MECHANICAL SPECIFICATIONS
<br />MECHANICAL WORK, GENERAL
<br />A GENERAL REQUIREMENTS
<br />1. CONTRACT REQUIREMENTS: COMPLY WITH BIDDING AND CONTRACT REQUIREMENTS AS OUTLINED BY THE OWNER
<br />AND ARCHITECT.
<br />2. WORK INCLUDED: THIS SECTION APPLIES TO ALL MECHANICAL WORK NORMALLY SPECIFIED UNDER DIVISIONS 22
<br />AND 23. PROVIDE ALL MATERIALS, LABOR, EQUIPMENT, TOOLS, FIELD DESIGN, SHOP DRAWINGS, HOISTING, SCAFFOLDING,
<br />SUPERVISION AND OVERHEAD FOR THE CONSTRUCTION, INSTALLATION, CONNECTION, TESTING AND OPERATION OF ALL
<br />MECHANICAL WORK AS SHOWN AND SPECIFIED. THE WORD "PROVIDE" USED HEREINAFTER MEANS TO FURNISH AND
<br />INSTALL. ALL WORK AND MATERIALS REQUIRED FOR COMPLETE FUNCTIONING SYSTEMS ARE NOT OUTLINED HERE, BUT
<br />SHALL BE PROVIDED AS PART OF THIS WORK.
<br />3. CODES: COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES OF THE LOCAL AND STATE CODE ENFORCING
<br />AGENCIES. OBTAIN PERMITS, APPROVALS, AND INSPECTIONS, AND PAY ALL COSTS AND FEES FOR PERMITS, REVIEWS, AND
<br />INSPECTIONS.
<br />4. ABBREVIATIONS: WHERE ABBREVIATIONS ARE USED IN THE SPECIFICATIONS AND ON THE DRAWINGS, THE COMMON
<br />INDUSTRY DEFINITION SHALL APPLY UNLESS INDICATED OTHERWISE. THE TERM A/E SHALL REFER TO THE PROJECT
<br />ARCHITECT AND MECHANICAL CONSULTING ENGINEER AS IF ONE ORGANIZATION.
<br />5. SUBMITTALS: SUBMIT PRODUCT DATA AND SHOP DRAWINGS FOR ALL SIGNIFICANT MATERIALS, EQUIPMENT, AND
<br />FIXTURES TO THE A/E FOR REVIEW. ALLOW REASONABLE TIME FOR REVIEW AND RETURN PRIOR TO ORDERING. PDF
<br />(ELECTRONIC) SUBMITTALS AREA ACCEPTABLE, IF PAPER COPIES ARE SUBMITTED ASSUME OWNER AND A/E WILL RETAIN A
<br />TOTAL OF THREE COPIES OF SUBMITTALS.
<br />6. SAFETY MEASURES: PROVIDE A SAFE ENVIRONMENT TO PROTECT EMPLOYEES AND ALL OTHERS FROM INJURY.
<br />COMPLY WITH LOCAL, STATE AND FEDERAL SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION.
<br />B. PERFORMANCE OF WORK
<br />1. COORDINATION: COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES AND TAKE ALL MEASUREMENTS
<br />NECESSARY TO ENSURE PROPER INSTALLATION OF MECHANICAL WORK PRIOR TO START OF FABRICATION. THIS
<br />CONTRACTOR SHALL CREATE BUILDING INFORMATION MODELS (BIM) AND/OR LARGE-SCALE DETAIL DRAWINGS WHERE
<br />NECESSARY TO COORDINATE WORK IN TIGHT AREAS. THE CONTRACT DRAWINGS DO NOT ATTEMPT TO SHOW EXACT
<br />LOCATIONS OF DUCTWORK, PIPING, FIXTURES, AND EQUIPMENT, OR ALL TRANSITIONS AND OFFSETS THAT WILL BE
<br />NECESSARY FOR INSTALLATION. ALL NECESSARY TRANSITIONS AND OFFSETS SHALL BE PROVIDED AS PART OF THIS WORK
<br />WITHOUT ADDED COMPENSATION.
<br />2. CONTINUITY OF SERVICE: ANY SYSTEMS OR SERVICES WITHIN EXISTING OCCUPIED BUILDINGS SHALL BE MAINTAINED
<br />WITH MINIMUM INTERRUPTION. COORDINATE ANY NEEDED INTERRUPTIONS WITH THE OWNER. ANY OVERTIME WORK
<br />REQUIRED BY THIS PROJECT TO MAINTAIN EXISTING BUILDINGS IN CONTINUOUS SERVICE, WITHOUT REDUCING THEIR
<br />EFFICIENCY, SHALL BE INCLUDED AS A PART OF THIS CONTRACT.
<br />3. DEMOLITION: PROVIDE MECHANICAL SYSTEM DEMOLITION IN AREAS OF EXISTING BUILDINGS TO ACCOMMODATE
<br />INSTALLATION OF NEW WORK. EXISTING PIPING, VALVES, AND DUCTWORK, WHERE INDICATED ON THE DRAWINGS, MAY BE
<br />REUSED IN THEIR ORIGINAL LOCATION. DO NOT REUSE EXISTING PIPING, VALVES, OR DUCTWORK ONCE THEY ARE
<br />REMOVED, UNLESS WRITTEN PERMISSION IS OBTAINED FROM OWNER. REMOVE ALL UNUSED PIPING AND DUCTWORK
<br />LOCATED IN REMODEL AREAS OF EXISTING BUILDINGS.
<br />4. CUTTING AND PATCHING: PROVIDE ALL CUTTING OF BUILDING CONSTRUCTION, AS REQUIRED FOR THIS WORK. KEEP
<br />CUTTING TO A MINIMUM, AND USE SAW CUTTING TO MAINTAIN NEAT, EVEN OPENINGS. UNLESS PATCHING IS INCLUDED
<br />UNDER OTHER DIVISIONS OF THIS SPECIFICATION, PROVIDE PATCHING AT ALL CUTTING LOCATIONS. ALL PATCHING SHALL
<br />CONFORM TO SPECIFICATIONS FOR THE NEW GENERAL CONSTRUCTION WORK. FINISH TO MATCH EXISTING WORK .
<br />C. PROJECT COMPLETION
<br />1. RECORD DRAWINGS (AS-BUILTS): CORRECTIONS AND CHANGES MADE DURING THE PROGRESS OF THE WORK
<br />SWILL BE NEATLY RECORDED AS ACTUALLY INSTALLED FOR AS -BUILT RECORDS. FURNISH ONE CLEAN SET TO THE A/E
<br />UPON COMPLETION OF THE PROJECT.
<br />2. OPERATION AND MAINTENANCE MANUALS: PROVIDE (3) FINISHED COPIES OF MECHANICAL OPERATION AND
<br />MAINTENANCE MANUALS, FOR WORK UNDER THIS PROJECT. ARRANGE INFORMATION CONTAINED IN THE MANUALS IN AN
<br />ORDERLY ARRANGEMENT (BY SPECIFICATION SECTION), SEPARATED BY TABS. PROVIDE EQUIPMENT MANUFACTURER, MODEL
<br />NUMBER, SIZE, CAPACITY, PERFORMANCE DATA, SCHEDULE OF ROUTINE MAINTENANCE, SUPPLIERS LISTS, LIST OF
<br />REPLACEMENT PARTS, AND INCLUDE ANY SHOP DRAWINGS.
<br />3. OWNER INSTRUCTION: CONTRACTOR SHALL INSTRUCT THE OWNER IN THE USE AND OPERATION OF ALL SYSTEMS
<br />INSTALLED UNDER THIS CONTRACT. OBTAIN OWNER'S WRITTEN ACCEPTANCE THAT THEY HAVE BEEN ADEQUATELY TRAINED.
<br />4. GUARANTEE: GUARANTEE MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR AFTER THE DATE OF
<br />SUBSTANTIAL COMPLETION. REFER TO ADDITIONAL REQUIREMENTS OUTLINED BY ARCHITECT AND OWNER.
<br />BASIC MATERIALS AND METHODS (APPLIES TO ALL WORK)
<br />A GENERAL
<br />1. WORK INCLUDED: THIS SECTION APPLIES TO ALL MECHANICAL WORK NORMALLY SPECIFIED UNDER DIVISIONS 21,
<br />22 AND 23, AND REPRESENTS REQUIREMENTS IN ADDITION TO THE REQUIREMENTS STATED IN OTHER SECTIONS. THESE
<br />SPECIFICATIONS DO NOT COVER ALL ITEMS THAT WILL BE REQUIRED FOR COMPLETE AND WORKING SYSTEMS. WHERE
<br />MATERIALS OR EQUIPMENT NEEDED FOR THIS PROJECT ARE NOT COVERED IN THESE SPECIFICATIONS, PROVIDE THE
<br />MATERIALS AND EQUIPMENT OF A QUALITY EQUAL TO OR BETTER THAN THAT GENERALLY UTILIZED BY THE INDUSTRY FOR
<br />SIMILAR PROJECTS IN THE SAME GEOGRAPHIC AREA
<br />B. SUPPORT AND HANGERS
<br />1. SUPPORT OF MECHANICAL SYSTEMS: EACH PIECE OF EQUIPMENT SHALL BE SUPPORTED (FROM ABOVE OR BELOW)
<br />IN NOT LESS THAN FOUR CORNERS FROM THE BUILDING STRUCTURE. PIPING AND DUCTWORK SHALL BE SUPPORTED AT
<br />INTERVALS SPECIFIED, WITH EACH SYSTEM SUPPORTED INDEPENDENTLY FROM THE BUILDING STRUCTURE.
<br />2. SEISMIC BRACING: PROVIDE COMPLETE SEISMIC BRACING FOR ALL NEW PIPING, DUCTWORK, TERMINAL UNITS AND
<br />EQUIPMENT AS REQUIRED BY THE CURRENT IBC WITH ALL LOCAL AMENDMENTS AND ASCE/SCI 7-10 (THE CURRENT
<br />CODE). BRACING MAY BE PER GUIDELINES ESTABLISHED BY RESTRAINT MANUFACTURERS SUCH AS; MASON INDUSTRIES
<br />AND I.SAT PROVIDED THEY MEET THE CURRENT CODE. ALL BRACING SHALL BE DESIGNED AND MANUFACTURED BY
<br />MASON, I.SAT, OR PRIOR -APPROVED ALTERNATE.
<br />3. CONNECTIONS TO THE BUILDING STRUCTURE: PROVIDE ALL NECESSARY CONNECTIONS TO THE BUILDING STRUCTURE
<br />FOR SEISMIC RESTRAINTS AND SUPPORTS. WHERE CONCRETE STRUCTURE IS PRESENT, REVIEW THE USE OF CONCRETE
<br />ANCHORS WITH THE ARCHITECT, OWNER, AND GENERAL CONTRACTOR, AND VERIFY THAT THERE ARE NO POST -TENSIONED
<br />SLABS OR OTHER CONDITIONS THAT NEED TO BE TAKEN INTO ACCOUNT IN SETTING OF ANCHORS. UTILIZE MCCULLOUGH
<br />"KWIK-BOLT", PHIWPS SELF -DRILLING ANCHORS, GREGORY "BULLDOG," OMARK "DRILL ANCHORS", OR OTHER APPROVED
<br />ANCHOR TO ATTACH TO CONCRETE STRUCTURES. WHERE BUILDING STRUCTURE IS WOOD OR STEEL, OBTAIN ARCHITECT
<br />APPROVAL OF HARDWARE AND METHODS TO BE UTILIZED FOR ATTACHMENT TO THE STRUCTURE
<br />4. ADDITIONAL FRAMING: PROVIDE STEEL FRAMING MEMBERS TO TRANSFER LOAD FROM SUPPORT POINTS AT HANGERS
<br />TO LOCATIONS WHERE CONNECTIONS CAN BE MADE TO THE BUILDING STRUCTURE. FRAMING MEMBERS SHALL BE
<br />12-GAUGE MINIMUM, 1-3/8" X 1-5/8" MINIMUM CROSS-SECTION SIZE; UNISTRUT, POWERSTRUT, OR OTHER APPROVED.
<br />SELECT MEMBER SIZE AND TYPE, AS APPROPRIATE FOR LOAD PER MANUFACTURER GUIDELINES.
<br />5. PIPE HANGERS: CLEVIS OR RING HANGERS WITH STEEL RODS. HANGERS FOR INSULATED PIPING SHALL BE SIZED
<br />FOR OUTSIDE INSULATION AND 6" SHIELDS SHALL BE PROVIDED AT ALL HANGERS TO PROTECT INSULATION. PIPE SUPPORT
<br />SPACING PER IMC. PROVIDE PLASTIC SEPARATION BETWEEN CLAMPS AND COPPER PIPE
<br />6. HANGER RODS: HOT ROLLED STEEL ROD, ASTM A 36; SIZE TO "CODE FOR PRESSURE PIPING", ANSI B 31.1, WITH
<br />SAFETY FACTOR OF 5. MINIMUM ROD SIZE; 1" PIPE AND SMALLER (240 POUNDS) = 1/4" ROD, 1-1/4" TO 2" PIPE
<br />(TO 610 POUNDS) = 3/8" ROD, 2-1/2" TO 4" PIPE (TO 1,130 POUNDS) = 1/2" ROD, 5" TO 8" PIPE (TO 1'810
<br />POUNDS) = 5/8" ROD.
<br />7. INSTALL HIGH DENSITY PRE -MOLDED PIPE INSULATION 180 DEGREES (HALF -SHELLS) ON BOTTOM HALF OF PIPE
<br />AT SUPPORTS FOR PIPING GREATER THAN 1"IN DIAMETER, 6" LONG FOR PIPING WIN SIZE OR SMALLER. FOR COLD PIPE
<br />SUPPORTS USE 3.0 PCF DENSITY POLYISOCYANURATE INSULATION. HOT PIPE SUPPORTS SHALL BE HIGH DENSITY
<br />POLYISOCYANURATE FOR FLUIDS UP TO 300 F, OR CALCIUM SILICATE. INSULATION AT SUPPORTS SHALL HAVE SAME
<br />THICKNESS AS ADJACENT INSULATION.
<br />8. VIBRATION ISOLATION: VIBRATION ISOLATORS FOR HANGING EQUIPMENT SHALL BE EQUAL TO MASON INDUSTRIES
<br />MODEL 30N, COMBINATION SPRING AND DOUBLE DEFLECTION NEOPRENE HANGER, DEFLECTION AS RECOMMENDED BY
<br />MANUFACTURER. VIBRATION ISOLATORS FOR BASE MOUNTED EQUIPMENT SHALL BE EQUAL TO MASON INDUSTRIES MODEL
<br />SLF, DEFLECTION AS RECOMMENDED BY MANUFACTURER.
<br />C. EQUIPMENT AND PIPING IDENTIFICATION
<br />1. NAMEPLATES: PROVIDE NAMEPLATE FOR EACH PIECE OF EQUIPMENT, INCLUDING EQUIPMENT NUMBER AND ANY
<br />SPECIAL INSTRUCTION FOR ITS USE; LAMINATED BLACK AND WHITE PLASTIC WITH LETTERING CUT THROUGH TO WHITE
<br />BACKGROUND. MINIMUM SIZE 3" X 1".
<br />2. PIPE IDENTIFICATION: ALL PIPING IN SERVICEABLE LOCATIONS (INCLUDING ABOVE LAY -IN CEILINGS) SHALL BE
<br />IDENTIFIED WITH SEMI -RIGID PLASTIC OR ADHESIVE IDENTIFICATION MARKERS. MARKERS SHALL CONFORM TO ANSI A13.1,
<br />"SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS'. LOCATE MARKERS ADJACENT TO EACH VALVE, AT MINIMUM 30'
<br />CENTERS WITH AT LEAST ONE MARKER BETWEEN ANY TWO PARTITIONS. PROVIDE DIRECTION OF FLOW ARROWS AT
<br />MARKERS.
<br />D. MISCELLANEOUS MATERIALS AND ACCESSORIES
<br />1. DIELECTRIC UNIONS: PROVIDE AT EACH PIPE CONNECTION BETWEEN DISSIMILAR METALS. 2 INCHES AND SMALLER,
<br />250 PSIG AT 180 DEG. F., ANSI B16.39. OVER 2" USE FLANGE FITTINGS, ANSI 816.42 (IRON) OR ANSI 816.24
<br />(BRONZE), WATTS 3000 SERIES, EPCO OR EQUIVALENT.
<br />2. FIRE SEALING AT RATED WALLS AND FLOORS: PROVIDE UL LISTED FIRE RATED PUTTY AT ALL PIPE PENETRATIONS
<br />OF RATED WALLS AND FLOORS. PUTTY SHALL BE INSTALLED STRICTLY PER MANUFACTURER INSTRUCTIONS WITH SLEEVES
<br />WHERE REQUIRED. OVERALL INSTALLATION SHALL MEET CODE REQUIREMENTS. PIPE INSULATION SHALL NOT BE
<br />CONTINUOUS THROUGH FIRE RATED WALLS OR FLOORS.
<br />3. MOTORS: UNLESS OTHERWISE SPECIFIED, ALL ELECTRIC MOTORS FURNISHED SHALL CONFORM WITH THE
<br />REQUIREMENTS OF NEMA MG1 "MOTORS AND GENERATORS." PROVIDE MINIMUM MOTOR EFFICIENCIES AS REQUIRED BY
<br />THE ENERGY CODE.
<br />4. INTERCONNECTING WIRING: PROVIDE ANY NECESSARY INTERCONNECTING WIRING BETWEEN INDIVIDUAL COMPONENTS
<br />AND ACCESSORIES FURNISHED WITH MECHANICAL EQUIPMENT PACKAGES (UNLESS THAT WIRING IS SPECIFICALLY CALLED
<br />FOR ON THE ELECTRICAL DRAWINGS). WIRING AND WIRING ACCESSORIES SHALL BE IN ACCORDANCE WITH DIVISION 26
<br />SPECIFICATIONS (AND/OR THE SPECIFICATIONS ON THE ELECTRICAL DRAWINGS) AND LOCAL ELECTRICAL CODE. WIRING
<br />SHALL BE IN CONDUIT OR RACEWAY. WIRING SHALL BE PROVIDED AT THE EXPENSES OF THE SUBCONTRACTOR
<br />FURNISHING THE EQUIPMENT PACKAGE.
<br />E. EXECUTION OF WORK
<br />1. INSTALLATION, GENERAL FOLLOW MANUFACTURER'S INSTRUCTIONS AND UTILIZE GOOD INDUSTRY PRACTICE WHEN
<br />INSTAWNG ALL WORK. USE ONLY SKILLED TRADESPEOPLE WITH QUALIFIED SUPERVISION. ALL WORK SHALL BE LEFT
<br />NEAT AND CLEAN.
<br />2. CONCEALMENT: PIPING AND DUCTWORK SHALL BE CONCEALED WITHIN BUILDING CONSTRUCTION, UNLESS
<br />SPECIFICALLY INDICATED OTHERWISE. WHERE PIPING IS INDICATED TO BE EXPOSED TO VIEW IN FINISHED SPACES OR
<br />CABINETS, PROVIDE CHROME ESCUTCHEONS WHERE THE PIPING PENETRATES THE WALL, FLOOR OR CEILING CONSTRUCTION
<br />3. COORDINATION WITH OTHER TRADES: COMPLETE DRAWINGS AND SPECIFICATIONS OF ALL TRADES WILL BE
<br />FURNISHED OR WILL BE AVAILABLE FOR INSPECTION IN THE CONSTRUCTION OFFICE AT THE JOBSITE. CAREFULLY CHECK
<br />THESE DRAWINGS AND SPECIFICATIONS BEFORE INSTAWNG ANY WORK. IN ALL CASES, CONSIDER THE WORK OF ALL
<br />OTHER TRADES AND COORDINATE WORK WITH THAT OF THE SHEET METAL, PIPING, PLUMBING, ELECTRICAL, AND SITE -WORK
<br />SUBCONTRACTORS, SO THAT THE BEST ARRANGEMENT OF ALL EQUIPMENT, PIPING, CONDUIT, DUCTS, AND OTHER RELATED
<br />ITEMS CAN BE OBTAINED.
<br />MECHANICAL INSULATION
<br />A GENERAL
<br />1. MANUFACTURERS: MANVILLE, OWENS-CORNING, CERTAINTEED, OR KNAUF. INSTALL IN ACCORDANCE WITH
<br />MANUFACTURER'S INSTRUCTIONS.
<br />2. INSULATION THICKNESS: REFER TO INSULATION REQUIREMENTS ON THE DRAWINGS FOR SYSTEMS TO BE INSULATED
<br />AND THICKNESS OF INSULATION.
<br />B. INSULATION MATERIALS
<br />1. DUCT AND PLENUM INSULATION: FIBERGLASS, 0.75-POUND DENSITY, FLEXIBLE DUCT INSULATION WITH KRAFT
<br />VAPOR BARRIER. VAPOR BARRIER SHALL BE SEALED AT ALL JOINTS AND ACCESS DOORS, ETC. IN GENERAL,
<br />INSTALLATION MUST REFLECT CAREFUL WORKMANSHIP, NEAT IN APPEARANCE.
<br />AIR DISTRIBUTION
<br />A DUCTWORK AND ACCESSORIES
<br />1. DUCTWORK: DUCTWORK SHALL BE GALVANIZED STEEL, EXCEPT WHERE FLEXIBLE DUCT IS ALLOWED PER THIS
<br />SPECIFICATION. ALL DUCTWORK AND ACCESSORIES SHALL COMPLY WITH THE STANDARDS PRESENTED WITHIN THE MOST
<br />RECENT ISSUE OF SMACNA "WAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE" AND WITH THE REQUIREMENTS
<br />OF THIS SPECIFICATION (WHICHEVER IS MORE STRINGENT). LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS, AND
<br />CONNECTIONS OF ALL DUCT SYSTEMS SHALL BE SECURELY FASTENED AND SEALED WITH WELDS, GASKETS, MASTICS, OR
<br />TAPES IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND THE DRAWING NOTES.
<br />2. DUCT SEALING COMPOUND: BENJAMIN FOSTER TYPE 30_03, OR UNITED SHEET METAL MANUFACTURER ADHESIVE.
<br />3. DUCT LINER: ACOUSTICAL DUCT LINING SHALL BE 1-INCH THICK, UNLESS OTHERWISE NOTED, OWENS-CORNING
<br />AEROFLEX TYPE 300 COMPLYING WITH FIRE CLASSIFICATION REQUIREMENTS OF NFPA 90A AND 90B. ADHERE LINER TO
<br />DUCT WITH FIRE RESISTANT ADHESIVE AND WELDED PIN TYPE MECHANICAL FASTENERS AS INDICATED IN SMACNA
<br />STANDARDS. SEAL ALL EDGES.
<br />4. DUCT INSULATION: WRAPPED DUCTWORK INSULATION SHALL BE 0.75 LB./CU FT, 1-1/2-INCH-THICK GLASS FIBER
<br />WITH LAMINATED KRAFT-FOIL VAPOR BARRIER COMPLYING WITH FIRE CLASSIFICATION REQUIREMENTS OF NFPA 90 AND 90B.
<br />REFER TO THE CURRENT ENERGY CODE FOR SPECIFIC INSULATION AS APPLICABLE.
<br />5. FLEXIBLE DUCTS: ACCEPTABLE ONLY WHERE INDICATED ON THE DRAWINGS. EXTERIOR REINFORCED LAMINATED
<br />VAPOR BARRIER, 2.0-INCH THICK FIBER GLASS INSULATION (K = .25 AT 75 DEGREES F.), ENCAPSULATED SPRING STEEL
<br />WIRE HELIX AND IMPERVIOUS, SMOOTH, NON -PERFORATED INTERIOR VINYL LINER. UL 181 LISTED WITH FLAME -SPREAD
<br />RATING NOT OVER 25, SMOKE -DEVELOPED RATING NOT OVER 50. MINIMUM LENGTH 6', MAXIMUM LENGTH 8% MINIMUM
<br />OF 1 ELBOW, NOT GREATER THAN 2 ELBOWS. USE FLEXMASTER USA TYPE 8M, R-6.0.
<br />6. FLEXIBLE CONNECTORS: PROVIDE FLEXIBLE CONNECTORS AT FANS AND EQUIPMENT THAT DO NOT HAVE INTERNAL
<br />VIBRATION ISOLATION. INDOOR: UL LISTED HYPOLON COATED GLASS FABRIC OR NEOPRENE COATED NYLON FABRIC.
<br />FLAME RESISTANT TO 250 F. 24 OZ / SQ. YD. DURODYNE "NEOPRENE" OR ELGEN "HYPOLON".
<br />7. DUCT ACCESS DOORS: PROVIDE IN SUFFICIENT QUANTITY, LOCATIONS, AND SIZES TO PROVIDE PROPER ACCESS TO
<br />DAMPERS AND EQUIPMENT THAT MAY REQUIRE SERVICE. VENTLOCK WITH PIANO HINGE AND/OR CAM LATCHES. SUPPLY
<br />DUCT ACCESS DOORS SHALL BE DOUBLE WALL, WITH 1" INSULATION.
<br />8. VOLUME DAMPERS: BALANCING DAMPERS SHALL BE PER SMACNA STANDARDS. HEAVY DUTY QUADRANTS WITH
<br />SETTING SCALE AND SECURE LOCKING THUMB NUTS.
<br />9. FIRE DAMPERS: 1-1/2 HOUR RATED, DYNAMIC, UL LISTED FIRE DAMPERS, EACH WITH FRAME AND SLEEVE, LISTED
<br />FOR VERTICAL AND/OR HORIZONTAL INSTALLATION, WITH FUSIBLE LINK RATED TO CLOSE AT 165 F. OVERSIZE DAMPERS
<br />AS REQUIRED TO RESULT IN NOT LESS THAN 85 PERCENT FREE AREA FOR LOW VELOCITY DUCTS AND 100 PERCENT
<br />FREE AREA FOR MEDIUM OR HIGH VELOCITY DUCTS. INSTALL PER MANUFACTURER INSTRUCTIONS.
<br />10. COMBINATION FIRE SMOKE DAMPERS: DAMPERS SHALL BE UL 555 1-1/2 HOUR AND UL 5555 CLASS I LEAKAGE
<br />CLASSIFIED. DAMPERS SHALL HAVE A NORMALLY -CLOSED 120 VOLT DAMPER MOTOR AND REUSABLE RESETTABLE LINK
<br />CLOSURE DEVICE RATED TO CLOSE AT 165 F. IF A FIRE ALARM SYSTEM IS NOT PRESENT, PROVIDE AS PART OF THE
<br />DAMPER PACKAGE A UL LISTED DUCT -MOUNTED SMOKE DETECTOR LOCATED JUST UPSTREAM OF THE DAMPER, ALONG
<br />WITH FIELD WIRING TO THE DAMPER MOTOR AND ALL ACCESSORIES TO CLOSE THE DAMPER ON DETECTION OF SMOKE.
<br />SMOKE DETECTOR SHALL BE SIMPLEX WITH AUX. CONTACTS RATED FOR 120 VAC, AND SHALL INCLUDE A
<br />CEILING -MOUNTED ANNUNCIATOR LIGHT MOUNTED BELOW THE DAMPER.
<br />B. DIFFUSERS AND GRILLES
<br />1. GENERAL PROVIDE ALL DIFFUSERS AND GRILLES CONSISTENT WITH THE PERFORMANCE, MANUFACTURER, MODEL
<br />NUMBER, AND ACCESSORIES, AS SPECIFIED OR INDICATED ON THE DRAWING SCHEDULES AND NOTES. GRD SUPPLIERS
<br />SHALL VERIFY THAT MODEL NUMBERS ARE CONSISTENT WITH CAPACITY, FEATURES, AND ACCESSORIES CALLED FOR, AND
<br />IDENTIFY ANY CONFLICTS PRIOR TO SUBMITTING QUOTATIONS TO CONTRACTORS. ALTERNATE MANUFACTURERS WILL BE
<br />CONSIDERED; HOWEVER, A/E FINAL APPROVAL OF EQUALITY OF ALTERNATE MANUFACTURER MODELS IS REQUIRED.
<br />ACCEPTABLE ALTERNATE MANUFACTURERS INCLUDE ANEMOSTAT, CARNES, JBAJ, KRUEGER, PRICE, SHOEMAKER, AND TITUS,
<br />OR AS INDICATED OR PRIOR -APPROVED OTHERWISE. ALTERNATE MANUFACTURERS WITH PRIOR APPROVAL ARE STILL
<br />RESPONSIBLE FOR MEETING OR EXCEEDING THE QUALITY AND FEATURES OF THE SPECIFIED ITEMS.
<br />2. DIFFUSER AND GRILLE FRAMES AND COLOR: OFF-WHITE COLOR TO MATCH CEILING GRID. REFER TO
<br />GENERAL HVAC NOTES
<br />ARCHITECTURAL DRAWINGS AND PROVIDE FRAME STYLE TO SUIT CEILING TYPE (LAY -IN, PLASTER, EFC.). WHERE INSTALLED
<br />IN HARD CEILINGS, PROVIDE OPPOSED BLADE DAMPER ADJUSTABLE FROM BELOW. CEILING GRILLES SHALL BE INSTALLED
<br />1 SHEET METAL DUCTWORK AND COMPONENTS INCLUDING HANGING, SEALING, PLENUMS, & ACCESSORIES
<br />SUCH THAT BLADE OPENINGS FACE TOWARD NEAREST WALL TO LIMIT SIGHT INTO DUCT OR PLENUM.
<br />SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE LATEST EDITION OF SMACNA STANDARDS
<br />3. WALL GRILLES: SINGLE DEFLECTION FOR RETURN AND EXHAUST, ADJUSTABLE DOUBLE DEFLECTION FOR SUPPLY
<br />FOR WAC DUCT CONSTRUCTION, NFPA 90A, & 90B STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28"
<br />(UNLESS NOTED OTHERWISE.) REFER TO DRAWING NOTES AND SCHEDULES FOR MORE INFORMATION. PROVIDE OPPOSED
<br />DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM.
<br />BLADE DAMPERS WHERE "REGISTERS" ARE INDICATED. EXPOSED (FRONT) BLADES SHALL BE HORIZONTAL (UNLESS NOTED
<br />2, PROVIDE EARTHQUAKE RESTRAINT FOR WAG EQUIPMENT IN ACCORDANCE WITH THE CURRENT IBC
<br />OTHERWISE).
<br />1613.
<br />C. AIR HANDLING EQUIPMENT
<br />3. ALL DUCTWORK OPENINGS SHALL BE COVERED DURING CONSTRUCTION. ALL DAMPERS TO BE SET TO
<br />FULL OPEN DURING CONSTRUCTION PRIOR TO BALANCING.
<br />1. EQUIPMENT, GENERAL PROVIDE ALL EQUIPMENT AND TERMINAL UNITS CONSISTENT WITH THE SIZE, CAPACITY,
<br />MANUFACTURER, MODEL NUMBER, AND ACCESSORIES, AS SPECIFIED OR INDICATED ON THE DRAWING SCHEDULES AND
<br />4. DUCT DIMENSIONS SHOWN ARE INSIDE SHEET METAL DIMENSIONS OR CLEAR OPENING INSIDE LINED
<br />NOTES. EQUIPMENT SUPPLIERS SHALL VERIFY THAT MODEL NUMBERS AND SIZES ARE CONSISTENT WITH CAPACITY,
<br />DUCT. THE FIRST NUMBER REPRESENTS THE WIDTH OF DUCT IN PLAN VIEW.
<br />FEATURES, AND ACCESSORIES CALLED FOR, AND IDENTIFY ANY CONFLICTS PRIOR TO SUBMITTING QUOTATIONS TO
<br />CONTRACTORS. ALL EQUIPMENT WITH ELECTRICAL COMPONENTS SHALL HAVE UL LISTING AND HIGH SHORT CIRCUIT
<br />5. ALL ELBOWS SHALL BE LONG RADIUS ELBOWS WHEREVER POSSIBLE OR SHALL HAVE TURNING VANES
<br />CURRENT RATINGS (SCCR) WHERE REQUIRED BY THE ELECTRICAL INSPECTOR. ALTERNATE MANUFACTURERS WILL BE
<br />WHERE INDICATED ON PLANS. NO SQUARE THROAT OR ZERO RADIUS ELBOWS ALLOWED.
<br />CONSIDERED; HOWEVER, A/E FINAL APPROVAL OF EQUALITY OF ALTERNATE MANUFACTURER MODELS IS REQUIRED.
<br />ACCEPTABLE ALTERNATE MANUFACTURERS INCLUDE GREENHECK, PENN, COOK, MCQUAY, TRANE, CARRIER, YORK, TITUS,
<br />6. All DUCT BRANCH CONNECTIONS TO DIFFUSERS OR GRILLES AND TO OR FROM MAIN DUCTS, SHALL
<br />CARNES, ENVIRO-TEC, OR AS INDICATED OR PRIOR APPROVED OTHERWISE. ALTERNATE MANUFACTURERS WITH PRIOR
<br />INCLUDE MANUAL VOLUME DAMPERS. ALL SPIN -IN FITTINGS SHALL BE CONICAL, RECTANGULAR
<br />APPROVAL ARE STILL RESPONSIBLE FOR MEETING OR EXCEEDING THE QUALITY AND FEATURES OF THE SPECIFIED ITEMS.
<br />BRANCH DUCT TAKEOFFS SHALL HAVE 45' TAKEOFFS.
<br />CONTROLS
<br />A. GENERAL
<br />1. WORK INCLUDED: PROVIDE COMPLETE, OPERATING CONTROL SYSTEMS MEETING THE REQUIREMENTS INDICATED ON
<br />THE SEQUENCE OF OPERATION (SEE DRAWINGS). ALL ELECTRICAL COMPONENTS SHALL HAVE UL LISTING WHERE
<br />AVAILABLE. THE CONTROL SYSTEM SHALL BE MANUFACTURED AND INSTALLED BY THE OWNER PREFERRED BAS
<br />CONTRACTOR AND SHALL BE FULLY INTEGRATED INTO THE EXISTING SYSTEM. ALTERNATE INSTALLERS OR MANUFACTURERS
<br />WILL BE CONSIDERED; HOWEVER, A/E FINAL APPROVAL OF EQUALITY OF ALTERNATES IS REQUIRED. ALTERNATE
<br />INSTALLERS AND MANUFACTURERS WITH PRIOR APPROVAL ARE STILL RESPONSIBLE FOR MEETING OR EXCEEDING THE
<br />QUALITY, FEATURES, AND CAPABILITIES OF THE SPECIFIED.
<br />2. CONTROL SYSTEM DESIGN: PROVIDE ALL DESIGN WORK FOR CONTROL SYSTEMS. PREPARE COMPLETE SHOP
<br />DRAWINGS SHOWING ALL WIRING AND SUBMIT TO THE A/E FOR REVIEW ALONG WITH CONTROL COMPONENT SUBMITTALS.
<br />PROVIDE THOROUGH COORDINATION WITH THE ELECTRICAL SUBCONTRACTOR AND OTHER MECHANICAL TRADES, AS WELL AS
<br />EQUIPMENT SUPPLIERS.
<br />3. TESTING: PROVIDE THOROUGH TESTING OF THE COMPLETED CONTROL SYSTEMS TO ENSURE THAT THEY PERFORM
<br />AS REQUIRED. REFER TO THE WSEC C408.
<br />B. MISCELLANEOUS CONTROL ACCESSORIES
<br />1. GENERAL ACCESSORIES: PROVIDE ALL ITEMS, WHETHER ADDRESSED HEREIN OR NOT, REQUIRED FOR A COMPLETE
<br />AND OPERATING SYSTEM CONSISTENT WITH INDUSTRY STANDARDS. REFER TO THE SEQUENCE OF OPERATION FOR
<br />REQUIREMENTS RELATING TO CERTAIN COMPONENTS.
<br />2. CONTROL VALVES (SMALL): ALL VALVES 125 PSIG MINIMUM WORKING PRESSURE. ALL VALVES SHALL GIVE
<br />EFFECTIVE CONTROL AT ANY PRESSURE DIFFERENTIAL TO 50 PSIG. GLOBE -STYLE OR BALL -STYLE, TWO-WAY
<br />PROPORTIONAL TYPE OR THREE-WAY MIXING TYPE AS INDICATED. BRONZE BODY FOR SIZE 2 INCHES AND SMALLER.
<br />EXCEPT FOR DIFFERENTIAL PRESSURE CONTROL VALVES, PRESSURE DROP NOT TO EXCEED 3 PSIG AT MAXIMUM FLOW
<br />RATE UNLESS INDICATED OTHERWISE. SIZE VALVES AS CLOSE AS POSSIBLE FOR 3 PSIG PRESSURE DROP.
<br />TESTING, ADJUSTING AND BALANCING
<br />1. TESTING AND ADJUSTING: SUBJECT SYSTEMS TO SUCH OPERATING TESTS AS ARE REQUIRED TO DETERMINE THAT
<br />THE EQUIPMENT INSTALLED WILL OPERATE PER THE SPECIFIED CAPACITY, RANGES, AND SEQUENCE OF OPERATION.
<br />SIMULATE ALL NORMAL AND POSSIBLE ABNORMAL CONDITIONS TO VERIFY PROPER OPERATION IN ALL CONDITIONS. IF
<br />TESTS DO NOT DEMONSTRATE SATISFACTORY SYSTEM PERFORMANCE, CORRECT DEFICIENCIES AND RETEST SYSTEMS.
<br />CONTRACTOR SHALL FURNISH TO THE OWNER A SIGNED STATEMENT INDICATING THAT TESTING HAS CONFIRMED PROPER
<br />OPERATION OF ALL SYSTEMS.
<br />2. BALANCING: PROVIDE THE SERVICES OF A QUALIFIED BALANCING FIRM TO OBTAIN AIR FLOWS WITHIN +0-10% OF
<br />THE AMOUNTS INDICATED ON THE DRAWINGS. BALANCING FIRM SHALL BE A MEMBER OF NEBB OR AABC. OBTAIN A/E
<br />APPROVAL OF THE BALANCING FIRM AT BEGINNING OF PROJECT. PROVIDE DRIVE ADJUSTMENTS AS REQUIRED TO OBTAIN
<br />THE FLOWS, AND PROVIDE TOTAL FLOW, PRESSURE, RPM AND AMPERAGE MEASUREMENTS AT ALL EQUIPMENT. AT THE
<br />COMPLETION OF THE PROJECT, COMPLETE AND SIGNED BALANCING REPORTS SHALL BE SUBMITTED TO THE A/E AND
<br />OWNER INDICATING ALL MEASURED VALUES ALONG WITH CORRESPONDING DESIGN VALUES AND NOTES/DISCUSSION WHERE
<br />RESULTS WERE NOT WITHIN 10% OF DESIGN VALUES.
<br />7. PROVIDE CONCEALED OR REMOTE DAMPER REGULATORS OR ACCESS DOORS FOR ALL MANUAL VOLUME
<br />DAMPERS LOCATED THAT ARE INACCESSIBLE. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING
<br />TYPES. ALL FINAL ACCESS DOOR LOCATIONS SHALL BE APPROVED BY ARCHITECT PRIOR TO
<br />INSTALLATION.
<br />8. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND FIRE/SMOKE DAMPERS WHERE INDICATED ON PLANS
<br />AND AS REQUIRED BY IBC 717. PROVIDE CEILING FIRE DAMPERS WHERE INDICATED ON PLANS AND
<br />AS REQUIRED BY IBC 717.6.2.1. INSTALL FIRE DAMPERS SMOKE DAMPERS AND FIRE/SMOKE
<br />DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING,
<br />AND THE REQUIREMENTS OF THE CURRENT IMC.
<br />9. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED
<br />WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL.
<br />10. FLEXIBLE DUCTWORK SHALL BE RATED CLASS I, WHEN TESTED UNDER THE REQUIREMENTS OF UL181.
<br />FLEXIBLE DUCT LENGTH SHALL NOT EXCEED (6) FEET.
<br />11. FLEX AND DUCTWORK SHALL NOT BE CONNECTED DIRECTLY TO DIFFUSER OR GRILLES UNLESS
<br />INDICATED IN DRAWINGS. DIFFUSER / GRILLE BOXES WITH LINER AND PERFORATED DIFFUSER PLATES
<br />SHALL BE USED.
<br />12. PROVIDE DIFFUSER AND GRILLE FRAMES COMPATIBLE WITH ARCHITECTURAL CEILING TYPES AND
<br />COORDINATE LOCATIONS WITH THE ARCHITECTURAL REFLECTED CEILING PLAN AND ELECTRICAL LIGHTING
<br />LAYOUT.
<br />13. COORDINATE LOCATIONS OF ALL ROOM THERMOSTATS OR ROOM TEMPERATURE SENSORS WITH
<br />ARCHITECT PRIOR TO INSTALLATION.
<br />2018 WSEC HVAC NOTES
<br />1. HEATING AND COOLING LOADS HAVE BEEN PERFORMED PER ASHRAE STANDARDS.
<br />2. HVAC EQUIPMENT SIZED NO LARGER THAN THE NEXT LARGEST UNIT AVAILABLE ABOVE THE CALCLATED
<br />HEATING/COOUNG LOADS PER 2021 WSEC C403.3.1.
<br />3. CONTROLS TO USE A 5"F MINIMUM DEADBAND BETWEEN HEATING AND COOLING PER 2021 WSEC
<br />C403.4.1.2.
<br />4. INTERIOR ZONES SHARING AN OPEN SPACE WITH PERIMETER ZONES SHALL NOT PROVIDE COOLING
<br />UNLESS ZONE TEMPERATURE IS 5"F ABOVE PERIMETER ZONE TEMPERATURE PER 2021 WSEC C403.4.1
<br />EXCEPTION 2.
<br />5. AUTOMATIC SETBACK/SHUTOFF: PROVIDE WITH DOC CONTROL SYSTEM AS PER 2021 WSEC C403.4.2.2.
<br />6. AUTOMATIC START AND STOP CONTROLS: PROVIDE WITH AUTOMATIC START AND STOP CONTROLS AS
<br />PER 2021 WSEC C403.4.2.3.
<br />7. WHERE LOCATED WITHIN UNCONDITIONED SPACE AND PLENUMS ALL SUPPLY AND RETURN DUCTWORK
<br />SHALL BE INSULATED WITH A MINIMUM OF R-6 INSULATION. WHERE SUPPLY AND RETURN DUCTWORK
<br />IS LOCATED OUTSIDE OF A BUILDING DUCT SHALL BE INSULATED TO A MINIMUM OF R-8 (CLIMATE
<br />ZONE 4).
<br />8. SUPPLY DUCT WHICH CONVEYS SUPPLY AIR AT TEMPERATURES LESS THAN 55 DEG F OR GREATER
<br />THAN 105 DEG F, WHEN LOCATED IN CONDITIONED SPACE, SHALL BE INSULATED WITH A MINIMUM
<br />INSULATION R-VALUE IN ACCORDANCE WITH TABLE C403.10.1.2.
<br />9. RETURN OR EXHAUST DUCTWORK THAT IS LOCATED WITHIN A CONDITIONED SPACE AND CONVEYS
<br />RETURN OR EXHAUST AIR DOWNSTREAM OF AN ENERGY RECOVERY DEVICE SHALL BE INSULATED WITH
<br />A MINIMUM R-VALUE IN ACCORDANCE WITH TABLE C403.10.1.2
<br />10. PROVIDE HYDRONIC BALANCING DEVICES IN ALL HEATING AND COOLING COILS AS REQUIRED BY 2021
<br />WSEC C408.2.2.2.
<br />11. ALL HYDRONIC PIPING THAT SERVES AS PART OF A HEATING OR COOLING SYSTEM SHALL BE
<br />INSULATED IN ACCORDANCE WITH TABLE C403.10.3 OF THE 2021 WSEC. ALL GLASS FIBER
<br />PREFORMED PIPE INSULATION SHALL MEET ASTM C547.
<br />12. ENERGY METERING: METERS ARE PROVIDED FOR ENERGY SOURCES AS PER 2021 WSEC C409
<br />INCLUDING 409.3.1 FOR ALL WAG EQUIPMENT WITH THE EXCEPTION OF ENERGY SERVING PROCESS
<br />LOADS LESS THAN 50 KVA, SERVICE WATER HEATING LESS THAN 50 KVA OR OTHER MISCELLANEOUS
<br />LOADS PER C409.3
<br />13. MOTORS THAT ARE 5 HP OR LARGER SHALL BE EQUIPPED WITH VARIABLE SPEED DRIVES OR OTHER
<br />MEANS OF CONTROLS TO PROVIDE FAN MOTOR DEMAND OF NO MORE THAN 30 PERCENT OF DESIGN
<br />WATTAGE AT 50 PERCENT AIR VOLUME AND 1/3 MAXIMUM STATIC PRESSURE; 50 PERCENT OF DESIGN
<br />WATER FLOW FOR PUMPS.
<br />14. ALL HVAC EQUIPMENT SHALL MEET MINIMUM EFFICIENCY REQUIREMENTS INDICATED IN TABLES
<br />C403.3.2(1) THROUGH C403.3.2(16). WHERE MULTIPLE RATING REQUIREMENTS EXIST, THE EQUIPMENT
<br />SHALL SATISFY ALL STATED REQUIREMENTS.
<br />2018 WSEC COMMISSIONING NOTES
<br />1. DOCUMENTS DESCRIBED IN CURRENT WSEC C103.6, INCLUDING RECORD DOCUMENTS, MANUALS,
<br />COMPLIANCE DOCUMENTATION, AND SYSTEM OPERATION TRAINING, SHALL BE PROVIDED TO THE
<br />BUILDING OWNER OR OWNER'S AUTHORIZED AGENT WITHIN 90 DAYS OF THE DATE OF RECEIPT OF
<br />THE CERTIFICATE OF OCCUPANCY.
<br />2. A BUILDING COMMISSIOING PROCESS SHALL BE COMPLETED PER REQUIREMENTS LISTED IN CURRENT
<br />WSEC C408.
<br />3. A FINAL COMMISSIONING REPORT AS DESCRIBED BY CURRENT WSEC C408.1.3 SHALL BE REQUIRED
<br />AND INCLUDES FUNCTIONAL PERFORMANCE TEST RESULTS, DESCRIPTIONS OF DEFICIENCIES & DETAILS
<br />OF CORRECTIVE MEASURES, AND FUNCTIONAL PERFORMANCE TEST RESULTS.
<br />4. WAG SYSTEMS SHALL BE BALANCED AS REQUIRED BY CURRENT WSEC C408.2.2.
<br />5. MECHANICAL EQUIPMENT AND CONTROLS SHALL BE COMMISSIONED PER CURRENT WSEC C408.2.
<br />FUNCTIONAL PERFORMANCE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH WSEC C408.2.3.
<br />O
<br />2
<br />(N
<br />O 11
<br />Z
<br />t V
<br />U) N
<br />m a
<br />Z.
<br />-cw
<br />Ez
<br />LLl
<br />a z ;.;
<br />V
<br />�g BI
<br />�
<br />.41I°I
<br />2727 Oakes Ave.
<br />Suite 100
<br />Everett, WA 98201
<br />REVISIONS
<br />A DOt1 REVII 12/11/24
<br />ala WAN�LI'
<br />FT
<br />s'9941
<br />J4VAL �'
<br />1911W94
<br />z_j
<br />0 Q
<br />U Ld
<br />,Ld =
<br />V /
<br />IU Q
<br />Li 0
<br />U �
<br />(Qn Q
<br />LLJ W
<br />U m
<br />LLJ
<br />0
<br />> 0
<br />00
<br />� LL
<br />242095
<br />aeAwu CEI
<br />ON
<br />PERMIT SET
<br />08/22/24
<br />MECHANICAL
<br />SPECIFICATIONS
<br />J
<br />M0.2
<br />City of Everett Permit Services
<br />EVERETT Reviewed for Permit 01/14/2025