My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Landscape Structures, Inc./KCDA 5/5/2025
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Landscape Structures, Inc./KCDA 5/5/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 11:35:26 AM
Creation date
5/8/2025 11:33:41 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Landscape Structures, Inc./KCDA
Approval Date
5/5/2025
Council Approval Date
4/30/2025
End Date
12/31/2025
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Lowell Park Playground Replacement
Tracking Number
0004814
Total Compensation
$274,960.09
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Agreement between Client, KCDA and Contractor - Washington Page 2 <br />156691459.1 <br />ARTICLE 3 <br />CONTRACT SUM <br />3.1 KCDA shall pay the Contractor for the Contractor’s performance of the Contract the Contract <br />Sum of five hundred twenty-three thousand one hundred sixty-six dollars and sixty cents ($523,166.60), subject <br />to additions and deductions as provided in the Contract Documents. Sales tax is not included in the Contract <br />Sum and shall be added to the invoice between the Contractor and KCDA and to the invoice between KCDA <br />and the Client. <br />The contract sum has been derived from the contractor’s bid to KCDA directly, or to KCDA through the <br />Association of Educational Purchasing Agencies (AEPA) dated April 10, 2025, and is made up of the following <br />components: Worksheet #2409-12463-03-02. <br />3.2 The Contract Sum is based upon and includes the following alternates, if any, which are <br />described in the Contract Documents and are hereby accepted by the Client: <br />3.3 Unit prices beyond those listed in the Contractor’s Bid to KCDA or AEPA, if any, are as <br />follows: N/A. <br />3.4 Allowances, if any, are as follows: N/A. <br />3.5 If this Agreement is for a Project for the Contract Sum of one million dollars or more, complete <br />below the names of the following subcontractors with whom the Contractor will subcontract for performance of <br />the work: <br />_________________________ HVAC (heating, ventilation, and air conditioning) <br />_________________________ Plumbing as described in chapter 18.106 RCW. <br />_________________________ Electrical as described in chapter 19.28 RCW. <br />_________________________ Structural Steel Installation <br />_________________________ Rebar Installation <br />3.6 If the amount of the Contract Sum listed in Section 3.1 above is one million dollars or more, then <br />this Project is subject to the apprenticeship requirements of RCW 39.04.320 and Section 10.17 in the attached <br />General Conditions. If the amount of the Contract Sum listed in Section 3.1 is less than one million dollars, <br />then such apprenticeship requirements do not apply. <br />ARTICLE 4 <br />PAYMENT <br />4.1 Whenever this Agreement states that KCDA will make payments, the parties agree that payment <br />from the Client to KCDA is a condition precedent to payment from KCDA to the Contractor and that KCDA <br />will use such payments from the Client to pay Contractor. KCDA will make payments to the Contractor as <br />provided below and elsewhere in the Contract Documents based upon Application(s) for Payment submitted by <br />the Contractor and per Article 15. KCDA will schedule final payment, constituting the entire unpaid balance of
The URL can be used to link to this page
Your browser does not support the video tag.