My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Landscape Structures, Inc./KCDA 5/5/2025
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Landscape Structures, Inc./KCDA 5/5/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 11:35:26 AM
Creation date
5/8/2025 11:33:41 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Landscape Structures, Inc./KCDA
Approval Date
5/5/2025
Council Approval Date
4/30/2025
End Date
12/31/2025
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Lowell Park Playground Replacement
Tracking Number
0004814
Total Compensation
$274,960.09
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Agreement between Client, KCDA and Contractor - Washington Page 1 <br />156691459.1 <br />AGREEMENT <br />BETWEEN <br />CITY OF EVERETT (“CLIENT”), <br />KING COUNTY DIRECTORS’ ASSOCIATION (“KCDA”), <br />AND <br />LANDSCAPE STRUCTURES, INC., (“CONTRACTOR”) <br />This AGREEMENT is made as of the 8th day of September, 2025, between the public entity City of Everett <br />(“Client”) 2930 Wetmore Avenue, Everett, WA 98201 (address); King County Directors Association (KCDA), <br />Street Address: 18639 - 80th Ave S, Kent, WA 98032; and the Contractor: Landscape Structures, Inc. <br />This Agreement supplements the King County Directors’ Association (“KCDA”) Purchase Order <br />Number 4147945 (“Purchase Order”) for the Client. <br />A general description of the Project is: <br />Playground replacement work includes demolition of the existing playground, removal of the engineered <br />wood fiber surfacing system, construction of a new forever lawn surfacing system, and installation of the new <br />playground equipment. <br />The Architect/Engineer (“A/E”), if any, is: <br />The Client, KCDA, and Contractor agree as set forth below. <br />ARTICLE 1 <br />THE WORK <br />1.1 This Agreement provides supplemental terms and conditions to the Purchase Order and is <br />incorporated by reference into the Purchase Order as if set forth in full therein. This Agreement shall be <br />completed and executed for all KCDA projects that include any on-site construction activities. The Contractor <br />shall fully execute and complete the entire Work described in the Contract Documents. <br />ARTICLE 2 <br />DATES OF COMMENCEMENT AND SUBSTANTIAL AND FINAL COMPLETION <br />2.1 The date of commencement of the Work (the date from which the Contract Time is measured) <br />shall be the date established in a notice to proceed issued by the Client, unless a different date is stated below: <br />2.2 The Contractor shall achieve Substantial Completion of the entire Work no later than 11/21/2025 <br />and Final Completion no later than 12/31/2025, subject to adjustments of the Contract Time as provided in the <br />Contract Documents. <br />2.3 Liquidated damages, if any, shall be $0.00 per day for each calendar day after the Contract Time <br />that Substantial Completion is not attained, and shall be paid to the Client.
The URL can be used to link to this page
Your browser does not support the video tag.