Because Ecology recognizes the importance of timely redevelopment <br /> and use of the property, it has indicated that it strongly supports an approach that enables timely <br /> remediation and redevelopment of this prime waterfront property to proceed in a coordinated <br /> manner without delaying either essential purpose. Ecology has also indicated that it expects to <br /> reach an understanding among the agency, Kimberly-Clark and the successor owner(s) so that <br /> redevelopment and productive use of the site resumes while cleanup activities -- which can take <br /> several years -- proceeds on the basis of the Agreed Order. K-C anticipates that significant site <br /> disruption will occur only during relatively brief periods during the remediation process. This <br /> re-use plan assumes that the entire upland portion of the mill site will be usable for any permitted <br /> use allowed by this plan. This re-use plan does not attempt to project the time it may take to <br /> clean up the site or when redevelopment of the property is likely to begin. <br /> F. On-site Utilities <br /> The Port Gardner deepwater outfall pipeline (DWO) plus major stormwater, combined sewer <br /> overflow outfall lines are located on and adjacent to the Kimberly-Clark mill site. The City and <br /> Kimberly-Clark are in discussions to determine the ultimate disposition of these facilities. <br /> A 48 inch water transmission main served the paper mill, but since the mill has closed,this water <br /> supply has been shut off to the property. A future user of the site could take advantage of this <br /> water supply for a water-intensive use. In addition,the presence of the DWO may enable a <br /> future site user with significant effluent discharge requirements to access this valuable <br /> infrastructure. <br /> G. Description of Alternatives <br /> Based on public feedback, input from the economic analysis of viable uses, comments from the <br /> property owner's representative, and an analysis of existing comprehensive plan and shoreline <br /> master program policies, the City evaluated 4 land use alternatives. Each of the four land use <br /> alternatives assumed industrial or related uses. While there have been some public suggestions <br /> for non-industrial uses, the public process has led the City to conclude that the best long term <br /> interests of the community are served by continuing to use the M-2 zoned area primarily for <br /> industry and employment, with water-oriented commercial uses and public access encouraged, <br /> based on the following considerations: <br /> • nature of the public infrastructure that has been constructed to support industrial use <br /> • character of other water-dependent industrial and military uses in the immediate vicinity <br /> • economic analysis of viable uses provided by the City's consultant <br /> 9 <br />