My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1820 100TH PL SE PUGET SOUND HEARING Plans 2025-05-02
>
Address Records
>
100TH PL SE
>
1820
>
PUGET SOUND HEARING
>
Plans
>
1820 100TH PL SE PUGET SOUND HEARING Plans 2025-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2025 10:20:41 AM
Creation date
5/2/2025 10:20:07 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH PL SE
Street Number
1820
Tenant Name
PUGET SOUND HEARING
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b <br /> • `��^ <br /> 107- DUST CONTROL/DEMOLITION PROTECTION <br /> Scoae of Work <br /> • Carpet mask: Required on ail exposed carpets from the affected area to the front entrance door <br /> • Cover any air ducts in work areas <br /> • Keep doors to work areas closed, as much as possible <br /> • Instail zipper wall to block off reception deck and areas where no work is to be performed <br /> • Plywood or OSB sheathing to temporary secure window openings <br /> 108- SITE CLEANUP <br /> Scope of Work <br /> • All construction debris will be removed from the job site. Work area will be left broom clean upon <br /> project completion <br /> 109 - DUMP RUN <br /> Scope of Work <br /> • All debris from demolition and construction will be removed to proper disposal site unless otherwise <br /> noted <br /> 110—WEATHER PROTECTION <br /> Scoae of Work <br /> • Contractor will install tarps/sheathing/building paper as necessary to protect building from weather as <br /> much as possible <br /> • Plywood or OSB sheathing to temporary secure window openings <br /> WOOD <br /> 401 - FRAMING <br /> Scope of Work <br /> Refer to attached plan of repair prepared by Mr. Basri Basri, PE, SE of Kenmore, WA(dated 01/16/2018). <br /> Provide and install the following: <br /> Framing <br /> • Contractor to install temporary shoring stud walls (installed on the interior)and remove, on an as <br /> needed basis on East face <br /> • Exterior Walls to be repaired and/or removed and replaced as needed, in affected areas per the Plan <br /> of Repair <br /> • Bottom plate—single 2x4 KD SPF in std & btr grade <br /> • Exterior walls -2x4 KD SPF in std & btr grade studs at 16" o/c. <br /> • Top plate—double 2x4 KD SPF in std & btr grade <br /> • Exterior wall plywood sheathing one side <br /> • Plywood sheathing thickness '/" <br /> • Nailing of wall sheathing will be: <br /> 8d-6 inch OC at edge <br /> 8d-12 inch OC in field <br /> • Window RO and locations will be same as existing <br /> . _� __ <br /> t � <br /> , Owner's Initia _ � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.