My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1820 100TH PL SE PUGET SOUND HEARING Plans 2025-05-02
>
Address Records
>
100TH PL SE
>
1820
>
PUGET SOUND HEARING
>
Plans
>
1820 100TH PL SE PUGET SOUND HEARING Plans 2025-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2025 10:20:41 AM
Creation date
5/2/2025 10:20:07 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH PL SE
Street Number
1820
Tenant Name
PUGET SOUND HEARING
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M .� <br /> Pa <br /> ! Anchor Bolts <br /> • Contractor to install %" x 8" Strong Bolt 2 (wedge anchor bolt)with Simpson BP %washer piate, per <br /> plan of repair recommendations <br /> • Anchor bolts to be installed only in areas where the wall has been damaged and the drywall is to be <br /> removed <br /> • Anchor bolts to be installed at 36" o-c <br /> Not Included in Contract <br /> • Restoration of lost elevation of the roof framing structure. Any significant deffection of the roof <br /> structure will be documented and addressed as an Additional Work Request. Currently no such work <br /> is anticipated. Leveling and/or repair of existing walls, floors, roof and ceitings. Contractor assumes all <br /> existing undamaged walls, floor and ceiling lines are plumb and level and free from damage (i.e. dry- <br /> rot, insect infestation, etc.) If any leveling and/or repair work for walls, floors, roof and ceilings is <br /> necessary, costs will be detailed and presented as a change order after demolition is complete and <br /> problems can viewed and be assessed. <br /> • Additional work requirements imposed by the City of Everett <br /> • Replacing damaged roof sheathing and/or installation of new roof sheathing <br /> 503 - SIDING <br /> Scope of Work <br /> Contractor to provide and replace siding on East face in same configuration as existing in areas outlined in <br /> the Demolition Plan. <br /> • Install 30-pound building paper <br /> • Install flashing, configuration to be similar to existing <br /> • Install wood siding to match, as close as possible existing material and profile, in areas where shown <br /> on Demolition Plan View <br /> • Unaffected siding will remain <br /> • Corner details to match existing corner details <br /> • Install metal flashing as necessary and similar to existing <br /> • Apply caulking in areas where repaired as required for painting <br /> 504- DOWNSPOUTS <br /> Scope of Work <br /> • Replace downspouts where damaged (profile to match existing) <br /> Not Included in Contract <br /> • Gutter system <br /> 505 - INSULATION <br /> Scope of Work <br /> • Provide and install insulation in exterior East walls in the affected areas of framing <br /> • Insulation in exterior walls will be fiberglass batt <br /> . Install insulation in attic insulation in the affected areas of drywall removal <br /> • Insulation in attic will be fiberglass batt <br /> • R value of installed insulation will be in accordance with current Building and Energy Code <br /> Not Included in Contract <br /> • Crawlspace insulation <br /> • Interior wall insulation <br /> . � � � <br /> , Owner's Initials / U <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.